Extension of Township car parking at 400 kV Substation Shahjahanpur
NR3/NT/W-CIVIL/DOM/K00/26/05349
Limited
Civil - All
Works
400 kV Substation Shahjahanpur
₹13,000
15 Apr 2026
15 Apr 2026
4 May 2026
15 Apr 2026
30 Apr 2026
15 Apr 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and filling in plinth with Jamuna sand under floors including watering, ramming consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate:40mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate:40mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings,bases of columnsetc for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars.of grade Fe-500D or more.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand).
12 mm cement plaster of mix 1:6 (1 cement:6 coarse sand )
Providing Design, Supply , Fabrication ,erection and installation of Steel Structure work in mild steel built up Tubular Structure made from Steel hollow sections from APOLLO/ JINDAL/ISI marked & equivalent including cutting, welding , hosting in position , Apply one coat Duco primer over one coat Duco paint including Providing and Fixing imported 750 GSM tensile fabric make serge Ferrari or as approved, Flame Retardant, UV treated, Antibacterial. This Should also include, Survey , patterning, cutting, welding and neccessary hardware .SStainless Steel 304 grade swage stud Galvanised cable for fixing the fabric as per per drawing, Membrane shall be cut and manufactured with High frequency PVC Wielding Machine, all complete as per Drawing.
Name Surmane
Title
DD-MMM-YYYY
India
Udyam Certificate No.
Dessignation:
Ref. of page, Clause & Name of Documents
Date of Retirement/ Resignation from POWERGRID
Designation:
Yes /No
Partial offloading under a Contrct and/or Facilitation beyond 10% of the Contract Price shall also be treated as Termination. For the said purpose, the Contract price means the Contract Price of the Facilities notwithstanding the Construction of the Contract
In case POWERGRID has issued a letter in this regard wherein the firm has been put on hold from award of further contract(s) for a specified period and this specified period of hold is yet to expire, the bidder shall indicate “Yes” against this event.
For the purpose of working out 50% of the Contract, following shall be taken into account suitably:
Main aspect of the QR
50% of the total supply of Conductor/ Insulator under the Contract
50% of the total Transmission Line construction under the Contract
50% of the total bays construction under the Contract
50% of the total supply of Transformer/ Reactor under the Contract
50% of the total supply of GIS bays under the Contract
Regarding Sr. No. 6, in case of ‘Yes’, following information shall be submitted additionally:
Designation:
Designation:
Designation:
Designation:
Saving Account
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Annexure-I Instructions to Bidders.docx
docx • 0.07 MB
Annexure-II Conditions of Contract.docx
docx • 0.09 MB
Annexure-III Floor Drawing.pdf
pdf • 0.05 MB
Annexure-III Indicative BOQ.xlsx
xlsx • 0.02 MB
Annexure-III Make list.pdf
pdf • 0.37 MB
Annexure-III SFQP.pdf
pdf • 2.72 MB
Annexure-III Sttructural Drawing.pdf
pdf • 0.37 MB
Annexure-III Technical Specification.pdf
pdf • 0.35 MB
Appendix-I to Conditions of Contract.docx
docx • 0.03 MB
Attachment 4 (Affidavit for self-certificataion).DOCX
docx • 0.02 MB
Bid Form.xlsx
xlsx • 0.05 MB
Bid Security Format.docx
docx • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .