Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Nomination₹2.0 CrAccepted-AOC | ₹2.0 Cr | Nomination | Accepted-AOC Awarded on nomination basis |
Tender Value
Refer Docs
Closing Date
13 Jan 2022, 3:00 pmClosed
Chief Engineer (GSS)
3rd Floor, V.S.Bhavan, Anushaktinagar, Mumbai-400094
Modification Modernization of lifts at Akashratna and Akashdeep buildings, Anushaktinagar, Mumbai
2021_DCSEM_665317_1
DCSE/CQD/QSC/GSS/21-22/NIT-21 dt.27.12.2021
Single
Electrical Works
Item Rate
365 days
Anushaktinagar, Mumbai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
8 Apr 2022
28 Dec 2021
14 Jan 2022
28 Dec 2021
13 Jan 2022
28 Dec 2021
28 Dec 2021 - 4 Jan 2022
Amount
Modification/modernization of exisitng lift including partially dismantling of existing 13 passenger elevator including design, fabrication, manufacture, assembly, Inspection & testing at work, delivery to site, installation, testing, commissioning and handing over of 13 passenger lift having min. 1.5 mps speed serving 13 floors in the existing lift shaft including associated civil works etc. as per tender specifications & relevant codes, lift rules/Acts, IS/International standard, as per instruction of E.I.C & any other work which is required for modification of lift. Note: a. All the lift components shall be replaced except following: i) car rails and counter rails, ii) car and counter weight frames with filler weights, iii) landing doors iv) car cabin b. All the dismantled materials of elevators shall be taken away by the agency & suitable rebate shall be included in the quoted rates. Note: 1)Free comprehensive maintenance period is 12 months from the date of handing over of all 08nos. of lifts with lift licenses. However, renovated elevators completed in phase-I shall be released for use of Dept. before staring phase-II work
Modification/modernization of exisitng lifts including partially dismantling of existing 8 passenger elevator including design, fabrication, manufacture, assembly, Inspection & testing at work, delivery to site, installation, testing, commissioning and handing over of 8 passenger lift having min. 1.5 mps speed serving 13 floors in the existing lift shaft including associated civil works etc. as per tender specifications & relevant codes, lift rules/Acts, IS/International standard, as per instruction of E.I.C & any other work which is required for modification of lift. Note: All the lift components shall be replaced except following: i) car rails and counter rails, ii) car and counter weight frames with filler weights, iii) landing doors iv) car cabin b. All the dismantled materials of elevators shall be taken away by the agency & suitable rebate shall be included in the quoted rates. Note: 1)Free comprehensive maintenance period is 12 months from the date of handing over of all 08nos. of lifts with lift licenses. However, renovated elevators completed in phase-I shall be released for use of Dept. before staring phase-II work
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .