| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.2 L+₹1,557.68 (0.50%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.2 L+₹1,907.36 (0.61%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.2 L
EMD Value
₹6,358
Closing Date
6 Aug 2026, 5:00 pmClosed
Secretary
SRMC, Pradhannagar, Darjeeling
Construction of Four numbers of Garbage vat at Siliguri PM Yard under Siliguri RMC.
2026_WBSMB_5017044_1
RMC/01-SEC/SLG/2026-27, Dated 20/07/2026
Open Tender
CIVIL WORKS
Percentage
60 days
SILIGURI
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
₹6,358
29 Sept 2026
20 Jul 2026
10 Aug 2026
20 Jul 2026
6 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Works | - | - | - | - |
| 2 | Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. | 15.75 | Cu.m | 1,956 | ₹30,810.91 |
| 3 | Earth work in excavation of foundation trenches or drains in all sorts of soil ( including mixed soil but excluding laterite or sand stone ), including removing, spreading or stacking the spoils with in a lead of 75 m. as directed and including trimming the side of trenches, leveling, dressing the bottom, bailing out water etc. as required complete.(a) Depth of excavation not exceeding 1500 mm | 49.51 | Cu.m | 119.27 | ₹5,905.3 |
| 4 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 70.05 | Sq.m | 346 | ₹24,237.99 |
| 5 | Filling in foundation and plinth by silver sand in layers not exceeding 150 mm as directed and consolidating same by through saturation with water ramming complete, including the cost of supply of sand.(Payment to be made on measurement of finished quantity) | 24.81 | Cu.m | 543.51 | ₹13,485.57 |
| 6 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor
(A) [Pakur Variety]
(a) 1:3:6 proportion | 9.6 | Cu.m | 4,648 | ₹44,639.39 |
| 7 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor) .
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
i) Foundation and Plinth | 11.76 | Sq.m | 359 | ₹4,221.84 |
| 8 | Brick work with 1st class bricks in cement mortar (6:1).
a) In Foundation and plinth | 8.82 | Cu.m | 5,158 | ₹45,493.56 |
| 9 | 125 mm. thick brick work with 1st class bricks in cement mortar (6:1) in ground floor. | 60.9 | Sq.m | 707 | ₹43,056.3 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or rougening of concrete surface, including throating, nosing and drip course where necessary (ground floor)
(ii) With 1:4 cement mortar
(b) 15 mm thick plaster | 172.5 | Sq.m | 153 | ₹26,392.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_5086969.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .