| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-Finance | ₹18.5 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹18.6 L+₹6,436.15 (0.35%)Accepted-Finance | ₹18.6 L+₹6,436.15 (0.35%) | L2 | Accepted-Finance Admitted |
| 3 | L3₹18.9 L+₹37,169.40 (2.01%)Accepted-Finance | ₹18.9 L+₹37,169.40 (2.01%) | L3 | Accepted-Finance Admitted |
| 4 | L4₹20.9 L+₹2.4 L (13.0%)Accepted-Finance | ₹20.9 L+₹2.4 L (13.0%) | L4 | Accepted-Finance Admitted |
| 5 | L5₹24.0 L+₹5.5 L (29.5%)Accepted-Finance | ₹24.0 L+₹5.5 L (29.5%) | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | PADMA NYINGPO L1 | SP.FABRICATION L5 | M/S SD FABRICATION L3 | SONAM STOBGIAS L4 | M/S RIGZIN PALGON GOVT CONTRACTOR L6 | M/S GYALCHAN STEEL FABRICATION L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Plantation Work | |||||||||
| 1.01 | Purchase of willow green cutting from progressive farmer, this including collection bundling and internal carriage etc. | 5,000 | Nos | 20 ₹1,00,000 Lowest | 110 ₹5,50,000 | 30 ₹1,50,000 | 30 ₹1,50,000 | 120 ₹6,00,000 | 70 ₹3,50,000 |
| 1.02 | Pits Planting of willow green cutting this including excavation of pits 0.45x0.45x0.45m along the contour as well as on flat surface. | 5,000 | Nos | 20 ₹1,00,000 | 50 ₹2,50,000 | 30 ₹1,50,000 | 30 ₹1,50,000 | 20 ₹1,00,000 | 10 ₹50,000 Lowest |
| 1.03 | Carriage of planting materials from near sources to planting site by M. transport, this includes loading and unloading charges etc. | 5,000 | 2 trip | 20 ₹1,00,000 | 10 ₹50,000 | 5 ₹25,000 Lowest | 15 ₹75,000 | 10 ₹50,000 | 7 ₹35,000 |
| 1.04 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | 378 | cum | 500 ₹1,89,000 | 390 ₹1,47,420 | 250 ₹94,500 | 110 ₹41,580 | 200 ₹75,600 | 100 ₹37,800 Lowest |
| 2.00Fencing Work | |||||||||
| 2.01 | Earth work in excavation by manual means over area( Exceeding30 Cm and Up to 1.5mtr in width as well as 10sqmt on plan) including disposal of excavated earth lead up to 50m and lift up to 1.5m.
All kind of soil. | 43.28 | cum | 450 ₹19,476 | 550 ₹23,804 | 200 ₹8,656 | 250 ₹10,820 | 300 ₹12,984 | 100 ₹4,328 Lowest |
| 2.02 | Providing and laying in position cement concrete of specified grade include. Curing but excluding the cost of centering and shuttering. all work up to plinth level 1:3:6 ( 1 cement, 3 fine sand 6 stone agg 20 mm nominal sizes) crushed stone aggregate) in blocks. | 43.28 | cum | 120 ₹5,193.6 Lowest | 4,000 ₹1,73,120 | 6,000 ₹2,59,680 | 7,500 ₹3,24,600 | 6,600 ₹2,85,648 | 5,500 ₹2,38,040 |
| 2.03 | Providing and fixing of angle iron fence post msde of MS angles (50mx50x6mm) in built up sections and framed works including. Cutting housing single section 2.14 mtr long with 15cm foot/toe at bottom with holes drilled and top bend. | 4,574.25 | kgs | 115 ₹5,26,038.75 | 93 ₹4,25,405.25 | 100 ₹4,57,425 | 105 ₹4,80,296.25 | 100 ₹4,57,425 | 90 ₹4,11,682.5 Lowest |
| 2.04 | Centering and shuttering including structing propping etc.and removal of form for. Foundations, footings bases of columds etc for mass concrete. | 40.5 | sqm | 115 ₹4,657.5 Lowest | 300 ₹12,150 | 120 ₹4,860 | 300 ₹12,150 | 450 ₹18,225 | 150 ₹6,075 |
Tender Value
₹27.7 L
EMD Value
₹55,340
Closing Date
8 Jun 2026, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road UT of Ladakh
Planting of willow green cuttings and providing and laying of chain link fencing in cement concrete at panamik thang community area of Nubra Forest Range for the year 2026-27 under SDP scheme
2026_FEE_19002_1
E-NIT 01 of FDL 2026-27
Open Tender
Civil Works - Others
Item Rate
30 days
Nubra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Divisional Forest Officer, Leh
₹55,340
8 Jul 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Plantation Work | |||||
| 1.01 | Purchase of willow green cutting from progressive farmer, this including collection bundling and internal carriage etc. | 5,000 | Nos | - | - |
| 1.02 | Pits Planting of willow green cutting this including excavation of pits 0.45x0.45x0.45m along the contour as well as on flat surface. | 5,000 | Nos | - | - |
| 1.03 | Carriage of planting materials from near sources to planting site by M. transport, this includes loading and unloading charges etc. | 5,000 | 2 trip | - | - |
| 1.04 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | 378 | cum | - | - |
| 2Fencing Work | |||||
| 2.01 | Earth work in excavation by manual means over area( Exceeding30 Cm and Up to 1.5mtr in width as well as 10sqmt on plan) including disposal of excavated earth lead up to 50m and lift up to 1.5m.
All kind of soil. | 43.28 | cum | - | - |
| 2.02 | Providing and laying in position cement concrete of specified grade include. Curing but excluding the cost of centering and shuttering. all work up to plinth level 1:3:6 ( 1 cement, 3 fine sand 6 stone agg 20 mm nominal sizes) crushed stone aggregate) in blocks. | 43.28 | cum | - | - |
| 2.03 | Providing and fixing of angle iron fence post msde of MS angles (50mx50x6mm) in built up sections and framed works including. Cutting housing single section 2.14 mtr long with 15cm foot/toe at bottom with holes drilled and top bend. | 4,574.25 | kgs | - | - |
| 2.04 | Centering and shuttering including structing propping etc.and removal of form for. Foundations, footings bases of columds etc for mass concrete. | 40.5 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_45345.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .