Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86.8 LAdmitted-Finance SAMBALPUR | KHORDHA | ODISHA | 751001 | +0.00% | ₹86.8 L | L1 | Admitted-Finance |
| 2 | L1₹86.8 LAdmitted-Finance | +0.00% | ₹86.8 L | L1 | Admitted-Finance |
| 3 | L1₹86.8 LAdmitted-Finance | +0.00% | ₹86.8 L | L1 | Admitted-Finance |
| 4 | L1₹86.8 LAdmitted-Finance | +0.00% | ₹86.8 L | L1 | Admitted-Finance |
| 5 | L1₹86.8 LAdmitted-Finance | +0.00% | ₹86.8 L | L1 | Admitted-Finance |
Tender Value
₹86.8 L
EMD Value
₹86,800
Closing Date
15 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, SAMBALPUR
Construction of 4 nos Flat Type F type Quarter Building at Dhama PHC for the year 2023-24
2026_CERWI_134326_1
TENDER ONLINE SBPR-05 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
Sambalpur
2 documents required · 2 mandatory
₹10,000
₹86,800
Yes
20 Aug 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
15 Jul 2026
4 Jul 2026
4 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil within 50 m initial loead and initieal lift, including dressing and levelling the bed etc. complete | 150.8 | cum | 282.9 | ₹42,661.32 |
| 2 | Filling in foundation and plinth with excavated earth including watering and ramming as directed by the E.I.C. etc. complete | 150.8 | cum | 188.6 | ₹28,440.88 |
| 3 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 146.8 | cum | 1,437.6 | ₹2,11,039.68 |
| 4 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 39.83 | cum | 6,208 | ₹2,47,246.64 |
| 5 | Cement Concrete (1:2:4) using 12mm size cbhg chips including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 11.22 | cum | 9,630.5 | ₹1,08,086.95 |
| 6 | R.C.C. M-20 using 20 mm & down size h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. For Column Base | 28.43 | cum | 8,222.8 | ₹2,33,774.2 |
| 7 | Plinth Beam | 8.95 | cum | 8,222.8 | ₹73,594.06 |
| 8 | Column / Beam (GROUND FLOOR) | 16.05 | cum | 18,063.2 | ₹2,89,914.36 |
| 9 | Column / Beam (FIRST FLOOR) | 14.14 | cum | 20,139.9 | ₹2,84,778.19 |
| 10 | Column / Beam (SECOND FLOOR) | 2.11 | cum | 22,610.3 | ₹47,707.73 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.64 MB
Tendernotice_1.pdf
PDF • 3.30 MB
BOQ_599588.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .