Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹23.5 L
EMD Value
₹2.4 L
Closing Date
4 Mar 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE PD GHAZIPUR
Construction of Mudiyar Harijan Basti sampark marg 5 Year maintenance work
2026_CEUVZ_1119758_2
810/10 Lekha dt. 21.02.2026
Open Tender
Civil Works - Roads
Fixed-rate
90 days
Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.4 L
Yes
13 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
Construction of Embankment with Material Obtained from R.O.W with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5I (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of granular sub-base by providing close graded material , spreading in uniform layer with motor grader on prepared surface , mixed by mix in place method rotavator at OMC, and compacting with smooth wheel roller to achieve the desireed density , complete as per technical specification Clause 401 as per direction of E/l (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing laying spreading and compacting (45-63mm) stone aggregate of specific sizes to Water bound Mcadam specification including spreading in uniform thichness hand packing, rolling with 3-wheel 80-100 kN static roller in stages to proper grade and camber to 7.50 cm compacted thickness applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification. Clause 405. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing laying spreading and compacting (22.4-53mm) stone aggregate of specific sizes to Water bound Mcadam specification including spreading in uniform thichness hand packing, rolling with 3-wheel 80-100 kN static roller in stages to proper grade and camber to 7.50 cm compacted thickness applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical Specification. Clause 405. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Brick edging 7cm wide on both sides of the road by M-150 bricks Complete for preventing the edges from breaking as per PWD details specification no. 20.15 (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying tack coat with V.G-10 using bitumen pressure distributor @ 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 of MORD Specification (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing, laying and rolling of Open-graded premix surfacing of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates either using penetration grade bitumen the required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant , laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade as per Technical Specification Clause 508 of MORD Specification. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 of MORD Specification (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 as per Technical Specification Clause 303.1
The routineMaintainance Work of above road. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 1st Year maintenance Cost
The routine Maintainance Work of above road. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 2nd Year maintenance Cost
The routineMaintainance Work of above road. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 3rd Year maintenance Cost
The routine Maintainance Work of above road. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 4th Year maintenance Cost
The routine Maintainance Work of above road. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 5th Year maintenance Cost
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2082528.xls
BOQ • 0.29 MB
T1.pdf
Tender Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .