Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.19Accepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹2.21+₹0.02 (0.91%)Rejected-Finance | 2 | Rejected-Finance 3 |
Tender Value
₹2.2 L
Closing Date
19 Aug 2021, 4:30 pmClosed
Executive engineer REW Division Ramban
Executive engineer REW Division Ramban
AS PER BOQ
2021_RDPR_133793_6
E NIT 06OF 2021
Open Limited
Civil Works
Item Rate
30 days
Ramsoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Division Ramban
Exempted
1 Sept 2021
9 Aug 2021
20 Aug 2021
9 Aug 2021
19 Aug 2021
9 Aug 2021
Amount
Earth work in excavation by manual means over areas (exceeding 30 cm in depth , 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lift complete, disposed earth to be levelled & neatly dressed in All kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level .1:5:10 ( 1 cement :5 fine sand :10 graded stone aggregate 40 mm nominal size ) Nallah.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level 1:3:6 ( 1 cement :3coarse sand :6 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls ( any thickness) including attached pilaster buttressess, plinth and string courses , fillets , columns, pillars , piers, abutments, posts and struts , etc up to floor five level excluding cost of centring shuttering finishing and reinforcement 1:2;4 (1 cement:2 coarse sand :4 graded crushed stone agg. 20 mm nominal )
Providing and laying Reinforcement cement concrete 1:1.5 :3 (1 cement:1 1.5 coarse sand :3 graded stone agg. 20 mm nominal ) in suspended floors, balconies, landings, and stair cases having slope upto 15, excluding the cost of centring shuttering
Reinforcement for RCC work including straightening,cutting bending, placing in position and binding all complete upto plinth level Thermo Mechanical Treated bars.
Centring and shuttering including strutting propping etc. and removal of form for :-Walls ( any thickness ) including attached pilasters , butteresses , plinth and string course
Centring and shuttering including strutting propping etc. and removal of form for :-Edges of slabs and breaks in floors and walls under 20cm wide
Provision of sign board
ATTA MOHD NAIK
Atta Mohd Naik
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .