| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAccepted-AOC A 8 MISSION COMPOUND SADAR BAZAR DISTRICT SAHARANPUR UTTAR PRADESH | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | ₹40.5 L Quoted ₹34.3 L | L1 | Accepted-AOC L1, Contract Value Including 18 percent GST |
| 2 | L2₹35.8 LRejected-AOC | ₹35.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹36.5 LRejected-AOC | ₹36.5 L | L3 | Rejected-AOC L3 |
| 4 | L4₹39.1 LRejected-AOC RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | ₹39.1 L | L4 | Rejected-AOC L4 |
| 5 | L5₹39.3 LRejected-AOC | ₹39.3 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Adesh Kumar L3 | M/S R.K. GUPTA AND SONS HUF L2 | M/S PUSHPENDER KUMAR SHARMA L7 | SHEESHPAL SINGH CONTRACTOR L6 | LANDMARK INFRA PROJECTS L5 | CHHATAR PAL SINGH CONTRACTOR L4 | GANPATI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes & thorny jungle without uprooting i/c cost of all material, Labour, T&P etc required for completion of proper work. | 9,000 | Sqm. | 3.34 ₹30,060 | 3.27 ₹29,430 | 4 ₹36,000 | 4 ₹36,000 | 0.4 ₹3,600 | 2.2 ₹19,800 | 4 ₹36,000 |
| 2.00 | Earth work in cutting or in embankment in ordinary soil , excavation to be in the form of regular pits and earth work in embankment to be in 20cm layer, including ramming and dressing the surface to the requried levels and slopes and also including 1.50 M lift and 30m lead. | 332.73 | Cum | 54.71 ₹18,203.66 | 53.63 ₹17,844.31 | 300 ₹99,819 | 65 ₹21,627.45 | 50 ₹16,636.50 | 44 ₹14,640.12 | 70 ₹23,291.10 |
| 3.00 | Supplying & laying 75 mm. thick (compacted ) size 53mm to 22.4 mm. stone ballast spreading and compacting stone aggregates of specific sizes to water bound macadam specifications including spreading in uniform thickness, rolling with smooth wheel/ vibratory roller 8 to 12 tonne in stages to proper grade and camber, applying and brooming stone screening/ binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density. (G-3) | 3,003.17 | Sqm. | 226.22 ₹6.8 L | 221.75 ₹6.7 L | 272 ₹8.2 L | 232 ₹7.0 L | 200 ₹6.0 L | 172 ₹5.2 L | 100 ₹3.0 L |
| 4.00 | Providing and applying primer coat over prepared surface of granular base with slow setting bitumen emulsion complying with IS:8887 with spray set including cleaning of WBM surface spraying primer @ 0.70 kg/sqm including cost of all material, Labour, T&P etc required for completion of proper work as per Mord specification. | 11,000 | Sqm. | 48.78 ₹5.4 L | 47.82 ₹5.3 L | 42 ₹4.6 L | 62 ₹6.8 L | 30 ₹3.3 L | 61 ₹6.7 L | 40 ₹4.4 L |
| 5.00 | Cleaning the existing painted surface and laying premix carpet 2 cm thick over a tack coat with graded approved grit and bitumen VG-30 including heating the paint and grit to the required temperature and mixing either in mixer/hand drum or by manual including cartage of material, maintenance of side patries and watering them during operation for proper completion of work as directed by the Engineer-in-charge including tack coat & all material ,labour, T&P and sundries to be arranged by the contractor. | 11,000 | Sqm. | 154.3 ₹17.0 L | 151.25 ₹16.6 L | 186 ₹20.5 L | 180 ₹19.8 L | 200 ₹22 L | 172 ₹18.9 L | 180 ₹19.8 L |
| 6.00 | Cleaning the premixing surface and laying seal coat with approved graded grit and bitumen including heating the paint to the required temperature and mixing either in mixer or hand drum including cartage of materials maintenance of sides patreis and watering them during operation for proper completion of the work as directed by the Engineer- incharge including all T&P and sundreis to be provided by the contractor complete. | 11,000 | Sqm. | 45.9 ₹5.0 L | 44.99 ₹4.9 L | 53 ₹5.8 L | 52 ₹5.7 L | 53 ₹5.8 L | 50 ₹5.5 L | 45 ₹5.0 L |
| 7.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015. The finished surface to be level uniform and free from streaks and holes. Rates are inclusive of all taxes , royalty etc all T&P / machine material and labour requried for proper completion of work. | 400 | Sqm. | 471.14 ₹1.9 L | 461.84 ₹1.8 L | 615 ₹2.5 L | 620 ₹2.5 L | 500 ₹2 L | 615 ₹2.5 L | 400 ₹1.6 L |
Tender Value
₹48.1 L
EMD Value
₹97,000
Closing Date
16 Feb 2026, 3:00 pmClosed
Superintending Engineer Drainage Circle Gzb
Near Victoria Park Colony Meerut
Renovation work of service road between km 47.190 to km 49.420 of Parallel Deoband Branch Feeder channel.
2026_UPIDC_1113787_2
06/SE/2025-26
Open Tender
Civil Works
30 days
Roorkee
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹97,000
Office of S.E.Drainage Circle gzb Meerut
9 Mar 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
11 Feb 2026
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid