| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC NIL NEAR BPCL PETROL PUMP MAKARPURA MANEJA VADODARA GUJARAT 390014 | VADODARA | GUJARAT | 390014 | ₹1.7 Cr | L1 | Accepted-AOC as per award given |
| 2 | L2₹3.2 Cr+₹1.4 Cr (81.6%)Rejected-AOC | ₹3.2 Cr+₹1.4 Cr (81.6%) | L2 | Rejected-AOC did not get order |
Tender Value
Refer Docs
Closing Date
15 Jul 2019, 3:00 pmClosed
Mandar G Karambelkar
Praj Industries Limited Praj Tower Sr No 274 and 275 Bhumkar Chowk Hinjewadi Road Hinjewadi Pune 411057
OUTDOOR TYPE OIL IMMERSED POWER TRANSFORMER
2019_REFHQ_96010_1
Outdoor type Oil immersed Power Transformer
Limited
Electrical - All
Supply
180 days
PANIPAT
As per RFQ
5 documents required · 5 mandatory
Exempted
Praj Tower Pune
29 Jul 2022
24 Apr 2019
16 Jul 2019
24 Apr 2019
15 Jul 2019
5 Jun 2019
8 May 2019
Supply of outdoor type oil immersed Power transformer Design, engineering, manufacturing, assembly, painting, inspection and testing , packing, preparation for shipments of transformers complete with all accessories, forwarding & supply at site, supply of mandatory & commissioning spares, tools & tackles, mechanical and performance guarantee of the transformers as per the requirements specified in the MR specifications (S-17047-4-EMR3511) and other related documents in the tender/bid. Each transformers shall be supplied complete with online PD monitoring system, 1st filling of oil plus 10% spare oil in non returnable drums, Touch-up paint of same shade (2 Ltr. for each Transformer) all fittings and accessories as detailed in this specification. This cost should include bidder/vendor TPIA charges.
25 MVA, 33/6.9 kV, Dyn11, Z=8% with ±10% tolerance, OLTC, ONAN transformer, taps +10% to-10% in steps of 1.25%.
Supply of outdoor type oil immersed Power transformer Design, engineering, manufacturing, assembly, painting, inspection and testing , packing, preparation for shipments of transformers complete with all accessories, forwarding & supply at site, supply of mandatory & commissioning spares, tools & tackles, mechanical and performance guarantee of the transformers as per the requirements specified in the MR specifications (S-17047-4-EMR3511) and other related documents in the tender/bid. Each transformers shall be supplied complete with online PD monitoring system, cooling fans, Fan control unit, 1st filling of oil plus 10% spare oil in non returnable drums, Touch-up paint of same shade (2 Ltr. for each Transformer) all fittings and accessories as detailed in this specification. This cost should include bidder/vendor TPIA charges.
20/22 MVA, 33/6.9 kV, Dyn11, Z=8% with ±10% tolerance, OLTC, ONAN/ONAF transformer, taps +10% to-10% in steps of 1.25%.
Charges for site supervision of erection, testing and commisioning of any item mentioned in 1.01 above.
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Description of Work / Item(s)
Supply of outdoor type oil immersed Power transformer Design, engineering, manufacturing, assembly, painting, inspection and testing , packing, preparation for shipments of transformers complete with all accessories, forwarding & supply at site, supply of mandatory & commissioning spares, tools & tackles, mechanical and performance guarantee of the transformers as per the requirements specified in the MR specifications (S-17047-4-EMR3511) and other related documents in the tender/bid. Each transformers shall be supplied complete with online PD monitoring system, 1st filling of oil plus 10% spare oil in non returnable drums, Touch-up paint of same shade (2 Ltr. for each Transformer) all fittings and accessories as detailed in this specification. This cost should include bidder/vendor TPIA charges.
25 MVA, 33/6.9 kV, Dyn11, Z=8% with ±10% tolerance, OLTC, ONAN transformer, taps +10% to-10% in steps of 1.25%.
Supply of outdoor type oil immersed Power transformer Design, engineering, manufacturing, assembly, painting, inspection and testing , packing, preparation for shipments of transformers complete with all accessories, forwarding & supply at site, supply of mandatory & commissioning spares, tools & tackles, mechanical and performance guarantee of the transformers as per the requirements specified in the MR specifications (S-17047-4-EMR3511) and other related documents in the tender/bid. Each transformers shall be supplied complete with online PD monitoring system, cooling fans, Fan control unit, 1st filling of oil plus 10% spare oil in non returnable drums, Touch-up paint of same shade (2 Ltr. for each Transformer) all fittings and accessories as detailed in this specification. This cost should include bidder/vendor TPIA charges.
20/22 MVA, 33/6.9 kV, Dyn11, Z=8% with ±10% tolerance, OLTC, ONAN/ONAF transformer, taps +10% to-10% in steps of 1.25%.
Charges for site supervision of erection, testing and commisioning of any item mentioned in 1.01 above.
Overtime rate/ hour beyond normal 8 hours work on normal working days.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Description of Work / Item(s)
Spares
Description of Work / Item(s)
Spares
Description of Work / Item(s)
Cost Component
Direct Material Cost
Direct Labour Cost
Factory Overhead
HAMMOND POWER SOLUTIONS PVT LTD
VOLTAMP TRANSFORMERS LIMITED
VOLTAMP TRANSFORMERS LIMITED
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Description of Work / Item(s)
20/22 MVA, 33/6.9 kV, Dyn11, Z=8% with ±10% tolerance, OLTC, ONAN/ONAF transformer, taps +10% to-10% in steps of 1.25%.
Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Direct Material Cost
Direct Labour Cost
Factory Overhead
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .