Tender Value
₹43.7 Cr
EMD Value
₹1.1 Cr
Closing Date
15 Jul 2026, 4:00 pm
PCE RDD, Gangtok
RDD, HQ, Gangtok
T19-gerethang spwd road to middle gerethang and 7 other roads as per NIT Annexure P
2026_RDDGS_148335_1
SK04B1P140
Open Tender
Civil Works - Roads
730 days
West Sikkim
Please refer Tender documents.
4 documents required · 4 mandatory
₹5 L
FC SRRDA, RDD HQ Gangtok
₹1.1 Cr
RDD, HQ, Gangtok
15 Jun 2026
15 Jun 2026
17 Jul 2026
15 Jun 2026
15 Jul 2026
19 Jun 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. T19-gerethang spwd road to middle gerethang | |||||
| 1.01 | Pavement Works | - | - | - | - |
| 1.02 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 2.46 | hectare | 41,168.66 | ₹1,01,274.9 |
| 1.03 | Filling Quantity | 3,816.14 | Cum | 86.26 | ₹3,29,180.24 |
| 1.04 | Earthwork in Hill Road | - | - | - | - |
| 1.05 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | 30,698.7 | Cum | 140.73 | ₹43,20,228.05 |
| 1.06 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. | 7,674.68 | Cum | 233.68 | ₹17,93,419.22 |
| 1.07 | Embankment/Sub-Grade | - | - | - | - |
| 1.08 | Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 3,854.63 | Cum | 71.35 | ₹2,75,027.49 |
| 1.09 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 0.49 MB
SBDPMGSYIVbatchIroadsworks.pdf
Tender Documents • 6.36 MB
BOQ_232279.xls
BOQ • 2.45 MB
Download all tender documents and submit your bid