Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-As per check list the bidder has not been uploaded GSTR-1, as such the contract committee rejected the bidder |
Tender Value
₹25.1 L
EMD Value
₹50,200
Closing Date
11 Mar 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
irrigation and flood control division srinagar
Construction of parapet wall and re-construction of retaining wall at Naikpora on left side of Padshahibagh Nallah on River Jhelum Part A and B. (Fresh of e-NIT 38 of 2021-22)
2022_IFC_163115_1
nit no 39 of 2021-22 fresh of nit 38 of 2021-22
Open Tender
Civil Works
Item Rate
30 days
srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
Executive Engineer
₹50,200
Yes
12 Mar 2022
5 Mar 2022
12 Mar 2022
5 Mar 2022
11 Mar 2022
5 Mar 2022
90 days
Amount
Earthy work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer in charge. All kind of soil
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 meters and lift up to 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material. All kinds of soil a).Such two lift
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) In cement mortar
Demolishing cement concerete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer incharge. 1:3:6 or richer mix
Dumping stone excl. cost of stones in horizontal on level.
Supply of stone soling
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 ( 1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand). Including cost of stones.
Excluding cost of stones
Extra for laying concrete in or under water and / or liquid mud including cost of pumping or bailing out water and removing slush etc.complete.
Steel reinforcement of R.C.C work including straightening ,cuting,bending, placing in position and binding all complete upto plinth level .Themo-mechnically treated bars of grade Fe-500D or more.
Centering and shuttering including strutting ,propping etc and removal of form work for :- Foundations, footings bases of columns for mass conc.
Dry random rubble masonry with hard stone in foundation and plinth with bond stone.
Providing and laying in position cement conc. of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level1:2:4 (1 cement 2 coarse sand :4 graded stone agg: 20 mm nominal size) .
Extra for stone work, random rubble masonry/coarse rubble masonry/ashlar masonary above floor V level for every four floors or part thereof.
Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Flush/Ruled Pointing
Supply of stones (quarry)
Dumping stone excl. cost of stones in horizontal on level.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Carriage of Stone/stones soiling average 07 km from source to road site of work by mechnical transport including loading unloading and stacking.
Carriage of 40 mm stone aggregrate average 07 km from source to road site of work by mechnical transport including loading unloading and stacking.
Carriage of 20 mm stone aggregrate average 07 km from source to road site of work by mechnical transport including loading unloading and stacking.
Carriage of Sand average 08 km from source to road site of work by mechnical transport including loading unloading and stacking.
Carriage of Cemet/steel from divisional store average 07 km from source to road site of work by mechnical transport including loading unloading and stacking.
Surplus excavated earth available to be disposed off by the agency of its own against consideration cost payable towards the deptt. ( minimum reserved rate @ 150 / cum excluding royality charges be paid to Geogoly mining Kashmir )
M/s PKB Consultants
stage.html
html • 0.02 MB
finance_375522.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .