| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.2 LAccepted-AOC VILLAGE PO KANOH TEHSIL BARSAR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹90.2 L Quoted ₹94.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹99.6 L+₹4.9 L (5.18%)Accepted-AOC VILLAGE BIDDI P O DARWAR TEHSIL DHARMPUR DISTT MANDI H P | ₹99.6 L+₹4.9 L (5.18%) | L2 | Accepted-AOC L2 |
| 3 | L3₹98.7 L+₹4.1 L (4.29%)Accepted-AOC NOT AVAILABLE | NA | NA | 121004 | ₹98.7 L+₹4.1 L (4.29%) | L3 | Accepted-AOC L3 |
| Sl No | Description | Qty | Unit | MNBN Enterprises L2 | Kuldeep kumar sharma L3 | Anurag Deep L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil within all leads and lifts the entire Satisfaction as direct by the Engineer-in- Charge . | 1,329.58 | Cum | 500 ₹6,64,790 Lowest | 500 ₹6,64,790 Lowest | 550 ₹7,31,269 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) complete in all respect within all leads and lifts has direct by the Engineer-in- Charge . | 26 | Cum | 7,800 ₹2,02,800 | 7,500 ₹1,95,000 | 7,000 ₹1,82,000 Lowest |
| 3.00 | Providing and laying cement concrete 1:1:2 (1 cement : 1 Sand : 2 graded stone aggregate20mm nominal size) and curing complete excluding cost of form work in Walls including attached buttersses,pilasters and their caps and bases and string courses etc. up to floor two level within all leads and liftscomplete to the entire satisfaction has direct by the Engineer in Charge. | 260.65 | Cum | 10,200 ₹26,58,630 | 10,200 ₹26,58,630 | 9,800 ₹25,54,370 Lowest |
| 4.00 | Providing tor Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level and above plinth level within all leads and lifts Complete in all respect has direct by the Engineer-in-Charge | 286.72 | Qtl | 9,600 ₹27,52,512 | 9,500 ₹27,23,840 | 9,000 ₹25,80,480 Lowest |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including tering,shuttering,strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plainwork in all leads and lifts complete in all respect as directed by the Engineer in Charge. | ||||||
| 6.00 | Vertical surfaces such as walls(any thickness) partitions and the like including attached ,buttresses,plinth and string courses and the like within all leads and lifts complete in all respect as directed by the Engineer in Charge. | 756.61 | Sqm | 450 ₹3,40,474.5 | 400 ₹3,02,644 Lowest | 500 ₹3,78,305 |
| 7.00 | Stones/boulders filling behind the r/walls, also under floor & upstream of i/gallary/under floor etc.in all lifts & leads complete in all respect as directed by the Engineer in Charge. | 563.07 | Cum | 2,500 ₹14,07,675 | 2,600 ₹14,63,982 | 2,300 ₹12,95,061 Lowest |
| 8.00 | Providing & laying stone filling in wire crates made of G.I wire filled with boulders with square cut faces against the wire(wire crates to be measured and paid for separately) including carriage of materials within all leads & lifts complete in all respect as directed by the Engineer in Charge. | 406.25 | Cum | 2,500 ₹10,15,625 | 2,800 ₹11,37,500 | 2,300 ₹9,34,375 Lowest |
| 9.00 | Wire crates made of G.I wire filled with boulders with square cut faces against the wire(boulders filling to be measured & paid for separately)with G.I wire 5.0mm thick corresponding to(SWG-8)of 15x15cm mesh in arpan and slowping picking including carriage of materials within all leads and lifts. complete in all respect as direct by the Engineer in Charge | 1,950 | Sqm | 425 ₹8,28,750 | 415 ₹8,09,250 Lowest | 415 ₹8,09,250 Lowest |
Tender Value
₹92.3 L
EMD Value
₹1.6 L
Closing Date
23 Apr 2026, 11:00 amClosed
EE
JSV Division Nadaun
Construction of Rain Water Harvesting Structures for Recharging of Various Water Supply Irrigation Schemes and to Protect the Soil from Scouring in Nadaun Area in Tehsil Nadaun Distt Hamirpur (HP) Under State Disaster Mitigation Fund
2026_HPIPH_134417_1
No. JS-NDN-CB-Misc.Agr/2026--27/-
Open Tender
Civil Works
Item Rate
180 days
Nadaun area
Construction of RCC. Sub Surface Dyke on Kunah Khad Near LWSS Nounghi Bhumpal and LWSS Paniyala Rangas Length 130mtrs
8 documents required · 8 mandatory
₹2,000
EE Nadaun
₹1.6 L
11 May 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
16 Apr 2026 - 23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil within all leads and lifts the entire Satisfaction as direct by the Engineer-in- Charge . | 1,329.58 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) complete in all respect within all leads and lifts has direct by the Engineer-in- Charge . | - | Cum | - | - |
| 3 | Providing and laying cement concrete 1:1:2 (1 cement : 1 Sand : 2 graded stone aggregate20mm nominal size) and curing complete excluding cost of form work in Walls including attached buttersses,pilasters and their caps and bases and string courses etc. up to floor two level within all leads and liftscomplete to the entire satisfaction has direct by the Engineer in Charge. | 260.65 | Cum | - | - |
| 4 | Providing tor Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level and above plinth level within all leads and lifts Complete in all respect has direct by the Engineer-in-Charge | 286.72 | Qtl | - | - |
| 5 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including tering,shuttering,strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plainwork in all leads and lifts complete in all respect as directed by the Engineer in Charge. | - | - | - | - |
| 6 | Vertical surfaces such as walls(any thickness) partitions and the like including attached ,buttresses,plinth and string courses and the like within all leads and lifts complete in all respect as directed by the Engineer in Charge. | 756.61 | Sqm | - | - |
| 7 | Stones/boulders filling behind the r/walls, also under floor & upstream of i/gallary/under floor etc.in all lifts & leads complete in all respect as directed by the Engineer in Charge. | 563.07 | Cum | - | - |
| 8 | Providing & laying stone filling in wire crates made of G.I wire filled with boulders with square cut faces against the wire(wire crates to be measured and paid for separately) including carriage of materials within all leads & lifts complete in all respect as directed by the Engineer in Charge. | 406.25 | Cum | - | - |
| 9 | Wire crates made of G.I wire filled with boulders with square cut faces against the wire(boulders filling to be measured & paid for separately)with G.I wire 5.0mm thick corresponding to(SWG-8)of 15x15cm mesh in arpan and slowping picking including carriage of materials within all leads and lifts. complete in all respect as direct by the Engineer in Charge | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
form6.pdf
Tender Documents • 0.19 MB
form08.pdf
Tender Documents • 1.18 MB
terms.pdf
Tender Documents • 0.23 MB
BOQ_198806.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .