Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LQualified 14 126 SECTOR 08 NEAR GAYTRI MANDIR OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | ₹13.3 L | L1 | Qualified |
| 2 | L2₹13.7 L+₹36,710.98 (2.75%)Qualified SECTOR 8 NEAR GEETA MANDIR OBRA OBRA SONBHADRA UTTAR PRADESH 231219 | SONBHADRA | UTTAR PRADESH | 231219 | ₹13.7 L+₹36,710.98 (2.75%) | L2 | Qualified |
| 3 | L3₹14.3 L+₹95,002.35 (7.12%)Qualified 0 VILL UPRAUDA SIRSA MEJA ALLAHABAD UTTAR PRADESH 212305 | PRAYAGRAJ | UTTAR PRADESH | 212305 | ₹14.3 L+₹95,002.35 (7.12%) | L3 | Qualified |
Tender Value
₹10.4 L
EMD Value
₹20,000
Closing Date
19 Aug 2026, 6:00 pmClosed
Published by the portal on this tender, for queries and grievance redressal.
cutting wild vegetation and scrapyard construction
9696823
GEM/2026/B/7865965
Two Packet Bid
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm d
Sonbhadra, Uttar Pradesh
Total value wise evaluation
BOQ
3 documents required · 3 mandatory
Dy. Chief account officer BTPS, Obra, Obra thermal power station, Obra, sonebhadra., (Dy Cao Cfa And Bo Btps Obra)
₹20,000
19 Aug 2026
8 Aug 2026
19 Aug 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kind of soil. | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kind of soil. | 2,100 | sqm | ee_sd_btps_obra | 60 |
| 2 | Earth work in excavation by mechanical means , manual means over areas , exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan | Earth work in excavation by mechanical means ( Hydraulic excavator)/ manual means over areas ( exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer incharge 2.6.1 All kinds of soil. | 30 | cum | ee_sd_btps_obra | 60 |
| 3 | 1,4,8 , 1 cement ,4 course sand ,zone-III derived from natural sources , 8 graded stone aggregate 40 mm nominal size derived from natural sources | 1,4,8 , 1 cement ,4 course sand ,zone-III derived from natural sources , 8 graded stone aggregate 40 mm nominal size derived from natural sources | 5 | cum | ee_sd_btps_obra | 60 |
| 4 | 1,2,4 , 1 cement , 2 course sand ,zone-III derived from natural sources ,4 graded stone aggregate 20 mm nominal size derived from natural sources | 1,2,4 , 1 cement , 2 course sand ,zone-III derived from natural sources ,4 graded stone aggregate 20 mm nominal size derived from natural sources | 26 | cum | ee_sd_btps_obra | 60 |
| 5 | Centering and shuttering of including strutting, propping etc. and removal of from for all heights, columns, pillars etc. | Centering and shuttering of including strutting, propping etc. and removal of from for all heights, columns, pillars, piers, abutments, Posts and struts | 175 | sqm | ee_sd_btps_obra | 60 |
| 6 | Providing and fixing G.I chain link fabric fencing of required width in mesh size 50x50 mm . Made of GI wire dia 4 mm | Providing and fixing G.I chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer incharge. Made of GI wire dia 4 mm | 322 | sqm | ee_sd_btps_obra | 60 |
| 7 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of steel primer all complete. | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of steel primer all complete. | 1,800 | kg | ee_sd_btps_obra | 60 |
| 8 | Structural steel work in single section, and applying steel primer , scrap steel shall be provided by department free of cost from scrapyard | Structural steel work in single section, and applying steel primer , scrap steel shall be provided by department free of cost from scrapyard | 8,900 | kg | ee_sd_btps_obra | 60 |
| 9 | Painting with synthetic enamel paint of approved brand ,Two or more coats on new work | Painting with synthetic enamel paint of approved brand ,Two or more coats on new work | 250 | sqm | ee_sd_btps_obra | 60 |
| 10 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level | 650 | Sqm | ee_sd_btps_obra | 60 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9696823.pdf
GEM_BID • 0.14 MB
construction_2026-08-01-19-30-56_4b5251f2d397cf84adabbd9c6477a747.pdf
BOQ • 0.42 MB
boq_item_sample_file_2026-07-28-13-35-36_87378d5a30_2026-08-01-19-30-56_670d83bdf68e329c66a98e5ee2cc4991.csv
BOQ • 0.00 MB
tsd_9bd4be48-d062-4516-832c1785593583724_ee_sd_btps_obra.pdf
GEM_OTHER • 0.99 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .