Loading…
Loading…
Tender Value
₹15.8 L
EMD Value
₹31,600
Closing Date
15 Jul 2026, 4:00 pm
Ex. Engineer SND Div IIND
Darish Kadal
Construction of drain from H/O Fayaz ah Najar to H/O Tariq Ah Dawarkee at Madina colony Bemina
2026_HAUDD_314164_5
E-NIT NO 07 SNDII OF 2026-27
Open Tender
Civil Works
30 days
Bemina
Please refer Tender documents.
6 documents required · 6 mandatory
₹750
Ex Engineer SND Division IIND
₹31,600
1 Jul 2026
1 Jul 2026
16 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling manually/mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-im-charge: Bituminous road. | 180 | Sqm | 297.95 | ₹53,631 |
| 2 | Earth work in excavation by manuall means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out excavated earth and siposal of suplus excavated earth as directed. | 64.91 | Cum | 479.3 | ₹31,111.36 |
| 2.01 | Earth work in excavation by mechanically means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out excavated earth and siposal of suplus excavated earth as directed. | 151.45 | Cum | 256.85 | ₹38,899.93 |
| 3 | Providing & Laying stone soling duly packed on horizontal floor on horizantal floor including hand ramming watering and levelling to the surface. | 57.24 | Cum | 937.4 | ₹53,656.78 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement 4 coarse sand 8 graded stone aggregate 40mm nommal size (Crushed) | 19.08 | Cum | 5,202.9 | ₹99,271.33 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement 3 coarse sand 6 graded stone aggregate 20mm nommal size (Crushed) | 73.08 | Cum | 5,733.6 | ₹4,19,011.49 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement 2 coarse sand 4 graded stone aggregate 20mm nommal size (Crushed) | 2.7 | Cum | 6,591.25 | ₹17,796.38 |
| 7 | Providing and laying in position specified grade of reinforcedcement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement 2 coarse sand 4 graded stone aggregate 20mm nommal size (Crushed) | 34.86 | Cum | 7,104.35 | ₹2,47,657.64 |
| 8 | Steel reinforcement for E.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo-Mechanically Treated bars of grabe Fe-500D or more. | 2,300 | Kg | 123.2 | ₹2,83,360 |
| 9 | Centering and shuttering including strutting, propping etc. and removal work of form work Retaining Walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc A. Manholes Walls Internal | 163.29 | Sqm | 286.35 | ₹46,758.09 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1017206.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid