| 1 | L1₹18.4 CrAccepted-AOC SATNA | SATNA | MADHYA PRADESH | 485001 | ₹18.4 Cr | L1 | Accepted-AOC as per ts |
| 2 | L2₹18.7 CrAccepted-AOC | ₹18.7 Cr | L2 | Accepted-AOC as per ts |
| 3 | l3₹18.8 CrAccepted-AOC | ₹18.8 Cr | l3 | Accepted-AOC as per ts |
| 4 | l4₹18.9 CrAccepted-AOC | ₹18.9 Cr | l4 | Accepted-AOC as per ts |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MISHRA ELECTRICAL AND TRADERS L1 | NITESH KUMAR CHATURVEDI No Rank | ABHINAV DWIVEDI L3 | RATAN SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1 KM OF 33 KV LINE ON 280 KG, 9 MTR LONG PCC POLES WITH MAXIMUM SPAN OF 70 METER USING AAAC RACCOON CONDUCTOR FOR RURAL AREA without CUT POINT | 1 | Nos | 4,09,878 ₹4.1 L | 4,07,009 - | 4,09,878 ₹4.1 L | 4,07,009 ₹4.1 L |
| 2.00 | 1 KM OF 33 KV LINE ON 13 Mtr H-BEAM WITH MAXIMUM SPAN OF 70 METER USING AAAC DOG CONDUCTOR FOR RURAL AREA | 1 | Nos | 9,16,523 ₹9.2 L | 9,10,107 - | 9,16,523 ₹9.2 L | 9,10,107 ₹9.1 L |
| 3.00 | 1 KM OF 33 KV LINE ON 13 Mtr H-BEAM WITH MAXIMUM SPAN OF 40 METER USING AAAC DOG CONDUCTOR FOR URBAN AREA | 1 | Nos | 14,26,320 ₹14.3 L | 14,16,336 - | 14,26,320 ₹14.3 L | 14,16,336 ₹14.2 L |
| 4.00 | 33 KV line on H-Beams 13 Mtr. Long supports using AAAC Dog conductor double circuit single stringing (DCSS) maximum SPAN 40 M FOR URBAN AREA | 1 | Nos | 14,91,237 ₹14.9 L | 14,80,798 - | 14,91,237 ₹14.9 L | 14,80,798 ₹14.8 L |
| 5.00 | 1 KM OF 33 KV LINE ON H-Beams 13 Mtr. Long WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR- DOUBLE CIRCUIT DOUBLE STRINGING (DCDS) For Urban Area | 1 | Nos | 18,84,182 ₹18.8 L | 18,70,993 - | 18,84,182 ₹18.8 L | 18,70,993 ₹18.7 L |
| 6.00 | Conversion of DCSS to DCDS -For Urban Area 1 KM OF 33 KV LINE ON 13 Mtr. H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR | 1 | Nos | 5,16,058 ₹5.2 L | 5,12,446 - | 5,16,058 ₹5.2 L | 5,12,446 ₹5.1 L |
| 7.00 | 1 KM OF 33 KV LINE ON 15 Mtr. Long H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR DOUBLE CIRCUIT SINGLE STRINGING (DCSS) For Urban Area | 1 | Nos | 15,73,468 ₹15.7 L | 11,95,836 - | 15,73,468 ₹15.7 L | 15,62,454 ₹15.6 L |
| 8.00 | 1 KM OF 33 KV LINE ON 15 Mtr. Long H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR DOUBLE CIRCUIT DOUBLE STRINGING (DCDS) For Urban | 1 | Nos | 19,66,122 ₹19.7 L | 19,52,359 - | 19,66,122 ₹19.7 L | 19,52,359 ₹19.5 L |
| 9.00 | CONVERSION OF DCSS TO DCDS OF 1 KM OF 33 KV LINE ON 15 MTR H-BEAM WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR For Urban Area | 1 | Nos | 5,25,707 ₹5.3 L | 5,22,027 - | 5,25,707 ₹5.3 L | 5,22,027 ₹5.2 L |
| 10.00 | Augmentation of 1 Km of 33 kV Line with AAAC Dog conductor and Mid Span 280 kg. 9.1 m PCC Pole | 1 | Nos | 3,50,279 ₹3.5 L | 3,47,827 - | 3,50,279 ₹3.5 L | 3,47,827 ₹3.5 L |
Tender Value
₹3 Cr
EMD Value
₹1 L
Closing Date
19 Jan 2025, 5:30 pmClosed
SE ONM PANNA
OLD RTO BUILDING SATNA ROAD PANNA
Erection Testing and Commissioning of new 33KV 11KV LT Lines distribution substations and other miscellaneous work on turnkey basis in Panna Distric
2024_PKVVC_391599_1
2191
Open Tender
Electrical Works
365 days
OLD RTO BUILDING SATNA ROAD PANNA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹1 L
Yes
11 Sept 2025
30 Dec 2024
20 Jan 2025
30 Dec 2024
19 Jan 2025
30 Dec 2024
Amount
1 KM OF 33 KV LINE ON 280 KG, 9 MTR LONG PCC POLES WITH MAXIMUM SPAN OF 70 METER USING AAAC RACCOON CONDUCTOR FOR RURAL AREA without CUT POINT
1 KM OF 33 KV LINE ON 13 Mtr H-BEAM WITH MAXIMUM SPAN OF 70 METER USING AAAC DOG CONDUCTOR FOR RURAL AREA
1 KM OF 33 KV LINE ON 13 Mtr H-BEAM WITH MAXIMUM SPAN OF 40 METER USING AAAC DOG CONDUCTOR FOR URBAN AREA
33 KV line on H-Beams 13 Mtr. Long supports using AAAC Dog conductor double circuit single stringing (DCSS) maximum SPAN 40 M FOR URBAN AREA
1 KM OF 33 KV LINE ON H-Beams 13 Mtr. Long WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR- DOUBLE CIRCUIT DOUBLE STRINGING (DCDS) For Urban Area
Conversion of DCSS to DCDS -For Urban Area 1 KM OF 33 KV LINE ON 13 Mtr. H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR
1 KM OF 33 KV LINE ON 15 Mtr. Long H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR DOUBLE CIRCUIT SINGLE STRINGING (DCSS) For Urban Area
1 KM OF 33 KV LINE ON 15 Mtr. Long H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR DOUBLE CIRCUIT DOUBLE STRINGING (DCDS) For Urban
CONVERSION OF DCSS TO DCDS OF 1 KM OF 33 KV LINE ON 15 MTR H-BEAM WITH MAXIMUM SPAN OF 40 METERS USING AAAC DOG CONDUCTOR For Urban Area
Augmentation of 1 Km of 33 kV Line with AAAC Dog conductor and Mid Span 280 kg. 9.1 m PCC Pole
Augmentation of 1 Km of 33 kV Line with AAAC Dog conductor and Mid Span 13 m H-Beam
1 SPAN OF 70 MTR 33 KV LINE ON 13 M H-BEAMS FOR ROAD CROSSING (OVERHEAD) WITH AAAC DOG EXCLUDING NATIONAL HIGHWAY (NH) OR STATE HIGHWAY (SH)
1 SPAN OF 70 MTR 33 KV LINE ON 15 M H-BEAMS FOR ROAD CROSSING (OVERHEAD) WITH AAAC DOG EXCLUDING NATIONAL HIGHWAY (NH) OR STATE HIGHWAY (SH)
33 KV line on 280 Kg., 9.1 Mtrs. Long PCC poles with ACSR Dog conductor with maximum span of 70 mtr-FOR RURAL AREA
33 KV line on H-Beams 13 Mtr. Long supports with ACSR Dog conductor with maximum span of 70 mtr-FOR RURAL AREA
33 KV line on H-Beams 13 Mtr. Long supports using ACSR Dog conductor double circuit single stringing (DCSS) maximum SPAN 40 M FOR URBAN AREA
33 KV line on H-Beams 13 Mtr. Long supports using ACSR Dog conductor double circuit double stringing (DCDS) maximum SPAN 40 M FOR URBAN AREA
Conversion of DCSS to DCDS -For Urban Area 1 KM OF 33 KV LINE ON 13 Mtr. H-BEAMS WITH MAXIMUM SPAN OF 40 METERS USING ACSR DOG CONDUCTOR
33 KV line on H-Beams 15 Mtr. Long supports using Dog conductor double circuit single stringing (DCSS) maximum span 40 m FOR URBAN AREA
33 KV line on H-Beams 15 Mtr. Long supports using ACSR Dog conductor double circuit double stringing (DCDS) maximum span 40 m FOR URBAN AREA
CONVERSION OF DCSS TO DCDS OF 1 KM OF 33 KV LINE ON 15 MTR H-BEAM WITH MAXIMUM SPAN OF 40 METERS USING ACSR DOG CONDUCTOR For Urban Area
1 KM OF 33 KV LINE ON H-BEAM WITH maximum SPAN OF 30 METER USING COVERED CONDUCTOR 99 SQ.MM. XLPE FOR URBAN AREA
33 KV line on H-Beams 13 Mtr. Long supports with 3 X 95 Sq. mm AB Cable with MAXIMUM span of 30 mtr
Augmentation of 1 Km of 33 kV Line with ACSR Dog conductor and Mid Span 280 kg. 9.1 m PCC Pole
Augmentation of 1 Km of 33 kV Line with ACSR Dog conductor and Mid Span 13 m H-Beam
1 SPAN OF 70 MTR 33 KV LINE ON 13 M H-BEAMS FOR ROAD CROSSING (OVERHEAD) WITH ACSR DOG EXCLUDING NATIONAL HIGHWAY (NH) OR STATE HIGHWAY (SH)
1 SPAN OF 70 MTR 33 KV LINE ON 15 M H-BEAMS FOR ROAD CROSSING (OVERHEAD) WITH ACSR DOG EXCLUDING NATIONAL HIGHWAY (NH) OR STATE HIGHWAY (SH)
33 KV Single Pole Cut Point in 15 M H Beam for Straight Line & angle upto 45º for Urban Area
33 KV Single Pole Cut Point in 13 M H Beam for Straight Line & angle upto 45º for Urban Area
Schedule for 33 KV Single Pole Cut Point in 280 Kg. long PCC pole for Straight Line & angle upto 45º for Urban Area
Height Raising/Mid Span Pole/ Replacement of Deteriorated/ damaged poles in 33 KV lines- 280 kg 9.1 mtr. long PCC Pole
Height Raising/Mid Span Pole/ Replacement of Deteriorated/ damaged poles in 33 KV lines- H-Beam 15 mtr. long
Height Raising/Mid Span Pole/ Replacement of Deteriorated/ damaged poles in 33 KV lines- H-Beam 13 mtr. long
33 KV D.P.structure on 280 Kg.,9.1 Mtrs.long PCC poles
33 KV D.P.structure on H-Beams 13Mtr. Long for double circuit single stringing
33 KV D.P.structure on H-Beams 13Mtr. Long for double stringing double circuit
33 KV D.P.STRUCTURE ON 37.1KG./MTR. 15 MTR LONG H-BEAM FOR DOUBLE CIRCUIT DOUBLE STRINGING (DCDS)
33 KV T.P.structure on 280 Kg.,9.1 Mtrs.long PCC poles
33 KV T.P.structure on H-Beams 13Mtr. Long for double circuit double stringing(DCDS) & double circuit single stringing(DCSS)
33 KV T.P.STRUCTURE ON 37.1KG./MTR. 15 MTR LONG H-BEAM FOR DOUBLE CIRCUIT DOUBLE STRINGING(DCDS) AND DOUBLE CIRCUIT SINGLE STRINGING(DCSS)
33 KV FOUR POLE structure on 280 Kg.,9.1 Mtrs.long PCC poles
33 KV FOUR POLE structure on H-Beams 13Mtr. Long
33 KV FOUR POLE STRUCTURE ON 37.1KG./MTR. 15 MTR LONG H-BEAM FOR DCSS & DCDS
33 KV SIX POLE structure on H-Beams 13Mtr. [To be Supplemented for Junction of 33 KV Line]
33 KV SIX POLE .STRUCTURE ON H-BEAM 15 M FOR DCSS & DCDS
33 kV line for under ground railway crossing by one+one cable 3x300 Sq.mm. span 90 m
33 kV line for under ground National Highway by one+one cable 3x300 Sq.mm. span 90 m
14Mtr MonoPole Suspension Type Monopole (0-2 Deg) with average Span of 100M
14Mtr MonoPole Suspension Type Monopole (2-30 Deg) with average Span of 100M
14Mtr MonoPole Suspension Type Monopole (2-30 Deg) with average Span of 100M Sectionoliser location With Isolator installation
14Mtr MonoPole Suspension Type Monopole (30-60 Deg) with average Span of 100M
14Mtr MonoPole Suspension Type Monopole (30-60 Deg) with average Span of 100M-Special terminal location for HT AB cable junction
14Mtr MonoPole Suspension Type Monopole (60-90 Deg) with average Span of 100M
17 Mtr MonoPole Suspension Type Monopole (0-2 Deg) with average Span of 100M
17 Mtr MonoPole Suspension Type Monopole (2-30 Deg) with average Span of 100M
17 Mtr MonoPole Suspension Type Monopole (30-60 Deg) with average Span of 100M
17 Mtr MonoPole Suspension Type Monopole (30-60 Deg) with average Span of 100M Special terminal location for HT AB cable junction
17 Mtr MonoPole Suspension Type Monopole (60-90 Deg) with average Span of 100M
17 Mtr MonoPole Suspension Type Monopole (60-90 Deg) with average Span of 100M WITH Tapping arrangements
Schedule of Items per 20Mtr MonoPole Tension Type Monopole ( 0-30 Deg) with average Span of 100M Special structure for Locations - Road Crossing , ROW eith existing lines
INSTALLATION OF 1x5MVA NEW 33/11KV SUB-STATION EXPANDABLE TO 2X5 MVA WITH CONTROL ROOM AND 3 NO. 11 KV BAY FOR FEEDER (RURAL AREA)
INSTALLATION OF ADDITIONAL PTR 1X3.15 MVA AT 33/11KV RURAL SUB-STATION WITH 1 NO. 11KV BAY
INSTALLATION OF ADDITIONAL PTR 1X5 MVA AT 33/11KV RURAL SUB-STATION WITH 2 NO. 11KV BAY
INSTALLATION OF ADDITIONAL PTR 1X3.15 MVA(OLD) AT 33/11KV RURAL SUB-STATION WITH 1 NO. 11KV BAY
INSTALLATION OF ADDITIONAL PTR 1X5 MVA AT 33/11KV RURAL SUB-STATION WITH 2 NO. 11KV BAY WITH CAPACITOR BANK
33KV OUTDOOR YARD EXTENSION FOR ADDITIONAL BAY WITH VCB
11KV OUTDOOR YARD EXTENSION FOR ADDITIONAL BAY WITH VCB
33KV VCB INSTALLATION (WITHOUT BAY)
11KV VCB INSTALLATION (WITHOUT BAY)
INSTALLATION OF NEW 11 KV 1500 KVAR AUTO SWITCH CAPACITOR BANK WITH XLPE CABLE
INSTALLATION OF NEW 11 KV 1500 KVAR AUTO SWITCH CAPACITOR BANK
AUGMENTATION OF POWER TRANSFORMER 3.15MVA TO 5 MVA WITH ONE ADDITIONAL BAY FOR 11KV FEEDER
AUGMENTATION OF POWER TRANSFORMER 5MVA TO 8 MVA WITH TWO ADDITIONAL BAY FOR 11KV FEEDER
AUGMENTATION OF POWER TRANSFORMER 3.15 MVA TO 8 MVA WITH TWO ADDITIONAL BAY FOR 11KV FEEDER
AUGMENTATION OF POWER TRANSFORMER 8 MVA TO 10 MVA WITH ONE ADDITIONAL BAY FOR 11KV FEEDER
AUGMENTATION OF POWER TRANSFORMER 5 MVA TO 10 MVA WITH TWO ADDITIONAL BAY FOR 11KV FEEDER
11 KV LINE ON 11 M H-Beam Using AAAC Raccoon Conductor Max Span 50 Mtrs IN RURAL AREA
11 KV LINE ON 140 KG, 8 M PCC Pole Using AAAC Raccoon Conductor Max Span 70 Mtrs IN RURAL AREA
1 KM OF 11 KV LINE ON 11 m H-Beam Using AAAC Rabbit Conductor maximum Span 70 Mtrs IN RURAL AREA
1 KM OF 11 KV LINE ON 8 Mtr PCC Pole Using AAAC Rabbit Conductor maximum Span 70 Mtrs IN RURAL AREA
1 KM OF 11 KV LINE ON 200 KG 9 Mtr PCC Pole Using AAAC Raccoon Conductor maximum Span 70 Mtrs IN RURAL AREA
11 KV LINE ON 13 M H-BEAM with ACSR Dog Conductor maximum Span 40 Mtrs for Urban Area(DCSS)
11 KV LINE ON 13 M H-BEAM with ACSR Dog Conductor maximum Span 40 Mtrs for Urban Area(DCDS).
Conversion of DCSS to DCDS in 11 KV 13 M H Beam with ACSR Dog conductor.
11 KV LINE ON 15 Mtr H-BEAM with ACSR Dog Conductor maximum Span 40 Mtrs for Urban Area (DCSS)
1 KM OF 11 KV LINE ON H-BEAM WITH MAXIMUM SPAN OF 30 METER USING COVERED CONDUCTOR 70 SQ.MM. XLPE FOR URBAN AREA
11 KV Line on 11 Mtr. Long H-Beam with 35 sq.mm. AB Cable maximum span 30 Mtrs.
11 KV Line on 13 Mtr. Long H-Beam with 70 sq.mm. AB Cable maximum span 30 Mtrs.
11 KV Line on 13 Mtr. H-Beam with 3x95 sq.mm. AB Cable maximum span 30 Mtrs.
11 KV Line on 13 Mtr. H-Beam with 3x185 sq.mm. AB Cable (One + One) maximum span 30 Mtrs.
1 KM OF COMPOSITE LINE ON 11 M H-Beam [Using AAAC Raccoon Conductor IN 11 KV & 3x50 + 1x16 + 1x35 Sq.mm] Max Span 30 Mtrs IN RURAL AREA
1 KM OF COMPOSIT LINE ON H-Beam 13 MTR. [Using AAAC Raccoon Conductor & + 3 X 120 + 1 X 16 + 1 X 35 sq.mm. (insulated nuetral massenger)] Max Span 30 Mtrs Urban Area
11 KV Single Pole Cut Point in 13 M H-Beam for Straight Line & angle upto 45º for Urban Area
Schedule for 11 KV Single Pole Cut Point in 8 M PCC pole for Straight Line & angle upto 45º for Urban Area
Schedule for 11 KV Single Pole Cut Point in 11 M H-Beam for Straight Line & angle upto 45º for Urban Area
11 KV Line Crossing Ag & Non Ag with Raccon conductor WITH 11 MTR. H-BEAM
11 KV Line Crossing Ag & Non Ag with Cover conductor WITH 11 MTR. H-BEAM
11 KV Line Crossing Ag & Non Ag with HOT INSULATION SLEEVES WITH 11 MTR. H-BEAM
11 KV Line Crossing Ag & Non Ag with COLD WRAPPED INSULATION SLEEVES [NARMADAPURAM PATTERN] WITH 11 MTR. H-BEAM
11 KV Line Crossing Ag & Non Ag with COLD WRAPPED INSULATION SLEEVES [NARMADAPURAM PATTERN] WITH 13 MTR. H-BEAM
11 KV Line Crossing Ag & Non Ag with COLD WRAPPED INSULATION SLEEVES [NARMADAPURAM PATTERN] WITH -200 KG 9 M LONG PCC POLE
11 KV Line Crossing Ag & Non Ag with COLD WRAPPED INSULATION SLEEVES [NARMADAPURAM PATTERN] In existing line
11 KV D.P.structures on 140 Kg.,8.0 M PCC poles for straight line
11 KV D.P.structures on 200 Kg.,9.0 M PCC poles for straight line
11 KV D.P.Structure on H-Beams 11 M (Single Circuit)
11 KV D.P.Structure on H-Beams 13 M (Single Circuit)
11 KV D.P.Structure on H-Beams 13 M for DCDS
11 KV D.P.Structure on H-Beams 15 M (Single Circuit)
11 KV T.P.structures on 140 Kg.,8.0 M PCC poles
11 KV T.P.structures on 200 Kg.,9.0 M PCC poles
11 KV T.P.Structure on H-Beams 11 M
11 KV T.P.Structure on H-Beams 13 M
11 KV FOUR POLE Structure on H-Beams 11 M
11 KV FOUR POLE STRUCTURE ON 200 kg 9.1 mtr long PCC POLE
11 KV FOUR POLE STRUCTURE ON H-Beam 13 mtr long FOR (DCDS)
11 KV SIX POLE Structure on H-Beams 11 M
MID SPAN POLE/ REPLACEMENT OF DETORIATED/ DAMAGED POLES IN 11 KV LINES PCC Pole 8 M
MID SPAN POLE/ REPLACEMENT OF DETORIATED/ DAMAGED/11 KV HEIGHT RAISING POLES IN 11 KV LINES H-BEAM 11Mtr
Augmentaion of existing 11 KV line to AAAC Rabbit with 8 Mtr PCC for mid span
Augmentaion of existing 11 KV line to AAAC Raccoon with 8 Mtr PCC for Mid Span pole
Augmentaion of existing 11 KV line to AAAC Raccoon with 11 Mtr H-Beam for Mid Span pole
Augmentaion of existing 11 KV line to ACSR Dog with 13 Mtr H-Beam for Mid Span pole
11 kV Line under ground Railway crossing with Cable one+ one (3x300 sq.mm.)
11 KV LINE FOR UNDER GROUND ROAD CROSSING (National Highway/State Highway) BY ONE+ONE CABLE (Span 100 mtr)
Road Crossing for 11KV (Overhead) excluding National Highway (NH) OR State Highway (SH) 13 M H Beam
Road Crossing for 11KV (Overhead) excluding National Highway (NH) OR State Highway (SH) 15 M H Beam
(i) One KM. L.T. LINES 3 PHASE 5 WIRE ON RSJ 9.3 M USING [ 3 X 35 + 1 X 16 + 1 X 35 sq.mm. (insulated nuetral massenger)] AERIAL BUNCHED XLPE CABLE IN URBAN AREA
(ii) 3 X 50 + 1 X 16 + 1 X 35 sq.mm. insulated nuetral massenger (Span of 50 Mtr)
(iii) 3X95 + 1X16 + 1X50 Sq mm. (insulated nuetral massenger)(Span of 40 Mtr)
(iv) 3X150 + 1X35 + 1X95 Sq mm. (insulated nuetral massenger)(Span of 35 Mtr) with RSJ & H-Beam
(v) 3 X 25 + 1 X 16 + 1 X 35 sq.mm. (insulated nuetral massenger)
(vi) 3 X 50 + 1 X 16 + 1 X 35 sq.mm.(insulated nuetral massenger)
(vii)3 X35+1x16+1x35 Sq.mm. XLPE WITH MAXIMUM SPAN OF 50 METERS
(vii) 3 X 50+1x16+1x35 Sq.mm. XLPE WITH MAXIMUM SPAN OF 50 METERS WITH 200 KG PCC
(ix) LT XLPE Cable Arial Bunch 1X25 + 1X16+1X25 Sq mm. 1100 Volts bare messenger wire
One Km. CONVERSION OF L.T. LINES 3 PHASE 5 WIRE (BARE CONDUCTOR TO CABLE) USING 3 X 50 + 1 X 16 + 1 X 35 sq.mm.(insulated nuetral massenger) AERIAL BUNCHED XLPE CABLE WITH MID SPAN PCC POLE
One Km. CONVERSION OF L.T. LINES 3 PHASE 5 WIRE (BARE CONDUCTOR TO CABLE) USING 3 X 50 + 1 X 16 + 1 X 35 sq.mm.(insulated nuetral massenger) AERIAL BUNCHED XLPE CABLE WITH MID SPAN RSJ POLE
One Km. CONVERSION OF L.T. LINES 3 PHASE 5 WIRE (BARE CONDUCTOR TO CABLE) USING 3 X 95 + 1 X 16 + 1 X 50 sq.mm.(insulated nuetral massenger) AERIAL BUNCHED XLPE CABLE WITH MID SPAN RSJ POLE
One Km. CONVERSION OF L.T. LINES 3 PHASE 5 WIRE (BARE CONDUCTOR TO CABLE) USING 3 X 150 + 1 X 35 + 1 X95 sq.mm.(insulated nuetral massenger) AERIAL BUNCHED XLPE CABLE WITH MID SPAN RSJ & H-BEAM POLE
One Km. CONVERSION OF L.T. LINES TO DOUBLE CIRCUIT LT LINE (BARE CONDUCTOR TO CABLE) USING 3 X 95 + 1 X 16 + 1 X 50 sq.mm.(insulated nuetral massenger) AERIAL BUNCHED XLPE CABLE WITH MID SPAN H-BEAM POLE
AUGMENTATION OF L.T. CABLE (OF ANY SIZE) TO 3 X 50 + 1 X 16 + 1 X 35 SQ.MM AERIAL BUNCHED XLPE CABLE WITH MID SPAN PCC POLE
AUGMENTATION OF L.T. CABLE (OF ANY SIZE) TO 3 X 50 + 1 X 16 + 1 X 35 SQ.MM AERIAL BUNCHED XLPE CABLE WITH MID SPAN RSJ POLE
AUGMENTATION OF L.T. CABLE OF ANY SIZE) TO 3 X 95 + 1 X 16 + 1 X 50 SQ.MM AERIAL BUNCHED XLPE CABLE WITH MID SPAN RSJ POLE
AUGMENTATION OF L.T. CABLE (OF ANY SIZE) TO 3 X 150+ 1 X 35 + 1 X 95 SQ.MM AERIAL BUNCHED XLPE CABLE WITH MID SPAN RSJ & H-BEAM POLE
AUGMENTATION OF L.T. CABLE OF ANY SIZE) TO DOUBLE CIRCUIT USING 3 X 95 + 1 X 16 + 1 X 50 SQ.MM AERIAL BUNCHED XLPE CABLE WITH MID SPAN H-BEAM POLE
Service Line PVC Insulated 2 Core 6 Sq.mm Armoured Aluminium Conductor 1100 Volts for Smart Metering
Service Line PVC Insulated 4 Core 6 Sq.mm Armoured Aluminium Conductor 1100 Volts for Smart Metering
Service Line PVC Insulated 4 Core 10 Sq.mm Armoured Aluminium Conductor 1100 Volts for Smart Metering
Service Line PVC Insulated 4 Core 16 Sq.mm Armoured Aluminium Conductor 1100 Volts for Smart Metering
Service Line PVC Insulated 3.5 Core 35 Sq.mm Armoured Aluminium Conductor 1100 Volts for Smar
MID SPAN POLE/ REPLACEMENT OF DETORIATED/ DAMAGED POLES IN LT LINES RSJ 175 x 85 mm. 9.3 Meter
MID SPAN POLE/ REPLACEMENT OF DETORIATED/ DAMAGED POLES IN LT LINES PCC POLE 140 KG 8 MTR. LONG
25 KVA on 140 Kg., 8.0 Mtrs.long PCC poles
63 KVA on 140 Kg., 8.0 Mtrs.long PCC poles
100 KVA on 140 Kg., 8.0 Mtrs.long PCC poles
11/0.4 KV, 63 KVA OUT DOOR SUB-STATION (ON 200 Kg, 9 M PCC POLE )
11/0.4 KV, 100KVA OUT DOOR SUB-STATION (ON 200 Kg, 9 M PCC POLE )
63 KVA on 11.0 Mtrs.long H-Beam
100 KVA on 11.0 Mtrs.long H-Beam
200 KVA on 11.0 Mtrs.long H-Beam
315 KVA on 11.0 Mtrs.long H-Beam
HVDS to convnsional 11/0.4 KV, 100KVA SUB-STATION conversion (ON H-Beam )
DTR Renovation 25 KVA
DTR Renovation 63 KVA
DTR Renovation 100 KVA
DTR Renovation 200 KVA
DTR Renovation 315 KVA
SHIFTING OF 11/0.4 KV, 25KVA SUB-STATION (ON 140 kg. 8 mtr. PCC POLE )
SHIFTING OF 11/0.4 KV, 63KVA SUB-STATION (ON 140 kg. 8 mtr. PCC POLE )
SHIFTING OF 11/0.4 KV, 100KVA SUB-STATION (ON 140 kg. 8 mtr. PCC POLE )
SHIFTING OF 11/0.4 KV, 25KVA SUB-STATION (ON 200 kg. 9 mtr. PCC POLE )
SHIFTING OF 11/0.4 KV, 63KVA SUB-STATION (ON 200 kg 9 mtr.PCC POLE )
SHIFTING OF 11/0.4 KV, 100KVA SUB-STATION (ON 200 kg 9 mtr.PCC POLE )
SHIFTING OF 11/0.4 KV, 100KVA SUB-STATION (ON 11 mtr. H-Beam )
Shifting of 11/0.4 KV, 200KVA OUT DOOR SUB-STATION (ON H-Beam )
25 to 63 KVA
63 to 100 KVA
100 to 200 KVA
200 to 315 KVA
25 to 63 KVA (Old)
Installation of HVDS DTR 25 KVA on 350 Kg. 11 mtrs. Long PCC Pole (Rural Area)
RATAN SINGH CONTRACTOR (BID ID -1177578)
ABHINAV DWIVEDI (BID ID -1176795)
NITESH KUMAR CHATURVEDI (BID ID -1171415)
Bidder Name
NITESH KUMAR CHATURVEDI
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid