Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹71.2 LAccepted-AOC | 1 | Accepted-AOC Tender Date 16.08.2024 Due to sum omitted document procured from the tenderer as per the ROC No.56/2024-a1 dated 26.08.2024 | |
| 2 | 2₹71.8 L+₹60,267.95 (0.85%)Rejected-Finance 2308 SF NO 453 3B1 VEERAPANDI TIRUPUR SOUTH | 2 | Rejected-Finance Highest Rejected | |
| 3 | Rejected-Technical NRK PURAM 11 RAILWAY GATE UTHUKULI MAIN ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | - | Rejected-Technical The Contractor Produce a letter to the executive officer ie i am not participated and not willing in this tender. Due to my family and work load |
Tender Value
Refer Docs
EMD Value
₹85,000
Closing Date
16 Aug 2024, 3:00 pmClosed
EXECUTIVE OFFICER
TOWN PANCHAYAT 256C THIRUTHURAIPOONDI ROAD MUTHUPET
Improvement Of BT Road At Therkkukadu Mariyamman Koil Street, Therkkukadu Mariyamman koil Street From Mannargudy Street, Mariyamman Koil Street PWD Canal to RailwayRoad and Koiyathoppu Sethukulam Santhu E-W In Muthupet Town Panchayat.
2024_DTP_471487_1
56/2024/A1
Open Tender
Civil Works - Roads
Works
180 days
MUTHUPET TOWN PANCHAYAT
CLASS II
3 documents required · 3 mandatory
₹0
₹85,000
MUTHUPET TOWN PANCHAYAT
2 Sept 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
9 Aug 2024 - 16 Aug 2024
9 Aug 2024
Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification
Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502
Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminus Concrte to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
SIVAKUMAR (BID ID -1110054)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .