Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.6 L+₹193.55 (0.03%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.2 L+₹61,893.25 (8.18%)Rejected-AOC NEW RASULPUR BAG MOLA RAM DIST FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | L3 | Rejected-AOC L3 | |
| 4 | L4₹8.4 L+₹79,781.20 (10.5%)Rejected-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
9 Jul 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE UDAC MATHURA
EE UDAC MATHURA
LOT08
2025_UPIDC_1054054_8
06/EE/2025-26
Open Tender
Civil Works
Piece-work
90 days
EE UDAC MATHURA
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹21,000
Yes
24 Jul 2025
4 Jul 2025
9 Jul 2025
4 Jul 2025
9 Jul 2025
4 Jul 2025
Amount
Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work
Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge
Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work
Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work
Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work
Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work
Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work.
Making cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work
Dismantling of Brick / Stone work in cement masonry work including all labour material and T&P etc and disposal of dismantled material within a distance of 60 m.
Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work
Supplying and fixing of 1000 mm inner Dia NP-3 socket Hume Pipe including placing in position with cost of all material, labour, T&P etc for proper completion of work
Providing and Fixing of year Plate for proper completion of work
Providing and fixing of B.M Plate for proper completion of work
Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work
Providing & Filling 20 mm thick expansion joint with bitumen & Sand i/c all cost of material, labour T&P etc. for proper comp. of work.
E/w in filling for making diversion, strenthening of banks, making approaches of VRB in ordinary soil in layers i/c cost of all labours T& P with ramming drassing required lead up to 200 meter and lift up to 1.50 meter. The earth from cutting or removing of diversion, to be used in making embankment or to be deposited is spoil bank within 30m distence as per directed by Engineer-in-charge, including cost of all labour and T&P etc. complete
Providing and laying of RBM below 80 mm thick paved block as granular base for making approaches of VRB in ordinary soil with ramming drassing required, or as per directed by Engineer-in-charge, including cost of all labour and T&P etc. complete
Providing and Laying 80mm thick cement concrete interlocking mechanically comprased paved block over 50 mm thick ordinary sand laid as cusion after preparing hard base of 150 mm thick river bed material including cost of all material, labour and T&P etc. complete required for proper complition of work.
Earth work in cutting or removing of diversion in ordinary soil including lead up to 30 meter and lift up to 1.50 meter including cost of all labour and T&P etc. complete
Supply and Fixing Sign Board for proper completion of work
AMAR PAL SINGH (BID ID -5294902)
M/s MOHAN LAL CONTRACTOR (BID ID -5303652)
GOMATINETRA CONSTRUCTIONS (BID ID -5302541)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .