Tender Value
Refer Docs
EMD Value
₹27,100
Closing Date
3 Feb 2026, 6:55 pmClosed
Executive Engineer, RCC Upper Division Kathua
Executive Engineer, RCC Upper Division Kathua
Restoration of Cement Concrete Lining of Main Ravi Canal from RD 35880-36100 M and RD 36600-36800
2026_IFC_301468_1
e-NIT No 12 of 2025-26 RCC UPPER DIVISION KATHUA DATE 27-01-2026
Open Tender
Civil Works - Canal
25 days
Kathua
As per NIT
2 documents required · 2 mandatory
₹1,000
Executive Engineer, RCC Upper Division Kathua
₹27,100
20 Feb 2026
27 Jan 2026
4 Feb 2026
27 Jan 2026
3 Feb 2026
28 Jan 2026
Clearing jungle including uprooting of rank, vegetation, grass, brushwood, trees and saplings of girth upto 30cm measured at height of 1m above ground level & removal of rubbish material upto a distance of 50m outside the periphery of the area cleared
Silt clearance from the canal inclusive of the initial lead and lift of 50m and 1.5m resp.Dry silt
Wet Silt
Demolishing of the cement concrete manually/by mechanical means 1:3:6or richer mix:-
Extra for every additional lift (2 no.) of 1.50 m or part thereof in:
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: Deduct for not rolling and watering.
Preparing and dressing bed of canals for lining in ordinary soil (Clay).
Preparing and dressing side slopes of canals for lining in ordinary soil (Clay)
Providing and laying 10 mm thick, 1 cement:3 fine sand mortar slurry on beds and side slopes (prior to laying in-situ concrete lining)
Providing and laying in situ concrete lining using M-10 nominal mix concrete 1:3:6 (1 cement : 3coarse sand : 6 graded stone aggregates 20 mm nominal size): On slopes
On bed
Curing canal lining for 28 days: on bed
Curing canal lining for 28 days: on slopes
Scaffolding for the canal lining
Carriage of Sand and Aggregate avg. 20 km by Mechanical Transport.
Carriage of earth from source to site of work average lead 5 km by Mechanical Transport
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_978306.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid