| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹27.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹30.1 L+₹2.2 L (7.90%)Admitted-Fee/PreQual/Technical/Finance | ₹30.1 L+₹2.2 L (7.90%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹30.3 L+₹2.4 L (8.60%)Admitted-Fee/PreQual/Technical/Finance | ₹30.3 L+₹2.4 L (8.60%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹30.5 L+₹2.6 L (9.30%)Admitted-Fee/PreQual/Technical/Finance | ₹30.5 L+₹2.6 L (9.30%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SOCIAL SATISFACTORY CONSTRUCTION & SUPPLIER L3 | M/S Y SOMORJIT SINGH L2 | Laishram Guni Singh L1 | JOYBA HUIDROM L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m, as directed by the Engineer-in- Charge. All kinds of soil | 66.6 | cum | 534 ₹35,564.4 | 530 ₹35,298 Lowest | 557.8 ₹37,149.48 | 542 ₹36,097.2 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - (a) 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 10.67 | cum | 11,750 ₹1,25,372.5 | 11,770 ₹1,25,585.9 | 11,088.6 ₹1,18,315.36 Lowest | 11,800 ₹1,25,906 |
| 3.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement :(a) 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 23.42 | cum | 18,300 ₹4,28,586 | 18,240 ₹4,27,180.8 | 16,393 ₹3,83,924.06 Lowest | 18,330 ₹4,29,288.6 |
| 4.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 13.67 | cum | 18,952 ₹2,59,073.84 | 18,940 ₹2,58,909.8 | 17,020.48 ₹2,32,669.96 Lowest | 18,948 ₹2,59,019.16 |
| 5.00 | Providing and laying upto floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 12.6 | cum | 18,100 ₹2,28,060 | 18,200 ₹2,29,320 | 15,923.19 ₹2,00,632.19 Lowest | 18,160 ₹2,28,816 |
| 6.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.(ii) Thermo-Mechanically Treated bars | 3,826 | kgs | 147 ₹5,62,422.29 | 146 ₹5,58,596.29 | 126.94 ₹4,85,672.69 Lowest | 149 ₹5,70,074.3 |
| 7.00Centering and shuttering including strutting, propping etc. and removal of form for: | |||||||
| 8.00 | (a) Foundations, footings, bases of columns, etc. for mass concrete. | 106.96 | sqm | 598 ₹63,962.08 Lowest | 605 ₹64,710.8 | 622.7 ₹66,603.99 | 610 ₹65,245.6 |
| 9.00 | (b) Columns, Pillars, Piers, Abutments, Posts and Struts. | 108.45 | sqm | 1,248 ₹1,35,345.6 | 1,240 ₹1,34,478 Lowest | 1,248.98 ₹1,35,451.88 | 1,245 ₹1,35,020.25 |
| 10.00 | (C ) Suspended floors, roofs, landings, balconies and access platform. | 142.65 | sqm | 982 ₹1,40,082.3 | 980 ₹1,39,797 | 966.42 ₹1,37,859.81 Lowest | 998 ₹1,42,364.7 |
Tender Value
₹21.8 L
EMD Value
₹43,700
Closing Date
20 May 2026, 3:00 pmClosed
Executive Engineer, Manipur University.
Manipur University Canchipur.
Providing and fixing of compound wall and gate for Education department building, MU.
2026_MU_908407_1
423/2026-27/ENGG/MU/Civil
Open Tender
Civil Works
Works
30 days
As Per Tender Document
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
The Registrar MU
₹43,700
Canchipur
26 May 2026
12 May 2026
21 May 2026
12 May 2026
20 May 2026
12 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m, as directed by the Engineer-in- Charge. All kinds of soil | 1 | cum | 1 | ₹1 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - (a) 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | cum | 1 | ₹1 |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level upto floor five level excluding cost of centering,shuttering, finishing and reinforcement :(a) 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 1 | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | cum | 1 | ₹1 |
| 5 | Providing and laying upto floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | cum | 1 | ₹1 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.(ii) Thermo-Mechanically Treated bars | 0.8 | kgs | 1 | ₹0.8 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: | - | - | - | - |
| 8 | (a) Foundations, footings, bases of columns, etc. for mass concrete. | 1 | sqm | 1 | ₹1 |
| 9 | (b) Columns, Pillars, Piers, Abutments, Posts and Struts. | - | sqm | 1 | - |
| 10 | (C ) Suspended floors, roofs, landings, balconies and access platform. | - | sqm | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_954750.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .