| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.0 CrAccepted-AOC | L1 | Accepted-AOC L1 Letter No. 1745(S)WE Date-24.04.2026 | |
| 2 | L2₹101.1 Cr+₹3.2 Cr (3.26%)Rejected-Finance COLLAGE ROAD JASHPURNAGAR JASHPURNAGAR JASHPUR CHHATTISGARH 496331 | JASHPUR | CHHATTISGARH | 496331 | L2 | Rejected-Finance L2 Letter No. 1748(S)WE Date-24.04.2026 | |
| 3 | Rejected-Technical 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | - | Rejected-Technical non Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/s Vinod Kumar Jain L2 | SRMV CONSTRUCTION PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Road Work
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Mechanical means using dozer , In area of light jungle
( Vide RCD SOR- 2.03 (ii) A effective from 28.07.2022) | 23.09 | Hect. | 500 ₹11,545 Lowest | 1,25,555 ₹28,99,064.95 |
| 2.00 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. Girth from 300mm to 600mm
(Vide RCD SOR - 2.01 A (i) effective from 28.07.2022) | 80 | Each | 50 ₹4,000 Lowest | 245 ₹19,600 |
| 3.00 | Cutting of trees, excluding removal of stumps and roots of trees (Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.)
Girth from 600mm to 900mm
(Vide RCD SOR - 2.01 A (ii) effective from 28.07.2022) | 120 | Each | 50 ₹6,000 Lowest | 385 ₹46,200 |
| 4.00 | Cutting of trees, excluding removal of stumps and roots of trees (Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.)
Girth from 900mm to 1800mm
(Vide RCD SOR - 2.01 A (iii) effective from 28.07.2022) | 192 | Each | 50 ₹9,600 Lowest | 705 ₹1,35,360 |
| 5.00 | Cutting of trees, excluding removal of stumps and roots of trees (Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.)
Girth Above 1800m
(Vide RCD SOR - 2.01 A (iv) effective from 28.07.2022) | 8 | Each | 50 ₹400 Lowest | 1,405 ₹11,240 |
| 6.00 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.) Girth from 300mm to 600mm
(Vide RCD SOR - 2.01 B (i) effective from 28.07.2022) | 80 | Each | 50 ₹4,000 Lowest | 185 ₹14,800 |
| 7.00 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to aeffective from 28.07.2022)effective from 28.07.2022) lead of 1000 metres and earth filling in the depression/ pit.) Girth from 600mm to 900mm
(Vide RCD SOR - 2.01 B (ii) effective from 28.07.2022) | 120 | Each | 60 ₹7,200 Lowest | 255 ₹30,600 |
| 8.00 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.) Girth from 900mm to 1200mm
(Vide RCD SOR - 2.01 B (iii) effective from 28.07.2022) | 192 | Each | 60 ₹11,520 Lowest | 295 ₹56,640 |
| 9.00 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.) Girth Above 1800m
(Vide RCD SOR - 2.01 B (iv) effective from 28.07.2022) | 8 | Each | 60 ₹480 Lowest | 375 ₹3,000 |
| 10.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) PCC Cement Concrete M 15
(Vide RCD SOR - 2.04 (ii) A effective from 28.07.2022) | 1,776 | Cum. | 500 ₹8,88,000 | 455 ₹8,08,080 Lowest |
Tender Value
₹92.8 Cr
EMD Value
₹92.8 L
Closing Date
28 Aug 2025, 12:00 pmClosed
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, LATEHAR
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, LATEHAR, Near Thana Chowk Latehar
Widening and Strengthening - Re-Construction of Barwadih - Mandal - Bhandariya (Part-1, Ch.-0.00 Km. to Ch.-25.00 Km.) (Total Length-25.00 Km.) Road.
2025_CECOM_103633_1
RCD/LATEHAR/501/2025-26 (1st Call)
Open Tender
Civil Works
Item Rate
720 days
Barwadih - Mandal - Bhandariya (0.00 to 25.00 Km.)
Document supporting technical qualification as per SBD document
3 documents required · 3 mandatory
₹10,000
₹92.8 L
Chief Engineer (Comm), RCD, Jharkhand, Ranchi
4 Jun 2026
1 Aug 2025
29 Aug 2025
1 Aug 2025
28 Aug 2025
1 Aug 2025
7 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Work
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Mechanical means using dozer , In area of light jungle
( Vide RCD SOR- 2.03 (ii) A effective from 28.07.2022) | 23.09 | Hect. | - | - |
| 2 | Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. Girth from 300mm to 600mm
(Vide RCD SOR - 2.01 A (i) effective from 28.07.2022) | 80 | Each | - | - |
| 3 | Cutting of trees, excluding removal of stumps and roots of trees (Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.)
Girth from 600mm to 900mm
(Vide RCD SOR - 2.01 A (ii) effective from 28.07.2022) | 120 | Each | - | - |
| 4 | Cutting of trees, excluding removal of stumps and roots of trees (Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.)
Girth from 900mm to 1800mm
(Vide RCD SOR - 2.01 A (iii) effective from 28.07.2022) | 192 | Each | - | - |
| 5 | Cutting of trees, excluding removal of stumps and roots of trees (Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres.)
Girth Above 1800m
(Vide RCD SOR - 2.01 A (iv) effective from 28.07.2022) | 8 | Each | - | - |
| 6 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.) Girth from 300mm to 600mm
(Vide RCD SOR - 2.01 B (i) effective from 28.07.2022) | 80 | Each | - | - |
| 7 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to aeffective from 28.07.2022)effective from 28.07.2022) lead of 1000 metres and earth filling in the depression/ pit.) Girth from 600mm to 900mm
(Vide RCD SOR - 2.01 B (ii) effective from 28.07.2022) | 120 | Each | - | - |
| 8 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.) Girth from 900mm to 1200mm
(Vide RCD SOR - 2.01 B (iii) effective from 28.07.2022) | 192 | Each | - | - |
| 9 | Removal of stumps and roots including backfillinbg with suitable material to required compaction (Removal of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.) Girth Above 1800m
(Vide RCD SOR - 2.01 B (iv) effective from 28.07.2022) | 8 | Each | - | - |
| 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) PCC Cement Concrete M 15
(Vide RCD SOR - 2.04 (ii) A effective from 28.07.2022) | 1,776 | Cum. | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument.pdf
Tender Documents • 5.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .