| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30,711.58Admitted-Fee/PreQual/Technical/Finance | -4.00% | ₹30,711.58 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹30,989.90+₹278.32 (0.91%)Admitted-Fee/PreQual/Technical/Finance | -3.13% | ₹30,989.90+₹278.32 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32,000
Closing Date
18 Aug 2026, 1:00 pmClosed
EXECUTIVE ENGINEER PHE CIVIL DIVISION AWANTIPORA
EXECUTIVE ENGINEER PHE CIVIL DIVISION AWANTIPORA
Providing water supply facillity to new school building of Govt. upper primary school Hajibal.(under District Capex2026-27)
2026_PHE_320795_7
NIT11/PHA of 2026-27
Open Tender
Civil Works - Water Works
Percentage
10 days
EXECUTIVE ENGINEER PHE CIVIL DIVISION AWANTIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER PHE CIVIL DIVISION AWANTIPORA
19 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
18 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) for shafts, wells, cesspits the like not exceeding 10 sqm on plan, including dressing of sides ramming of bottoms lift upto 1.5 m, including getting out excavated earth disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil. | 13.05 | Cum | 256.85 | ₹3,351.89 |
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) for shafts, wells, cesspits the like not exceeding 10 sqm on plan, including dressing of sides ramming of bottoms lift upto 1.5 m, including getting out excavated earth disposal of surplus excavated earth as directed: All kinds of soil (1 meter from cutting edge). | 13.05 | Cum | 479.3 | ₹6,254.87 |
| 2 | Laying fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings Earth work.20 mm dia Gi Pipes | 90 | Mtr | 22.25 | ₹2,002.5 |
| 2.01 | 25 mm dia. nominal bore | 200 | Mtr | 33.7 | ₹6,740 |
| 3 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing fixing Tee, including cutting threading the pipe etc. complete 25 to 40 mm nominal bore | 7 | No. | 730.25 | ₹5,111.75 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming watering, lead upto 50 m lift upto 1.5 m. | 23.49 | Cum | 218.4 | ₹5,130.22 |
| 5 | Carriage of material from divisional store up to dumping site of work, including loading, unloading stacking etc. complete by Mechanical Transport G.I /C.I pipe avg. lead upto 15 Km | 1 | Trip | 3,400 | ₹3,400 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1067838.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .