Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹22.1 L+₹58,603.93 (2.73%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-PHOTO UPLOADED BY BIDDER MUST SHOW COORDINATES SHOWING LATTITUDES AND LONGITUDES DATE TIME AND NAME OF PLACE AS PER NIT | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-EDITED PHOTO UPLOADED |
Tender Value
₹19.5 L
EMD Value
₹38,980
Closing Date
6 Oct 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
as per nit
2026_RDPR_326267_2
e-Nit 50 of REW Ramban(ddc 2nd call)
Open Tender
Civil Works
Percentage
BANIHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹38,980
Yes
12 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All Kinds of Soil 80% | 21.44 | cum | 592.9 | ₹12,711.78 |
| 2 | Hard Rock 20% | 4.29 | cum | 940.3 | ₹4,033.89 |
| 3 | Providing and laying stone soling in horizontal position including cost of stones including backing filling. | 3 | cum | 1,205 | ₹3,615 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2 | cum | 5,202.5 | ₹10,405 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 18.75 | cum | 5,732.6 | ₹1,07,486.25 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement. . 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) upto foundation | 7.2 | cum | 9,395.7 | ₹67,649.04 |
| 7 | Steel Reinforcement for R.C.C work with TMT bars | 792 | kg | 123.2 | ₹97,574.4 |
| 8 | Bearings Providing and installing in position of POT- PTFE/ Elastomeric bearings at free/ fixed ends of Truss girder. over abutments and pier locations as per drawings which shall include the following: | 4 | nos | 25,000 | ₹1,00,000 |
| 9 | P/F of 25mm bar dia 450mm long by way of drilling holes in existing structure and applying silicon coatings on them All Inclusive | 12 | nos | 2,500 | ₹30,000 |
| 10 | Centering and shutring inluding struting and proping Etc. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 29.4 | sqm | 628.95 | ₹18,491.13 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_1103315.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .