Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹19.7 L+₹24,222.80 (1.24%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹20.0 L+₹53,280.88 (2.73%)Rejected-Finance | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹20.2 L+₹74,172.11 (3.80%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 | |
| 5 | L5₹20.5 L+₹1.0 L (5.29%)Rejected-Finance | L5 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | ARTIST BRO L1 | OM SAI CONSTRUCTION COMPANY L6 | AJ ENTERPRISES L3 | DALMENDRA SINGH L5 | M/S SHREE JI CONTRACTOR L2 | Akash Contractor L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 9.63 | CuM. | 600 ₹5,778 | 600 ₹5,778 | 500 ₹4,815 | 300 ₹2,889 | 39 ₹375.57 Lowest | 320 ₹3,081.6 |
| 2.00 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 31.39 | CuM. | 500 ₹15,695 | 650 ₹20,403.5 | 405 ₹12,712.95 | 300 ₹9,417 | 42 ₹1,318.38 Lowest | 280 ₹8,789.2 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 139.53 | CuM. | 80 ₹11,162.4 | 140 ₹19,534.2 | 79 ₹11,022.87 | 80 ₹11,162.4 | 129 ₹17,999.37 | 65 ₹9,069.45 Lowest |
| 4.00 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 8.22 | CuM. | 5,100 ₹41,922 | 5,300 ₹43,566 | 4,970 ₹40,853.4 Lowest | 5,100 ₹41,922 | 5,500 ₹45,210 | 6,000 ₹49,320 |
| 5.00 | Providing & laying R.C.C. 1:1.5:3 (M-20) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 131.73 | CuM. | 5,700 ₹7,50,861 | 5,500 ₹7,24,515 Lowest | 5,920 ₹7,79,841.6 | 5,500 ₹7,24,515 Lowest | 5,700 ₹7,50,861 | 6,700 ₹8,82,591 |
| 6.00 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 13.77 | CuM. | 6,500 ₹89,505 | 5,800 ₹79,866 Lowest | 6,669 ₹91,832.13 | 5,900 ₹81,243 | 5,900 ₹81,243 | 7,000 ₹96,390 |
| 7.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 20.18 | SqM. | 500 ₹10,090 | 800 ₹16,144 | 455 ₹9,181.9 | 600 ₹12,108 | 305 ₹6,154.9 | 260 ₹5,246.8 Lowest |
| 8.00 | Centering and shuttering for RCC T- Beam bridge,syphon,aqueduct,& box culvert above 3 m span including cost of all material, T&P & labours complete( per SqM.) | 301.54 | SqM. | 600 ₹1,80,924 | 700 ₹2,11,078 | 908 ₹2,73,798.32 | 700 ₹2,11,078 | 366 ₹1,10,363.64 Lowest | 400 ₹1,20,616 |
| 9.00 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 9.35 | M.T. | 70,000 ₹6,54,500 | 74,000 ₹6,91,900 | 58,942 ₹5,51,107.7 Lowest | 72,000 ₹6,73,200 | 83,000 ₹7,76,050 | 71,000 ₹6,63,850 |
| 10.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 23.8 | R.M. | 100 ₹2,380 Lowest | 175 ₹4,165 | 220 ₹5,236 | 130 ₹3,094 | 299 ₹7,116.2 | 175 ₹4,165 |
Tender Value
₹25.4 L
EMD Value
₹50,700
Closing Date
1 Oct 2026, 11:00 amClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-05/EE/2026-27 Reconstruction work of the damaged V.R.B-Cum-Fall located at km 18.105 of Garhmukteshwar Rajbaha.Lot No-37
2026_UPIDC_1176988_49
TN-05/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹50,700
14 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 9.63 | CuM. | - | - |
| 2 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 31.39 | CuM. | - | - |
| 3 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 139.53 | CuM. | - | - |
| 4 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 8.22 | CuM. | - | - |
| 5 | Providing & laying R.C.C. 1:1.5:3 (M-20) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 131.73 | CuM. | - | - |
| 6 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 13.77 | CuM. | - | - |
| 7 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 20.18 | SqM. | - | - |
| 8 | Centering and shuttering for RCC T- Beam bridge,syphon,aqueduct,& box culvert above 3 m span including cost of all material, T&P & labours complete( per SqM.) | 301.54 | SqM. | - | - |
| 9 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 9.35 | M.T. | - | - |
| 10 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 23.8 | R.M. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2240910.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .