Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹19.2 L+₹60,958.65 (3.28%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹19.6 L+₹98,963.65 (5.33%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L5₹20.6 L+₹2.1 L (11.2%)Accepted-Finance | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | BABALU CONSTRUCTION L3 | dev construction L4 | Pranshul Enterprises L5 | Aman cosntruction L1 | DEV CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in ordinary soil/sandy loam, clay including all cost of labour, T&P with all lift and lead up to 30 mtr. with proper disposal of earth as per direction of engineer in charge. | 337.39 | cum | 220 ₹74,225.8 | 88.44 ₹29,838.77 Lowest | 98 ₹33,064.22 | 100 ₹33,739 | 220 ₹74,225.8 |
| 2.00 | Excavating lime stone, sand stone or other soft rock by pick axex but not required blasting including lift upto 1.5 m. & lead upto 30 m. | 84.35 | cum | 350 ₹29,522.5 | 240.5 ₹20,286.18 | 180 ₹15,183 Lowest | 200 ₹16,870 | 350 ₹29,522.5 |
| 3.00 | Laying C.C. 1:2:4 (M–15) in raft with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of workas per direction of Engineer-in-charge. | 48.27 | cum | 6,500 ₹3,13,755 | 6,232.2 ₹3,00,828.29 Lowest | 7,100 ₹3,42,717 | 7,000 ₹3,37,890 | 6,500 ₹3,13,755 |
| 4.00 | Centering & shuttering for C.C.. work in different parts of structure as below including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 74.79 | sqm | 800 ₹59,832 | 225 ₹16,827.75 | 195 ₹14,584.05 | 180 ₹13,462.2 Lowest | 800 ₹59,832 |
| 5.00 | Laying reinforced cement concrete in M-25 with OPC-43 Grade Cement ,coarse sand of FM>2.0,crushed hard stone grit size 4.75 -20 mm including cost of all material with all lead & lift and mechanical mixing,labour ,T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 6.06 | cum | 8,000 ₹48,480 Lowest | 9,250 ₹56,055 | 10,250 ₹62,115 | 9,000 ₹54,540 | 8,000 ₹48,480 Lowest |
| 6.00 | Centering & Shuttering for RCC. work including cost of all material,labour and T&P etc. required for proper completion of work. | 20.28 | sqm | 700 ₹14,196 | 810 ₹16,426.8 | 850 ₹17,238 | 430 ₹8,720.4 Lowest | 700 ₹14,196 |
| 7.00 | Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of workas per direction of Engineer-in-charge. | 0.24 | MT | 80,000 ₹19,200 | 70,850 ₹17,004 Lowest | 71,000 ₹17,040 | 78,000 ₹18,720 | 80,000 ₹19,200 |
| 8.00 | Random rubble stone masonery in 1:3 cement (OPC 43 grade) and sand mortar including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work as per direction of Engineer-in-charge. | 178.17 | cum | 4,300 ₹7,66,131 | 4,985.1 ₹8,88,195.27 | 5,200 ₹9,26,484 | 4,800 ₹8,55,216 | 4,100 ₹7,30,497 Lowest |
| 9.00 | Raised pointing work for exposed surface of stone masonry in 1:2cm with cement OPC-43 grade, sand etc. including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work as per direction of Engineer-in-charge. | 334.94 | sqm | 200 ₹66,988 | 131.2 ₹43,944.13 | 130 ₹43,542.2 Lowest | 145 ₹48,566.3 | 200 ₹66,988 |
| 10.00 | Providing and fixing 120 mm. Dia HUME Pipe including cost of all materials, labours, T&P etc, required for proper completion of workas per direction of Engineer-in-charge. | 7.5 | RM | 8,000 ₹60,000 | 6,677 ₹50,077.5 | 7,000 ₹52,500 | 6,500 ₹48,750 Lowest | 8,000 ₹60,000 |
Tender Value
Refer Docs
EMD Value
₹46,691
Closing Date
11 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, KCD1, Pipri-Sonebhadra
Office of Executive Engineer, Kanhar Construction Division-1, Pipri-Sonebhadra (231221)
Construction of Pipe Culvert at Km. 2.815 of Gajarawa Khadi Dy.
2026_UPIDC_1198604_13
07/EE/2026-27
Open Tender
Civil Works
Item Rate
60 days
Village and Post- Karail, Tehsil-Obra
Please refer Tender documents
2 documents required · 2 mandatory
₹1,180
₹46,691
26 Nov 2026
5 Nov 2026
11 Nov 2026
5 Nov 2026
11 Nov 2026
5 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in ordinary soil/sandy loam, clay including all cost of labour, T&P with all lift and lead up to 30 mtr. with proper disposal of earth as per direction of engineer in charge. | 337.39 | cum | - | - |
| 2 | Excavating lime stone, sand stone or other soft rock by pick axex but not required blasting including lift upto 1.5 m. & lead upto 30 m. | 84.35 | cum | - | - |
| 3 | Laying C.C. 1:2:4 (M–15) in raft with cement, coarse sand of F.M. not less than 2.00 and hard stone ballast as obtained from the excavation of foundation including cost of all material, labour, T&P etc. required for proper completion of workas per direction of Engineer-in-charge. | 48.27 | cum | - | - |
| 4 | Centering & shuttering for C.C.. work in different parts of structure as below including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 74.79 | sqm | - | - |
| 5 | Laying reinforced cement concrete in M-25 with OPC-43 Grade Cement ,coarse sand of FM>2.0,crushed hard stone grit size 4.75 -20 mm including cost of all material with all lead & lift and mechanical mixing,labour ,T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 6.06 | cum | - | - |
| 6 | Centering & Shuttering for RCC. work including cost of all material,labour and T&P etc. required for proper completion of work. | 20.28 | sqm | - | - |
| 7 | Carriage, Cutting, Bending, Binding and placing steel for reinforcement with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of workas per direction of Engineer-in-charge. | 0.24 | MT | - | - |
| 8 | Random rubble stone masonery in 1:3 cement (OPC 43 grade) and sand mortar including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work as per direction of Engineer-in-charge. | 178.17 | cum | - | - |
| 9 | Raised pointing work for exposed surface of stone masonry in 1:2cm with cement OPC-43 grade, sand etc. including all leads and lift, cost of soil, labour charges, manual compaction and T&P etc. for Proper Completion of work as per direction of Engineer-in-charge. | 334.94 | sqm | - | - |
| 10 | Providing and fixing 120 mm. Dia HUME Pipe including cost of all materials, labours, T&P etc, required for proper completion of workas per direction of Engineer-in-charge. | 7.5 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
RetenderLot07.pdf
Tender Documents • 2.93 MB
BOQ_2284456.xls
BOQ • 0.35 MB
Lot07corrigendum.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .