Tender Value
₹39.4 L
EMD Value
₹3.3 L
Closing Date
31 Aug 2026, 3:00 pm3d left
Chief Engineer
Nagar Nigam Firozabad
Construction of a boundary wall on government land near the water tank in Devkali Nagar, Ward No. 08.
2026_DOLBU_1178365_12
10/Nirman/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,938
Municipal Corporation
₹3.3 L
22 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift up to 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the space between thebuildingand the sides of foundation trenches or into the plinth and removal anddisposal of surplus earthas directedby the Engineer In-charge upto a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 499.95 | Cum | 150 | ₹74,992.5 |
| 2 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) | 42.89 | Cum | 5,650 | ₹2,42,328.5 |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 43.63 | Cum | 8,100 | ₹3,53,403 |
| 4 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 45.72 | Cum | 8,300 | ₹3,79,476 |
| 5 | Class-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) | 13.8 | Cum | 5,500 | ₹75,900 |
| 6 | Class-150 Brick work in 1:4 Cement and Coarse sand mortar in Super Structure including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (DSR/ PWD 6.1) | 97.57 | Cum | 5,950 | ₹5,80,541.5 |
| 7 | 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. | 924.9 | sqm | 200 | ₹1,84,980 |
| 8 | Proving and laying cement concrete in 1:2:4 with cement, coarse sand and 20mm guage stone aggregate, curing complete, including cost of form work. (PWD SOR 2025-26 Chapter No-05 Item No. 7 spec. No. 4.1) | 2.82 | Qtl | 6,600 | ₹18,612 |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 105.21 | Qtl | 7,800 | ₹8,20,638 |
| 10 | Mild Steel Iron 'Z' section windows and ventilators excluding cost of glass panes of but including supply of all materials,its fabrication, nuts and bolts, holdfast, labour and T&P required for proper completion of work as per direction of Engineer-in-charge and also including cost of handles,stays etc, inall respect at site of work. (D.S.R 2023,SI No. 10.01) | 55 | sqm | 7,000 | ₹3,85,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_2214564.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].