Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | -10.00% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹79,591.24 (33.2%)Admitted-Fee/PreQual/Technical/Finance | +19.88% | ₹3.2 L+₹79,591.24 (33.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.7 L
EMD Value
₹5,340
Closing Date
20 Jul 2026, 9:00 amClosed
COMMISSIONER MUNICIPAL CORPORATION PALI
COMMISSIONER MUNICIPAL CORPORATION PALI
RISING OF BOUNDARY WALL AT MUNICIPAL OFFICE PALI
2026_DLB_573959_1
NIT07
Open Tender
Civil Works
Percentage
PALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
COMMISSIONER MUNICIPAL CORPORATION PALI
₹5,340
Yes
23 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | - | KG | 144.5 | - |
| 2 | Providing & fixing UV stabilised fibreglass reinforced plastic sheet roofing upto any pitch including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.I plain/ bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% Ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to
IS 10192 and IS 12866.The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified. (B) 2mm thick flat. | - | SQM | 1,094 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | CUM | 5,510 | - |
| 4 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | - | SQM | 314.5 | - |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | - | SQM | 114 | - |
| 6 | Distempering with 1st quality acrylic washabledistemper (ready mixed) of approved manufacturer and of required shade and colour complete. as per manufacturer's specification. | - | SQM | 40.8 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_1020998.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .