Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | Admitted-Finance |
| 5 | Admitted-Finance 202 1ST FLOOR VIVEKANAND PURI MALKAGANJ SARAI ROHILLA NORTH DELHI DELHI 110007 UDYAM DL 01 0065084 | NORTH DELHI | DELHI | 110007 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹23,400
Closing Date
29 Jan 2024, 1:00 pmClosed
EXECUTIVE ENGINEER (SDW) I
KILOKARI SPS JAL VIHAR LAJPAT NAGAR NEW DELHI-110024
Renovation of CI Suction Sluice Valves of 30 MGD PUMP Sets No. 8 AND 9 at Kilokri New SPS
2024_DJB_252295_2
NIT_NO_11 (2023-24) EE(SDW)-I
Open Tender
Miscellaneous Works
Works
30 days
Kilokri New SPS
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹500
DJB EMD A/c No. 50448339804 at Indian Bank, Cope
₹23,400
Yes
16 Mar 2024
18 Jan 2024
29 Jan 2024
18 Jan 2024
29 Jan 2024
18 Jan 2024
Renovation of CI double flanged non rising spindle type 33” dia size “Glenfield” make (Imported) suction sluice valve of 30 MGD pump set No. 8 & 9 at Kilokri New SPS as per following works:- Provision of working platform around suction valve for execute the work by labour as per requirement with the help of MS pipe sheet and allied accessories.
Dismantling and taking out damaged dome, flap and spindle of sluice valve by cutting rusted nut bolts. The job includes all labour like fitter, cutter, helper, beldar, chowkidar, supervisor, electrician and material used like cutter set with LPG oxygen cylinder safety items & other T&P required etc. alongwith transportation i/c loading and unloading complete at site of work.
Providing / Fixing of blank flange as per existing size for avoiding leakage with the help of nut bolt, washer & rubber packing
Replacement of CI flap of suction sluice with GM rings. (As per sample for set No. 9.
Replacement of SS non rising spindle with GM nut (As per sample) for set No. 8.
Casting & replacing of CI upper dome of valve as per original shape & size.
Pumping out water caused by springs, tidal or river seepage, broken water main or drain. (Pumping out from sump in case of overflow).
Assembling of complete valve with each part and removal of blank flange from the dome of the valve. Job also including to providing of all nut bolts, washer, rubber packing as per site requirement with all tool & tackles, cartage & contingency etc. as per NHRC guidelines.
Testing & commissioning of sluice valve on full pressure & as per satisfaction of Engineer-in-charge.
M G Traders and Engineers
MITTAL TRADING COMPANY
samanvya infrastructure private limited
paramount systems
ANKIT SINGH TARAR
JAI DURGA ENGINEERS AND CONTRACORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .