Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹28.2 L+₹57,305.89 (2.07%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Due to Insufficient earnest money |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
17 Sept 2026, 6:00 pmClosed
Executive Engineer PWD Dn, Bali
Office of the Executive Engineer PWD Dn, Bali
Rate Contract on various Roads in PWD Sub Div Desuri
2026_CEPWD_596660_6
NIT No. 07 of 2026-27 PWD Dn. Bali
Open Tender
Civil Works - Roads
Percentage
210 days
Bali
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
18937-XEn PWD Dn. Bali/MD RISL Jaipur
₹60,000
Yes
24 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 10 | Hect | 10,374 | ₹1,03,740 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | 234 | Cum | 407 | ₹95,238 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead | 210.94 | Cum | 1,044 | ₹2,20,218.75 |
| 4 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 | 14,062.5 | Sqm | 151 | ₹21,23,437.5 |
| 100 | Add 18% GST on Construction Cost | 1 | Total | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 24.41 MB
Tendernotice_3.pdf
PDF • 30.02 MB
Tendernotice_4.pdf
PDF • 29.40 MB
Tendernotice_5.pdf
PDF • 0.75 MB
Tendernotice_6.pdf
PDF • 0.93 MB
Tendernotice_7.pdf
PDF • 4.50 MB
BOQ_1058134.xls
BOQ • 0.23 MB
DateBali.pdf
PDF • 0.06 MB
Date.pdf
PDF • 0.14 MB
Date.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .