Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
7 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MIR IRFAN QUADRI
Retail Engg North, Bharat Petroleum Corporation Limited
ok
13658
1000409635
Limited Tender
Works
Retail Engg North
26 Oct 2023
20 Sept 2023
7 Oct 2023
20 Sept 2023
7 Oct 2023
20 Sept 2023
SPECIAL PURCHASE CONDITIONS:
1. VALIDITY OF OFFER:
The rate quoted against this tender is valid for 120 days from the date of opening of this tender.
Bidders can quote in Indian rupees only.
3. Prices will remain firm for the supplies during the entire execution of order except for the escalation that will be given every month
depending on Steel prices.
4. Delivery Period: The time for completion of work per Purchase order/ site shall be 6 (six) weeks from the date of issue of PO. Overall
completion period is inclusive of all the activities
5. Contract Validity: Valid upto 20.07.2024 with provision for reorder of same quantities at same terms and qunatities
After supply and erection of canopy at retail outlet, TPIA shall inspect and issue certification towards satisfactory erection. 100% payment
shall be released after supply and erection of canopy and light (need basis) immediately from the date of receipt of bill along with certificate
issued by TPIA, provided that vendors submitted the PBG equivalent to 3% value or retention money as applicable.(Please refer security
deposit clause given above for details).
ANNEXURE V- TECHNICAL SPECIFICATIONS:
CANOPY STRUCTURE:
Design fabrication transport and installation of pre-engineered/ pre- fabricated steel canopy with all fittings and led light
fittings (Need Basis) as per the following specification:
STRUCTURAL DESIGN OF THE CANOPY:
The canopy steel structures to be designed considering roof live load of 50 kg per Sq.m in addition to the dead weight of the
steel and roof sheeting + false ceiling weight. Also additional 300 kg point load to be considered at all canopy corner
locations & weight of fascia @ 20kg/m may also be considered for designing. The canopy should be designed to withstand
the wind speed of 180 km/ hour (220km/ PM Hour in case of Coastal Area) or as per IS:875, whichever is higher. The design
should be safe against bending, twisting, deflection, overturning etc. as per IS:800.
Height of the canopy will be 5 to 6 meters from the finished driveway level to the bottom of fals e ceiling.
In snow prone areas/coastal area, where slanting roof canopies have been specified by site In Charge. In such cases
additional steel may be required more than 38kg , thereby Canopy weight per square meter is likely to exceed beyond
the minimum prescribed limit. Hence bidders to consider this additional requirement in their calculations, while bidding.
No claims for additional steel, roofing, etc. in the slanting roof canopies shall be entertained.
PREFAB CANOPY COLUMNS, BEAMS, GUSSETS, BRACINGS, FASCIA FRAME AND RELATED MEMBERS:
The canopy column should be rectangular box section of 400mm x 200mm x 6mm. Alternatively, the column can be built
using ISMC 200 channels welded with 6mm plates so as to give the finished rectangular columns of 400mm x 200mm x
6mm.All steel structure should conform to IS : 2062. Only branded steel like TISCO, SAIL, ESSAR, Lloyds, JINDAL Steel, VIZAG
Steel, BHUSHAN Steel, Uttam Steel to be used. Angles and Flats below the size of 50mm x 50mm for bracing fascia frame
which are not manufactured by the mentioned companies should conform to IS2062:2006. The manufacturer certificate of
the same should be provided. The depth of the roof canopy structure will be so designed so as to receive fascia of 800mm
size all around. The canopy beam structure steel to comprise of built up plate I section/ hot rolled I beam/ angle truss SHS/
RHS tubes as per design.
Necessary roof bracing , wind girders and other forms of bracing to be considered for the overall stability of the structure
and the transmission of lateral loads to the column and to stabilize the canopy movement as well as strengthen the
PRE-FAB CANOPY PURLINS:
All secondary purling should be cold formed galvanized Z sections OR galvanized C-section with 275 GSM galvanization total
both sides & yield strength of minimum 345 mpa only.
Alternatively TATA tube with 275 gsm galvanization total both sides may be used for purling.
The spacing of purling should be maximum 1.2 m. Purling at extreme ends of the canopy (i.e. approximately 100mm to
300mm from the end of canopy) is mandatory in order to provide end support to roofing/ false ceiling.
BOLTS FOR PRIMARY AND SECONDARY CONNECTIONS:
All the primary and secondary connection bolts shall be electro - galvanized of precision fasteners Unbrako, Laxmi Precision,
GKW, TVS make only. Bolts for main structural connections are grade 8.8/equivalent. Bolts for bracing, purling, girts etc. are
grade 4.6/ equivalent.
ANCHOR BOLTS WITH HEXAGANOL NUTS (2 FOR EACH BOLT):
The bolt materials shall conform to IS 2062 with minimum yield strength of 240 mpa. The lower end of the anchor bolt
should be bent with a minimum radius of curvature of 3d (diameter of the bolts) The upper exposed portion of the bolt
should have min threaded portion of 115mm (min) with one hexagonal nut followed one hexagonal lock nut. Suitable Plate
washers should be provided along with the anchor bolts.
Anchor Bolts with Hexagonal Nuts shall be supplied by the canopy vendor as per the call off issued by BPCL Engineer to
respective terr office. However, the fixing of foundation bolts/nuts in foundation is in the scope of civil vendor. Vendor needs
to ensure that standard bolt has been used in canopy foundation before start of work.
Painting of the steel structure and canopy column with two coats of Zinc chromate primer. All the steel structures other than
canopy column will be painted with white/grey enamel paint of approved make. The canopy column will be painted with
additional two coats of white enamel paint of approved make should be done.
Trapezoidal roofing profile made out of 0.55mm TCT with high tensile bare Galvalum sheet of 275 mpa min yield strength of
grade AZ-150 (55% Aluminium, 43.5% Zinc and 1.5% Silicon) with aluzinc coating of 150 GSM . The roofing should be Klippon
Sheet to have wide pans with stiffening ribs for efficient water shedding and special male female ends with full return leg on
side lap for purling support and anti capillary flute in side lap. Sheets shall be fixed to purling with concealed clips and no
fasteners to penetrate the sheeting. The clip should lock over the male rib and into the underside of the centre and female
ribs and shall be fastened to support with wafer head self drilling zinc coated fasteners. The sheets shall be supplied in
lengths to suit site dimensions for avoiding longitudinal laps in the roofing system and to ensure water tightness of the
roofing system.
APPROVED MAKES OF REROLLERS:
M/s. Interarch, M/s. Speco Tech, M/s. M G Industries, M/s. Yash Fabtech, M/s. Akanksha Sales Promoters India Pvt. Limited,
M/s. Metcraft, M/s. Conroof Industries or any other equivalent as approved by RHQ. The re-rollers shall confirm to the
approved makes of base Metal i.e. JSW, TATA, Bhushan Steel or any other equivalent as approved by RHQ.
Ridge flashing shall be flat sheets or trapezoidal matching the roof profile and bent to the ridge angle. All the other flashing
shall be flat sheets and manufactured out of the same material and thickness (i.e. Galvalum sheet of .55mm TCT) as that of
Wherever the flashing interface with trapezoidal profile roofing, filler blocks should be provided in the gaps and sealed with
silicon sealant for leak proof performance. After the installation the roof should be cleared of all the metal wastes, screws,
nails etc. Necessary profiled filler should be provided at the higher level of roof sheeting & also at the valley gutter in order to
ensure water tightness in the profile gaps. All external flashing in the roof all around excluding gutter are to be of the same
material and thickness as roof sheeting.
GUTTER AND DOWNPIPE:
Gutter shall be manufactured out of 0.91mm or more thick Plain aluminium sheets in lengths of 2.5 - 3m min. (Longer
lengths preferred). All the gutter joints shall be fixed by bulb tight rivets and silicon sealant shall be applied all over the joint
for leak proof performance. The gutter end caps shall be provided at either ends and duly sealed with silicon sealant. The
opening shall be made in the gutter for down spot position with sleeves fixed on the gutter and connecting the sown take
pipe. Silicon sealant to be applied all over the joints to ensure water tightness. The gutter slope shall be in such a way that
the water collected from the roof move on the down take pipe smoothly without stagnation of water at any point of the
gutter. Size & Shape of the gutter will be trapezoidal section of min. 400mm x 300mm with min. 200mm depth for effective
drainage of the storm water depending upon the rainfall to be designed by the supplier and approved by BPCL. The Gutter
openings at the top of the water down pipe should be provided with suitable MS wire mesh to prevent the entry of foreign
materials like dry leaves, polythene bags etc. and choke the water down pipe/drains. For effective drainage of storm water,
the heavy duty PVC drain down pipe will be designed by the supplier depending upon the rainfall in the area. However
minimum diameter of these pipes running inside columns will be 100mm. Cost of clamp, brackets and accessories etc. to be
included in the cost. Please note no structural member to be used as a gutter. Gutter to be tested with water filled for 24 hrs
to ensure it is water tight.
Provision is to be made for fixing 800mm wide fascia to be provided all along with the canopy sides. Fascia pre- coated
sheet of 0.80mm TCT with high tensile* Galvalum sheet of 540 mpa min yield strength of grade AZ- 150 (55% Aluminium,
43.5% Zinc and 1.5% Silicon) with aluzinc coating of 150 GSM. The pre-coated sheet should be finished with a 18-22 micron
polyester coating (on the exposed surface) with BPCL yellow colour over a epoxy primer of minimum 5 micron. The pre-
coated sheet to be painted with polyester as per BPCL RVI waves with BPCL BLUE colour (BPCL Yellow and BPCL Blue
should match the respective ACM colours). On the back surface, the pre-coated sheet should be finished with minimum
5 microns polyester coating over an epoxy primer of minimum 5 microns. Fascia sheet to be fixed using countersunk
screws along with the frame on all sides. The weight of the fascia on the front, rear and sides to be considered while
designing canopy.
BPCL Yellow: CMYK Combination: M10& Y-100
BPCL Blue: CMYK combination: C-100 & M-40
The Scope of this specification covers the design, manufacture, prefabrication, transportation, installation and
commissioning of the complete false ceiling system.
A. MATERIALS OF PANEL:
A1: Cold rolled steel confirming to IS 513 having Approved make of base metal is JSW, TATA or
Bhushan. The Rerolls Certificate shall confirm to the approved makes of base Metal i.e. JSW,
TATA, Bhushan Steel or any other equivalent as approved by RHQ . Panels/ sheets of Minimum
0.50 mm thick pre-coated steel (base metal 240 Mpa yield strength and coated with zinc in a
minimum thickness of 180 gms per sq.m. total of both sides). The panel/ sheet should be finished
with a 20 micron regular modified polyster coating on the exposed surface. The total coated
(TCT) should be minimum 0.58 mm. All other specification is similar as mentioned in Tender
documents. The Scope of this specification covers the design, manufacture, prefabrication,
transportation, installation and commissioning of the complete false ceiling system.
B. DESIGN CRITERIA:
B1: Ceiling system to be designed to withstand wind velocity of 180 Kmph and relevant seismic factor to the specific
location where the false ceiling is to be installed or wind load as per IS 875 Part III whichever is higher.
B2: System to be designed as fixed system in which false ceiling panels are fixed to the false ceiling runner by suitable
designed GI cleat system.
B3: The flashing, capping and trims shall be manufactured from the same materials and colour as the ceiling materials.
These are fixed with aluminium rivets or stainless pins.
B4: Maximum deflection of sheets (panels) is limited to L/325 maximum as per IS 800 deflection criteria.
C. PANEL SPECIFICATIONS:
C1: Rolled formed ceiling panels of 150 F/200 F including suitable designs of tongue and groove interlocking Ceiling
system comprising of 150mm/200mm x17mm/21mm deep panels, roll formed out of Minimum 0.5 mm thick pre-
coated steel (base metal 240 Mpa yield strength and coated with zinc in a minimum thickness of 180 gms per sq.m.
total of both sides). The panel should be finished with a 20 micron regular modified polyester coating on the exposed
surface. The total coated (TCT) should be minimum 0.58 mm. Colour of the panel shall be white matt finish.
Scope includes:
1. False Ceiling Runners of suitable section to be cold rolled formed Z section made out of GI coils with 275 GSM
galvanized and yield strength of 345 mpa or galvanized tube section/ equivalent structural members.
2. The spacing of runner should be maximum 1.2 m.
3. The false ceiling runners to be fixed to main structure by cleats with adjustable holes for level adjustments to be located
in the rafters.
4. The false ceiling panels to be joined with suitably designed splice of the same material as of the false ceiling panel.
5. The canopy supplier would liaise with the site engineer and make arrangement for cutting of false ceiling for installing
electrical fittings/fixture as directed.
NOTE: Supplier has to visit the site before supply of materials at site and get familiarized with the wind velocity, seismic
(earthquake) factor ,Bolt used in foundation and accordingly design of false ceiling to be done and submit the design
calculation and drawing details to BPCL. After completion of work, supplier has to submit warranty certificate from
manufacturer of panels to BPCL.
Documents from Vendor: The canopy supplier should provide the following documents:
1. Column reactions on foundation.
2. General Arrangement (GA) drawing for the proposed canopy.
3. Erection Drawing - 2 Sets.
4. As built drawing - 2 sets.
5. Structural stability certificate and drawing for canopy structure along with design calculation, connection design, base
plate etc. from Structural Engineer/ Consultant.
6. Test certificates of structural steel, fasteners, roofing, false ceiling materials.
7. Total Weight Calculation of the Canopy Structure meeting norms of minimum 33Kg/m2.
8. Gutter water test certificate from BPCL Engg. / Dealer.
9. Guarantee/warrantee of false ceiling/roofing materials OR proof of make/ manufacturer’s specification mentioning
strength as specified.
10. Vendor shall provide RO wise warranty certificate for False Ceiling panels & Roofing sheets.
11. Vendor to arrange for TPIA (Third Party Inspecting Agency) inspection. Charges towards TPIA inspection will be
included in the rates quoted by the vendor & no separate payment will be made towards TPIA inspection to the
12. In case of repeated failure of the vendor to confirm to the delivery period OR in case of non-conformity of any
material to the tender specifications & make of material as specified in the tender, suitable action shall be taken on
13. BPCL reserves the right to get material checked and tested by original supplier for its original verification or at any
reputed lab approved by BPCL.
14. Dimensional checks including flatness and levels will be done after erection of item at RPO, all correlation with code
will also be done at RPO.
15. If the quality of material or workmanship is not found satisfactory, the job will stand rejected and BPCL shall not be
liable to pay any compensation for this.
ANNEXURE-VI: SCOPE OF INSPECTION WITH LIST OF APPROVED TPIAS & QAP
(inspection of prefab steel canopy jobs by third party inspection agency. TPIAs which are accredited under “NABCB
accredited bodies as per requirement of ISO/IEC 17020 as Type A” in QCI’s NABCB website
(http://nabcb.qci.org.in/accreditation/reg_bod_inspection_bodies.php)
1. Inspection of PREFAB STEEL CANOPY works at the Vendors Factory premises.
a. Scope of Inspection:
• Inspection of structural Steel proposed to be used by the vendor for PREFAB STEEL CANOPY at Retail
• Inspection of all other materials like Pre-coated sheets, roofing sheets, false ceiling panels/ sheets, gutter,
bolts & nuts for makes specifications and certification of material acceptance.
• Verification of fabrication details dimensions of various PREFAB STEEL CANOPY structural & related
members with specifications & approved structural drawings.
b. Inspection stage:
Only one stage: Scope as above and QAP of Canopy. For roofing and false ceiling material, the TPIA may have
to do the inspection at RO sites.
2. Inspection of PREFAB STEEL CANOPY structural members at RO Sites :
a. Scope of Inspection:
The TPIA is required to inspect the installation of all PREFAB STEEL CANOPY structural members released from
the vendors factory for each RO, at the respective RO site and certify the acceptance of their installation and
thus the completion of the works & issue completion certificate.
b. Inspection stages:
After completion of installation of all Structural members, roofing and Gutter but before commencement
of false ceiling, Facia sheets and flashing works for acceptance including submission of inspection report of
erection viz. MS Structures, Purling, Bolts and nuts for Primary and secondary connections, Fixing of Gussets
to Anchor bolts, Roofing, Gutter and down take pipe.
• Second Stage:
After completion of installation for acceptance of PREFAB STEEL CANOPY viz false ceiling, Fascia and
Flashing including submission of inspection report along with final completion certificate indicating
completion of works in all respects.
3. Inspection Visits:
a. For each RO site, the TPIA shall undertake one visit to the Vendors factory , in such a manner that they
complete inspection when the material is ready for dispatch from the factory to the RO premises.
b. However with respect to Site Inspection the number of visits shall be two for each RO site as detailed in 2 b.
c. The inspection reports shall be submitted covering all aspects of the QAP (Quality Assurance Plan) format
applicable for each stageof inspection.
4. Instruments for inspection:
Inspectors of TPIA are expected to carry calibrated Elcometer, screw gauge, vernier callipers, measuring tape etc.
that are required for checking the physical aspects & finishes of the materials being inspected by them.
5. Co-ordination with TPIA for inspection:
It is the responsibility of the respective vendor who has been awarded PREFAB STEEL CANOPY works against this
tender to liaise/co-ordinate with TPIA & arrange for the three stage inspection as detailed above.
6. Payment to TPIA:
Payment to TPIA shall be in the scope of the vendor who has been awarded PREFAB STEEL CANOPY work against
this tender. No additional payment will be made to the vendor on this account.
7. Submission of TPIA reports
Vendor has also to submit the following reports In addition to the documents mentioned in the tender along with
the bill for release of payment.
a. Factory inspection report by TPIA in the format provided by BPCL.
b. Site inspection report by TPIA in the format provided by BPCL.
c. Photographs of each stage at sitelevel.
Notwithstanding the above inspection by TPIA, BPCL reserves the right to check for any or all of the above parameters
at the RO site if required.
Prefab Steel Canopy Vendor & TPIA vendor will be held responsible for any wrong information provided &
suitable action will be initiated against both Prefab Steel Canopy vendor & TPIA vendor.
QUALITY ASSURANCE PLAN
SCOPE OF TPI FOR WORKS AT FACTORY
MATERIAL/ INSPECTION MODE/ TYPE OF
SR. ACCEPTABLE LIMIT/ CRITERION/ SPECIFIED VALUES
PRODUCT PARAMETERS INSPECTION
Approved signed and sealed copy of structural design
Structural Drawing & Checking of and drawing by structural engineer. The design
Stability CertifIcate Drawings and parameters and drawings should be as per BPCL
Certificate specifications and layout as per Call off
Structural letter by BPCL
Drawing & Minimum 33kg/sq.m of structural members, as per
1 Stability BPCL specifications. This includes weight of columns
Certificate with base plates, trusses, fascia frame along with blind
Weight of canopy fascia. purlins but excluding the weight of roofing, false
ceiling, false ceiling runners, cleats, gutter and nuts &
bolts. TPIA Certified copy of
weight calculation sheet to be attached.
MATERIAL MAKE, GRADE & SIZE OF SECTIONS
Steel used for structural members are of approved
make. (TISCO, SAIL, ESSAR, Lloyds, JINDAL Steel, VIZAG
Steel, BHUSHAN, Uttam Steel). Angles and Flats below
MS the size of 50mm x 50 mm for bracing fascia frame
2 Structure which are not manufactured by the mentioned
Steel Visual Check
companies should conform to IS2062:2006. The
manufacturer certificate of the same should be
provided. Mention the make of the
Electrode of E-6013 or required grade to be used for
welding. Make of electrodes used for welding shall be
ESAB/ ADOR/ D& H SECHRON/ D& H WELDING
Welding Visual Check
ELECTRODES/ MAILAM METALLOGEN/ IOL. Mention
make of electrode. Manufacturer's Certificate
should be provided.
Overall quality of fabrication shall be satisfactory and
Fabrication Quality Visual Check acceptable conforming to standard Engineering
Canopy column should be rectangular box section of
400 mm x 200 mm x 6 mm (OR) column cab be built
using ISMC 200 channels welded with 6 mm plates so
Column Physical as to give the finished rectangular columns of 400 mm
Dimensional check Measurement x 200 mm x 6 mm. Mention type of column
construction & check for size & thickness. Suitable
openings to be provided at the top & bottom of the
column for cable entry & exit.
Dimensional check of
Beams, Gussets,
Physical Dimensions should conform to specifications and
Bracings, Fascia frame
Measurement Structural drawings.
related members
Holes for the bolted joints made by drilling only. Bolt
Holes for bolted
Visual Check hole Sizes are correct as per drawings. No holes by gas
cutting method allowed.
Two coats of Zinc chromate primer and on column
Surface finish Visual Check
with additional two coats of white enamel paint.
Secondary purlins should be cold formed galvanized
with 275 GSM galvanization total both sides & yield
GI sheets/ Tubes Visual Check
strength of minimum 345 mpa only (OR) TATA tube
with 275 GSM galvanization total both sides.
Cold formed galvanized Z sections (OR) galvanized C
3 Purlins Dimensional check sections (OR) TATA tube. Check for size as per the
structural drawing.
Overall quality of fabrication shall be satisfactory and
acceptable conforming to standard Engineering
Fabrication Visual check Practies. Holes for the bolted joints made by drilling
only. Bolt hole Sizes are correct as per drawings. No
holes by gas cutting method allowed.
Fascia precoated sheet of 0.80 mm TCT with high
tensile bare Galvalum sheet of 540 mpa min yield
Precoated sheet Visual Check strength of grade AZ-150 (55% Aluminum, 43.5%
Zinc and 1.5% Silicon) with aluzinc coating of
4 sheet Overall thickness of Physical Thickness shall be 0.8 mm TCT, as per
sheet Measurement specifications. Check for thickness and report.
Dimensions should conform to drawings so as to
Dimensional check Physical provide 800 mm wide facia to be provided all along
Measurement with the canopy sides.
EXPOSED SURFACE: Epoxy primer of min.
Surface finish Microns, Polyster coating of 18-22 microns. BACK
and colour Visual Check SURFACE: Epoxy primer of min. 5 Microns,
Polyster coating of min. 5 microns.
EXPOSED SURFACE : BPCL RVI waves of BPCL Blue
Colour Visual Check and BPCL yellow colour as per drawings.
SCOPE OF TPI FOR WORKS AT FACTORY/ RO PREMISES
Roofing material of 0.55 TCT with high tensile bare
Galvalum sheet of 275 mpa minimum yield
strength of grade AZ-150 with aluzinc coating of
Base metal of 150 GSM. Approved make of base metal shall be
Galvalum sheets Visual Check
JSW, TATA, Bhushan. Mention make of base
metal. Re-roller's Certificate to be provided.
Approved makes of re-rollers M/s Interarch, M/s
Speco Tech, M/s M G Industries, M/s Yash Fabtech,
Rerollers of M/s Akanksha Sales Promoters India Pvt. Ltd. M/s
Galvalum sheets Metcraft and M/s Conroof Industries.Re-roller's
certificate to be provided.
Physical Thickness shall be 0.55mm TCT, as per
1 Roofing Measurement specifications. Check for thickness and report.
Roofing shall be Klippon type with trapezoidal
Physical profile of lengths to suit the site dimensions for
Dimensional check Measurement avoiding longitudinal laps.
Panels/ sheets of 0.5 mm thick pre-coated steel
Rolled (base metal 240 Mpa yield strength and coated
formed with zinc in a minimum thickness of 180 gms per
ceiling sq.m. total of both sides). The panel/ sheet should
Visual Check be finished with a 20 micron regular modified
polyster coating on the exposed surface. The total
coated (TCT) should be
minimum 0.58 mm.
Thickness of Physical Thickness shall be minimum 0.58 mm TCT, as per
panel/ sheet Measurement specifications. Check for thickness and report.
Colour Visual Check White matt finish
Section to be cold rolled formed Z section made
False out of GI coils with 275 GSM galvanized and yi eld
Rolled ceiling Visual Check strength of 345 mpa or galvanized tube
formed runners section/equivalent structural members.
2 panels Compatible with the false ceiling panels.
Rolled formed ceiling panels of 150 F/200 F
including suitable designs of tongue and groove
check of Rolled Physical
interlocking Ceiling system comprising of
form Measurement
150mm/200mm x17mm/21mm deep panels.
SCOPE OF TPI FOR WORKS AT RETAIL OUTLETS
MATERIAL/ INSPECTION MODE/ TYPE OF ACCEPTABLE LIMIT/ CRITERION/ SPECIFIED
SR. PRODUCT PARAMETERS INSPECTION VALUES
CONFORM TO BPCL SPECIFICATIONS AND STRUCTURAL DRAWINGS
Structural members /
members sheets as per
including Purlins, their approved
Roofing, members in The installed members in Canopy are the
Precoated sheets the factory for appoved members in the factory for the
the respective respective RO site, in proper condition and
RO without any damages.
MS Structure: Columns should be vertically straight and in
Columns Plumb Plumb. (Check with plumbline).
(Gussets, Beams, All members to be erected as per structural
Bracings, Fascia Visual check drawings. Proper levels and alignment of all
frame& related members to be visually checked.Photograph to
members) be provided.
Spacing should be max. 1.2m; Mandatory to
Purlins Visual check
provide purlins at extreme end of canopy
to 300mm from the end of canopy)
The members should be connected by proper
alignment of designated holes in members with
bolts and washers of adequate size and nut locking
arrangement, as per drawings. All bolts shall be
Bolts and nuts for electro galvanised of approved makes by BPCL.
Primay and Bolts for main structural connections are grade 8.8/
Visual check equivalent and for bracings, purlins, girths, etc to
connections be 4.6/ equivalent. No hole to be left without the
bolt , as per the structural drawing and no bolt
should be left without nut.Photograph of ceiling
before falseceiling to
Gusset base welded to columns to be fixed on
Anchor bolts with Anchor bolts. Each bolt to have one hexagonal
2 hexagonal nuts Visual check nut followed by one hexagonal lock nut.
for each bolt Photograph to be provided.
Klippon type roofing sheets to be fixed to purlins
with concealed clips and no fasteners to
peneterate the sheeting. Clips to be fixed with
Roofing Visual check wafer head self drilling zinc coated fasteners. No
longitudinal laps in the roofing sheets.Photograph
to be provided.
Gutter Visual check
Gutter shall be manufactured out of 0.91 mm or
more thick Plainaluminum sheets in lengths of
- 3m min.(Longer lengths preferred). All the gutter
joints shall be fixed by bulb tight rivets andsilicon
sealant shall be applied all over the joint for leak
proof performance. The gutter end caps shall be
provided at either ends and duly sealed with silicon
sealant. The opening shall be made in the gutter for
down spot position with sleeves fixed on the gutter
and connecting the sown take pipe. Silicon sealant to
be applied all over the joints to ensure water
tightness. The gutter slope shall be in such a way that
the water collected from the roof move on the down
take pipe smoothly without stagnation of water at
any point of the gutter. Size & Shape of the gutter
will be trapezoidal section of min. 400mm x 300mm
with min. 200 mm depth for effec tive drainage of
the storm water depending upon the rainfall to be
designed by the supplier and approved by BPCL. The
Gutter openings at the top of the water down pipe
should be provided with suitable MS wire mesh to
prevent the entry of foreign materials like dry leaves,
polythene bags etc. and choke the water down
pipe/drains. After erection of canopy & finishing of
roof/ gutter job, Gutter leak test to be done by filling
with water and keeping for 24 hours. To be verified
by TPIA & shown to BPCL Engineer/ dealer or
representative. Photograph to be provided.
Minimum 150mm PVC Drain pipe of HDPE 6 kg/cm2
Down take pipe Visual Check
rating in each column
False RUNNERS: Spacing should be maximum 1.2m.
ceiling Runners fixed to main structure by cleats with
runners adjustable holes for level adjustments to be located
in the rafters.
False ceiling panels joined by splices of same
material. Panels flushed with Fascia and canopy
False ceiling panels Visual check lights should be smooth and with no visible gaps.
False ceiling is erected at level (Visual check)
Photograph to be provided.
Fixing of Fascia sheets as per alignment of BPCL RVI
drawings. Fascia sheets to be fixed with countersunk
Fascia Visual check screws.Checking of shape and length
of BPCL RVI painting. Photograph to be provided.
Flashing Visual check RIDGE FLASHING : Flat sheets or trapezoidal
matching the roof profile and roof angle of same
material as that of roofing (0.55 mm thick TCT
Galvalum sheet). All other flashing of flat sheets of
adequate size and of same material as that of
roofing. Filler blocks with silicon sealant wherever
there is flashing interface viz : Ridge and Sides of
canopy .Photograph to be provided.
FORMAT OF CERTIFICATE OF STRUCTURAL STABILITY FOR DESIGN/ SUPPLY/ FABRICATION & ERECTION OF
This is to certify that the Canopy Structure installed at M/ s. --------------------------------------------------
been designed considering the requirement of M/s. BHARAT PETROLEUM CORPORATION
-------------------------------- OFFICE, Site requirements & in confirmation to the guidelines
recommended in BIS Code IS-800 , for Structural Design against structural stability & safety
requirements and BIS Code IS- 875 or 180 km/hr, whichever is higher, to withstand the wind
The basic materials of construction & fabrication parameters considered are as fo llows:
➢ Structural members (Channels, Angles, Bars, Plates, Flats) are as per IS2062
with minimum Tensile strength 26.0 kg/mm2 .
➢ Hardware (Bolts, Nuts & Washers) confirm to code requirements of IS 1237 .
➢ Pipe for drainage IS Heavy duty PVC drain pipe of HDPE 6 kg/ cm2 rating as per IS code.
➢ All material used for welding is as per IS 814 & weld joints are full penetration Butt/ Fillet
➢ Welds with minimum weld thickness as per minimum material thickness & as per code.
The canopy has been constructed and erected as per the drawings, specifications and sound
engineering practices.
The structural canopy has been inspected by us and the erected canopy is as per
drawing and is stable and safe against overturning, deflection, Bending & Wind
Name of Structural Consultant
Structural Consultants’ Signature / Stamp
ANNEXURE-VII: SAFE PRACTICES AT ERECTION
SITES SAFE PRACTICES AT ERECTION SITES
The use of safety equipment and diligently implementing safe practices in construction sites is of paramount
importance. In order to avoid accidents please ensure to have following safety equipment at all construction sites
& inculcate the habit of using the same.
1. Adequate no. of Safety helmets -To beworn by everyone working on site and for visitors as well.
2. Adequate no. of Safety shoes-- To be worn by everyone working on site.
3. Safety harness/ belt - should be worn by people working atheight.
4. People working on electrical panel must wear proper Rubber footwear and Insulated gloves to avoid electric
5. Light pole/Emblem pole/Monolith must be erected with the help of crane or chain & pully block only. It
should never be erected manually.
6. The construction site should be properly barricaded & WORK IN PROGRESS board should be displayed
7. The installation of light fixtures on light poles should be done by proper ladder arrangement.
Area where excavation is carried out should be segregated by means of colour bands/Rope fastened on pillars
at sufficient distance from pit so as to avoid accidents in excavated area due to slippage of loose earth or
(a) The site of the execution or trench should be slopped or battered back to a safe angle of repose usually
degree or be supported with shoring by timbering or other suitable means to prevent collapse. The type
of support necessarily will depend on the type of excavation, type of soil ,the nature of ground and the
ground water condition.
(b) Barrier/Fence shall be provided for preventing people from slipping into the pit.If the pit is in Vehicular
driveway additionally a prominent board shall be put up showing EXCAVATION IN PROGRESS.
(c) Pumping out of accumulated water from pit is to be done at regular intervals. Run away water shall be
prevented from entering the excavated area as it can cause erosion of soil and sudden collapse of earth.
(d) If the excavation is carried out without shoring necessary angle of repose to be maintained at all times.
(e) No labour shall be allowed to sleep or take rest inside the pit. Kids should not be allowed to come near the
excavation work.
(f) Excavated earth shall be stacked away from cutting edge to avoid collapse of trench and sliding of heaped
earth into trench.
(g) Contractor shall ensure that the excavation does not damage any existing underground cables, pipelines,
foundation of adjoining buildings or structures etc. Wherever possible excavation shall not be so close and
deep as to undermine safety of any adjoining building or structure.
9. Contractor must ensure that:
(a) Smoking inside the premises of a working location is strictly prohibited except in the designated areas.
(b) No source of ignition shall be taken to licensed premises or job.
(c) It is essential that good house-keeping is practiced at all time to keep the work area neat and clean. No
material on any of site of work shall be so stacked as to cause danger and inconvenience to any person or
(d) At no time during working hours or at any time on site should any of the contractor s personal be under
the influence of any intoxicants nor consume liquor, drugs or other intoxicating substances.
The above instructions shall be followed to avoid any mishap during construction.
The contract is liable to be terminated in case safety equipments as indicated above are not being used at
Tech Spec of LED Light 90 Watt (Under Canopy Light) Supply and fixing-Need Basis
TECHNICAL AND FUNCTIONAL SPECIFICATIONS:
Supply of LED Street light fixtures 90 W which are totally enclosed weatherproof fittings with control gear and mounting
arrangement. The subject luminaries shall be installed at BPCL Petrol Station, normally with height of 5-6 M for under prefab
steel canopy Lighting .It should be made out of high quality materials and complying with industrial standard practices to
ensure high reliability and long life. The entire fixture shall be capable of withstanding stresses and vibrations likely to be
encountered in outdoor conditions by having necessary design/strength and protections inbuilt in its electronics within the
specified electrical parameters of the product. Luminaire shall be supplied with associated driver circuit compatible with LEDs
in all respect as required including complete optics.
TECHNICAL AND FUNCTIONAL SPECIFICATIONS (LEDs BASED Under Canopy Lights-90W)
CREE/ NICHIA/ OSRAM/BRIDGELUX/ PHILIPS
High Efficiency LED manufacturer
(Lumileds)/SAMSUNG/CITIZEN/SEOUL
Total Power consumption 90 W +/- 5W
Net Effective Lumen Output ≥ 9900 Lumens
Power Factor >0.9
Luminous flux efficacy- LED ≥145 Lm/Watt
System Efficacy (Delivered) ≥110 Lm/Watt
Usage Continuous
Colour Rendering Index (CRI) ≥70
LED Driver Efficiency ≥88%
Supply voltage range 100-320V
Frequency 47 to 53 Hz
LED Life >50,000 Burning Hrs
LED Operating Current 350mA to 700Ma
Periodic depreciation < 70% Lumen maintenance (L70)
View Angle 120 Degree
Light Colour Cool white
Fully potted encapsulated IP67 universal electronic LED
Analogue Dimming up to 60%, Supplier to produce
Dimming function concept and certification documents of dimming for
External Surge Protection 10KV /5KA SPD (Surge Protection Device)
Operating Temperature -10 to 50 C
Luminaries Colour/Finish Silver / Grey
High pressure die cast Aluminium/CRCA LM6 housing
Housing / Body of fitting with corrosion resistant powder coating with
manufacturer emblem/logo embossed/screened into
the housing. Aesthetically designed housing with Silver /
Grey colour corrosion resistant coating
Cover / glass Toughened glass of 4mm thickness/ polycarbonate light
Glare control details 60 Degree lens as Primary Optics & Toughened glass /
Diffuser as secondary optics
Lens Lens should be provided for each individual LED on a
NOs of LEDs lamp Minimum 36 no’s of LED lamps shall be used in the
luminaire. LED lamps of CREE/ NICHIA/ OSRAM/
BRIDGELUX/PHILIPS (Lumileds)/SAMSUNG
/CITIZEN/SEOUL make shall be used for the purpose. The
manufacturer shall submit the proof of procurement of
LEDs from above OEMs
A. Electrical specifications
The ballast shall be an integral part of the housing with PF ≥ 0.9 and THD ≤ 10%. The Temperature shall range from -10oC to
+50oC. The output power variation should be less than 10% and the luminaire should perform in the input voltage range of
100-320 V. Electrical connection shall be as per Class I product. Internal Wiring should be High heat/ voltage resistant XLPE/
Silicon insulated tin plated copper wire. The luminaries offered shall conform to Level-1 classification, solidly grounded Class I
product for Earthing. The luminaire should have scientific designed Heat Sink to maintain Junction temperature for optimum
LED Life. Minimum 36 no’s of LED lamps shall be used in the luminaire. LED lamps of CREE/ NICHIA/ OSRAM/ BRIDGELUX/
PHILIPS (Lumileds)/ SAMSUNG/CITIZEN/SEOUL make shall be used for the purpose.
B. Mechanical specifications
LED luminaries of 90 W Single piece Die Cast Aluminium/CRCA alloy Housing having high Conductivity acting as
heat sink, with Powder coating with distortion free, clear, Heat Resistant Toughened UV stabilized Glass in the front fixed to
the die cast Aluminium frame which shall be fixed to the housing with high quality long lasting Neoprene Rubber gasket duly
impregnated with insecticide and water repellent chemical on the Periphery of lamp compartment by means of stainless steel
screws to render it dust Proof, water proof and vermin proof and having IP-65 Protection conforming to IS:10322 (part-2) –
1982.Suitable rust-proof screws for fixing of the heat resistant toughened glass / hanging arrangement. The weight of the
overall luminaire should be less than 8 KG so that it can be handled/fixed by 1 person. The luminary’s assembly and
manufacturing process for the LED source assembly in modules/ arrays shall be designed to assure all internal components are
adequately supported to withstand sudden impacts and mechanical shock and vibration from high winds and other sources.
Minimum dimesion 440mmx260mmx130mm (LXBXH)The fixture shall carry a permanent indelible identification
(screening/embossing) as under:
• Name/Year of manufacturing
• Rated wattage (input & output)
• Voltage input
• Batch no. for identification
C. Inbuilt Protections
The Under Canopy Light shall have the following inbuilt protections:
• Over Voltage Protection
• Short Circuit. (The output circuit shall have inbuilt short circuit and open circuit Protection to the driver unit)
• Transients (Surge Voltage & Current)
D. Certifications
The equipment offered should also have certifications issued by NABL or NABL approved Lab
or Lab approved by DSIR, Ministry of Science & technology, Govt. of India and valid as on the
due date of the tender, for critical technical specifications and compliance to standards. The
minimum certifications required are
a. Type test certificates
b. Acceptance test certificates
c. Lumen Depreciation Curve of LEDs used as per L70
d. Test report as per LM79 by vendor
e. LM 80 report for the LEDs used from manufacturer
f. IP-65 certification report as per IS: 10322 (part-2)-1982
g. Compliance to the following standards:
i. EN 60598 (General Requirements & Tests)
ii. Transient voltages, Voltage dips and fluctuations’ shall conform to EN61547 or equivalent.
F. Guarantee/Warranty
Materials i.e. the full luminary shall be guaranteed against manufacturing defects, materials, workmanship and design for a
period of 5 years from the date of receipt of material. Guarantee for replacement of material / accessories should be provided
free of charges at our premises. The above guarantee will be without prejudice to the certificate of inspection or material
receipt note issued by us in respect of the materials.
The malfunctioning equipment should be replaced within 10 days of reporting by BPCL. RCA (root cause analysis) shall be
submitted by the vendor without any charges to assess the performance of the luminary, thereof. Beyond 10 days of non-
replacement/ repair of faulty luminary shall invite liquidity damage of Rs 100 per day till the same is set right as per concerned
Engineers certification.
Scope of Inspection -TPIA –LED Light –Under Canopy Luminaire:
Manufacturer will have to submit the following Test report duly certified byTPIA
Sn SPECIFICATION REQUIREMENTS
Die Cast Aluminum alloy Housing having high conductivity acting as heat sink, with
Powder coating with distortion free, clear, Heat.
Resistant Toughened UV stabilized Glass in the front fixed to the die cast Aluminum
frame which shall be fixed to the housing with high quality long lasting Neoprene
2 VISUAL Rubber gasket duly impregnated with insecticide and water repellant chemical on
the periphery of lamp compartment by means of stainless steel screws to render it
dust proof, water proof and vermin proof.
3 VISUAL Luminaries should be of silver / grey finish
The luminaries should have scientific designed Heat Sink to maintain Junction
temperature for optimum LED Life
5 VISUAL Weight of Luminaries should be handled by 1 person <8KG
6 MARKINGS Sr. No.
Name/Year of manufacturing
Rated wattage (input & output)
Batch no. for identification
7 Finishing, Workmanship and Electrical connections
8 No cracks, scratches & deformation of components
Report/Certificate
Document Verification Check
9 IP 65 Conformance Certificate
10 IS: 10322 (Part-2,) 1982 Conformance Certificate
11 LM 80 Report
12 LM 79 Report by Vendor
13 Lumen Depreciation Curve of LED as per L70
14 LED Driver- Fully potted encapsulated IP67 universal electronic LED Driver
15 External Surge Protection-10KV /5KA SPD (Surge Protection Device)
High Efficiency LED manufacturer :CREE/ NICHIA/ OSRAM/ BRIDGELUX/ PHILIPS (Lumileds)/
SAMSUNG/CITIZEN/SEOUL.
17 Minimum 36 no’s of LED lamps shall be used in the luminaire.
18 Catalogue/Drawings of luminaries with specification
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BUDGETDOC_13658.pdf
pdf • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .