Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
28 Aug 2024, 2:00 pmClosed
Superintending Engineer
Circle Office UPJNR Prayagraj
Rehabilitation of 1.50 MLD Trivenipuram SPS and Laying of rising main
2024_UPJNG_945525_1
241/E-Tender/108 date 07.08.2024
Open Tender
Civil Works - Others
90 days
Prayagraj
As per Tender Document
2 documents required · 2 mandatory
₹11,800
PM GPCU UPJNR Prayagraj
₹10 L
Prayagraj
26 Sept 2024
12 Aug 2024
28 Aug 2024
12 Aug 2024
28 Aug 2024
23 Aug 2024
14 Aug 2024
Cleaning of jungle including uprooting of rank vegetation grass bruss wood trees and removal of rubbish upto a distance of 50 m outside the periphery of area.
1.50 MLD Sewage Pumping Station
Survey, Investigation, Design, drawing and Rehabilitation of following structure including dismantling of existing structure, excavation, strengthing, plaster, nipple grouting to arrest the leakage, epoxy painting, S.S handrailing and RCC work etc along with supply, installation testing and commissioning of suitable capacity non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, motor & starter and S.S Guide rail system and composite control panel, main piping and valve (Sluice valve, Reflex valve, NRV, S.S Nut bolt washer with rubber packing, Piping with common header as per required), mechanical and manual coarse bar screen, screen gates, metering apparatus, gauges, Electro-magnetic flowmeter cum totalizer having characteristics/ MOC Liner : polyurethane or Hand Rubber / Electric MOC : SS316L/ Housing : Die Cast Aluminium or CS/ Power Supply : 90-230 V AC / Output: 4 - 20 mA with HART/ Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68/ Process Flange : SS316/Display:31/2 LCD Display/ Cable Connection: 1/2" NPT /Accuracy: 0.5% , level sensor/ indicator and transmitter, automation of SPS by SCADA system online monitering and control by PLC system, lifting arrangement including H.O.T crane with travelling trolly & chain pully block, HT/LT cable with jointing material, G.I strips, plate earthing, electric resistance rubber sheets, Diesel Generating Sets with Auto Synchronizing Panel , chequered plate and gaurds, M.S trusses, grit cover, S.S railing, lighting wiring(internal and external) etc with necessary tools and spares, provision for testing of each pumps set, valve etc at manufacturer works and at site , painting of all pumps, piping and valves with two coat enamel paint etc.including Installation, commissioning and testing of all E&M equipments complete to be the satisfaction of engineer incharge with 1 month trial and run.
Wet well
Screen Channel
Pump Room
Survey, review of design and re-design if required, supply & laying of 600 mm dia RCC NP3 Class Socket / spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches upto depth as specified below G.L. true to alignment and gradient, bedding, hydrolic testing & commissioning including barricading of site, traffic diversion arrangement, dismantling of roads, mechanical/ manual excavation, dewatering (as per requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, as per CPHEEO manual in accordance with the provisions laid down in latest version of IS 4111 (Part 1), refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, shifting & reinstatement of existing utilities if any, bailing out of water, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work.
From common Manhole to Screen Channel (Depth- 6.00 to 7.50 m BGL)
Construction of one set Staff quarter type III at Trivenipuram SPS (2 storey) with size and FSI as per the CPWD norms provided in “Revised Plinth Area Norms- for General Pool Residential Accommodation (GPRA) to be constructed for Central Govt. Employees and its applicability to all Govt. Departments, MOUD including supply of all labor, material, T&P etc. complete.
Construction of Air conditioned PLC cum Office of about 40 sqm which will include toilet block including all civil/electro-mechanical works and supply of required furnitures.
Repair and restoration of existing boundary wall including plaster, minimum 2 coat apex paint, gate as per requirement, barbed wire/MS railing over boundary wall including all material, labor, T&P etc.complete. ( length of boundary wall- Approx. 280.0 mtr )
Rehabilitation of existing panel room, DG room, pump room, toilet etc including dismantling of floor, plaster, DG plateform(if required) and construction of Tiles flooring, plastering, painting, door, window, ventilator, garland drain supply, waterproofing and electrical works i.e wiring, lighting, fan etc complete.
Cleaning and desludging of sludge of channel and wet well including disposal of sludge etc complete.
Rehabilitation of approx 6 mtr deep manhole inside the SPS campus including cleaning, plaster and replacement of manhole cover and frame etc complete.
Arrangement of light inside the SPS campus including fixing of pole, light and wiring etc complete.
Land scaping, Plantation, permanent type display board made up of MS Sheet on 500 dia GI pipes and angle support, gas filled fire hydrant etc. including all labor T&P etc complete.
Arrangement of sewage diversion during rehabilitaion of Trivenipuram SPS including hiring charges of pumps and it fittings, Laying of pipe line from common manhole to disposal point in campus, power charges, operater, labor etc complete.
Construction boring by using minimum 140 mm dia PVC pipe including supply and fixing of submersible pump, starter, connection and Construction of adequate capacity storage reservoir for potable water supply along with rising main and other appurtenant works as per Applicable Laws etc. complete.
Rehabilitation of internal CC roads of SPS campus (width of road shall be depending on the functional and access requirements of various units within the plant).;
Supply, Installation, testing and commissioning of Close Circuit Television (CCTV) System includes cameras, installation accessories, hardware and software to store data.
Supply, Installation, testing and commissioning of Solar Power Plant upto 40 kW capacity including battery bank arrangement and construction of power bank room etc complete.
Guaranteed Energy Consumption for 1.50 MLD Trivenipuram SPS, Jhunsi including Office, Campus Lighting etc. (Value should be entered , after adjusting for energy generated through solar power plant if proposed to be installed)
For flow upto 1.50 MLD
For flow > 1.50 MLD
Average Power Guaranteed (Not to be filled by bidder)(For the purpose of bid evaluation this value to be used, if absurd value will be quoted bid will be summarily rejected)
Power Charges for 1.50 MLD Trivenipuram SPS (= 1.50 MLD x ……….Unit Consumed/MLD x 10.50 x 90 days )(Not to be filled by the bidder)
Laying of Rising main by Open cut method
Supply of all materials labour T&P etc. for fixing baricatting using 100 mm dia Eucliptus wood bellies and 125 mm dia eucliptus. Wood bellies for vertical post spaced 1.5m etc. beeding with naviyal rope property overlapping at the places required and also including dismantling after laying of sewers and reusing in subsequent reacches. The dismantled materials shall remain the property af the contractor
Dismentalling of Following Types of Road including stacking of servicable materials and disposal of Unservicable materials/ Debris upto 8 km as per direction of Engineer in Charge.
Interlocking Road
CC Road
Bituminous Road
Excavation for laying of rising main (up to 3.00 mtr depth below G.L) in ordinary and mixed soil, sand, loam and clay including cutting of jointing pits, trimming dressing leveling refilling of trenches in 20cm layers watering and ramming the same including removal of surplus earth or other dismantled materials up to distance 50m from the centre of trenches.
Survey, review of design and re-design if required, Supply, Carting and laying of 250 mm dia DI K-9 Socket/spigot pipes, rubber rings jointing materials and specials froms store to the work lowering the same in to the trenches up to depth as specified below G.L true to alignment shoring and timbering if required, with mild steel/ wooden planks, refilling of trenches with proper compaction including cost of all jointing material, testing & commissioning including construction of thrust block, supply of all Specials, labour, T&P etc. required for proper completion of work. including supply & fixing of same size/as per specification sluice valve, air valve, scour valve, surge protection, condtruction of chamber etc. as per direction of Engineer In-charge.
Inside the campus
From 1.5 MLD Trivenipuram SPS to 16 MLD Jhunsi STP
Disposal of excavated of surplus earth during excavation & laying of rising main (Average lead up to 8km) including all labour, T&P etc complete.
Supply and Filling of Local Sand in Trench including watering and ramming etc complete.
Arrangement for Nala Crossing including making temporary earthen bundh, Dewatering arrangmennt, excavation with suplly of all material,Labour,T&P etc. complete.
Reinstatement of the following type of Road for sewers, manholes, sewer connecting chambers etc. including sorting out and stacking of materials ( serviceable materials) and disposal of unserviceable materials upto a distance of 50 m.
Interlocking Road
C.C. road
Bituminous road up to DBM
Bituminous road (25 mm thick Semi Dense Bituminous Concrete (SDBC) Work)
Provision for shifting and reinstatement of electric & telephone cable/Poles, Sewer/Water Lines etc. including temporary arrangements for restoration of services during execution of works
Operation & Maintenance of all civil and E&M works of 1.50 MLD Trivenipuram SPS, rising main and and all executed works for 03 months (excluding cost of power)
1st month
Manpower
Repair and maintenance
Cost of Operational DG set including fuel, lubricant,maitenance etc. Average 1 Hour per day)
2nd month
Manpower
Repair and maintenance
Cost of Operational DG set including fuel, lubricant,maitenance etc. Average 1 Hour per day)
3rd month
Manpower
Repair and maintenance
Cost of Operational DG set including fuel, lubricant,maitenance etc. Average 1 Hour per day)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid