| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H9₹44.3 L−₹4.4 L (9.07%)Accepted-AOC VILL P O MANKAR DIST BARDHAMAN PIN 713144 | MANKAR | BARDHAMAN | WEST BENGAL | 713144 | H9 | Accepted-AOC Contract Awarded to M/s Anima Enterprises being lowest bidder | |
| 2 | H1₹48.7 LRejected-Finance | H1 | Rejected-Finance Higher rate quoted than H9 | |
| 3 | H2₹48.4 L−₹32,734.81 (0.67%)Rejected-Finance | H2 | Rejected-Finance Higher rate quoted than H9 | |
| 4 | H3₹47.8 L−₹92,196.54 (1.89%)Rejected-Finance PO PS BUD BUD DISTT PURBA BURDWAN PIN 713403 | BUD BUD | PURBA BURDWAN | WEST BENGAL | 713403 | H3 | Rejected-Finance Higher rate quoted than H9 | |
| 5 | H4₹47.3 L−₹1.5 L (3.00%)Rejected-Finance | H4 | Rejected-Finance Higher rate quoted than H9 |
| Sl No | Description | Qty | Unit | K L BAKSHI AND SONS H7 | NATIONAL CONSTRUCTION CO H6 | M/S BHATTACHARJEE ENTERPRISE H3 | MS ROYAL CONSTRUCTION INDEX NO 158 2010 BKP H2 | M/S SEHGAL CONSTRUCTION H1 | ANIMA ENTERPRISE H9 | M/S JOYGURU ENTERPRISE H4 | rahul enterprise H8 | SANJAY KUMAR SUPAN H5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for drain work and removal of rubbish off the site complete all as specified and directed. | 40.97 | Cum | 666 ₹27,287.69 | 670 ₹27,451.58 | 720 ₹29,500.2 | 730 ₹29,909.93 | 750 ₹30,729.38 | 600 ₹24,583.5 Lowest | 700 ₹28,680.75 | 650 ₹26,632.13 | 675 ₹27,656.44 |
| 2.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. complete all as specified and as directed. | 109.26 | Cum | 266 ₹29,063.16 | 272 ₹29,718.72 | 300 ₹32,778 | 320 ₹34,963.2 | 350 ₹38,241 | 225 ₹24,583.5 Lowest | 290 ₹31,685.4 | 260 ₹28,407.6 | 280 ₹30,592.8 |
| 3.00 | Materials and labour for flyash brick work with old size bricks straight curved on plan exceeding 6 meter mean radius for drains etc in drainage works in CM 1:4, complete all as specified and as directed. | 218.52 | Cum | 8,533 ₹18,64,631.16 | 8,550 ₹18,68,346 | 8,625 ₹18,84,735 | 8,700 ₹19,01,124 | 8,750 ₹19,12,050 | 8,522 ₹18,62,227.44 | 8,600 ₹18,79,272 | 8,520 ₹18,61,790.4 Lowest | 8,590 ₹18,77,086.8 |
| 4.00 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 557.23 | Cum | 390 ₹2,17,319.7 | 400 ₹2,22,892 | 450 ₹2,50,753.5 | 455 ₹2,53,539.65 | 460 ₹2,56,325.8 | 362 ₹2,01,717.26 Lowest | 420 ₹2,34,036.6 | 388 ₹2,16,205.24 | 410 ₹2,28,464.3 |
| 5.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed. | 98.33 | Cum | 145 ₹14,257.85 | 150 ₹14,749.5 | 170 ₹16,716.1 | 180 ₹17,699.4 | 170 ₹16,716.1 | 107 ₹10,521.31 Lowest | 166 ₹16,322.78 | 140 ₹13,766.2 | 160 ₹15,732.8 |
| 6.00 | Removing excavated material exc. 500 m or part thereof beyond 500 m and upto total distance of 1.5 km at a level not exc. 1.5 m above the starting point complete all as specified and as directed. | 458.89 | Cum | 148 ₹67,915.72 | 150 ₹68,833.5 | 170 ₹78,011.3 | 180 ₹82,600.2 | 175 ₹80,305.75 | 117 ₹53,690.13 Lowest | 168 ₹77,093.52 | 140 ₹64,244.6 | 162 ₹74,340.18 |
| 7.00 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 196.67 | Cum | 1,895 ₹3,72,689.65 | 1,900 ₹3,73,673 | 1,966 ₹3,86,653.22 | 2,000 ₹3,93,340 | 2,100 ₹4,13,007 | 1,722 ₹3,38,665.74 Lowest | 1,950 ₹3,83,506.5 | 1,855 ₹3,64,822.85 | 1,920 ₹3,77,606.4 |
| 8.00 | M & L for Cement concrete (1:4:8) Type D2 using 40 mm graded aggregates as in foundations, filling and mass-concrete complete all as specified and directed. | 65.56 | Cum | 6,600 ₹4,32,696 | 6,625 ₹4,34,335 | 6,680 ₹4,37,940.8 | 6,700 ₹4,39,252 | 6,800 ₹4,45,808 | 6,422 ₹4,21,026.32 Lowest | 6,650 ₹4,35,974 | 6,588 ₹4,31,909.28 | 6,630 ₹4,34,662.8 |
| 9.00 | M & L for Cement concrete (1:3:6) Type C2 using 40 mm graded aggregates as in foundations, filling and mass-concrete complete all as specified and directed. | 65.56 | Cum | 7,400 ₹4,85,144 | 7,420 ₹4,86,455.2 | 7,500 ₹4,91,700 | 7,522 ₹4,93,142.32 | 7,500 ₹4,91,700 | 7,225 ₹4,73,671 Lowest | 7,430 ₹4,87,110.8 | 7,355 ₹4,82,193.8 | 7,400 ₹4,85,144 |
| 10.00 | M&L 15 mm thick rendering in cement mortar 1:4 inside and outside wall of manhole,drain, of brick work/concrete suface even and smooth without using extra cement complete all as specified and as directed. | 1,092.6 | Sqm | 342 ₹3,73,669.2 | 345 ₹3,76,947 | 355 ₹3,87,873 | 360 ₹3,93,336 | 350 ₹3,82,410 | 309 ₹3,37,613.4 Lowest | 350 ₹3,82,410 | 340 ₹3,71,484 | 340 ₹3,71,484 |
Tender Value
₹46.1 L
EMD Value
₹92,300
Closing Date
22 May 2026, 3:00 pmClosed
GE PANNGARH
GARRISON ENGINEER PANAGARH, MILITARY ENGINEER SERVICES, PO-PANAGARH, DISTT- BURDWAN, STATE-WEST BENGAL PIN-713420
All as per BOQ
2026_MES_763019_1
8500-551/E8
Open Tender
Civil Works
Works
180 days
PANNGARH
As per tender documents
6 documents required · 6 mandatory
₹500
GE Panagarh
₹92,300
18 Jul 2026
1 May 2026
23 May 2026
1 May 2026
22 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for drain work and removal of rubbish off the site complete all as specified and directed. | 40.97 | Cum | - | - |
| 2 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, pillars etc. complete all as specified and as directed. | 109.26 | Cum | - | - |
| 3 | Materials and labour for flyash brick work with old size bricks straight curved on plan exceeding 6 meter mean radius for drains etc in drainage works in CM 1:4, complete all as specified and as directed. | 218.52 | Cum | - | - |
| 4 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 557.23 | Cum | - | - |
| 5 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft/loose soil complete all as specified and directed. | 98.33 | Cum | - | - |
| 6 | Removing excavated material exc. 500 m or part thereof beyond 500 m and upto total distance of 1.5 km at a level not exc. 1.5 m above the starting point complete all as specified and as directed. | 458.89 | Cum | - | - |
| 7 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 196.67 | Cum | - | - |
| 8 | M & L for Cement concrete (1:4:8) Type D2 using 40 mm graded aggregates as in foundations, filling and mass-concrete complete all as specified and directed. | 65.56 | Cum | - | - |
| 9 | M & L for Cement concrete (1:3:6) Type C2 using 40 mm graded aggregates as in foundations, filling and mass-concrete complete all as specified and directed. | 65.56 | Cum | - | - |
| 10 | M&L 15 mm thick rendering in cement mortar 1:4 inside and outside wall of manhole,drain, of brick work/concrete suface even and smooth without using extra cement complete all as specified and as directed. | 1,092.6 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_854696.xls
BOQ • 0.45 MB
PS551.pdf
Tender Documents • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .