Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance | ₹1.1 L | 1 | Accepted-Finance Lowest Amount Quoted |
| 2 | 2₹1.1 LRejected-Finance | ₹1.1 L | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | V VEERAMANIKANDAN L2 | VELAUTHAM BALASUBRAMANIAN L1 |
|---|---|---|---|---|---|
| 1.00Repair and Renovation of Anganwadi building (South) in Munnerpallam village at Munnerpallam panchayat of Palayamkottai Panchayat Union | |||||
| 2.00 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 9 | Sqm | 285 ₹2,565 | 281.8 ₹2,536.20 |
| 3.00 | Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. | 9.8 | Sqm | 1,305 ₹12,789 | 1,303.5 ₹12,774.30 |
| 4.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 135.29 | Sqm | 275 ₹37,204.75 | 268.6 ₹36,338.89 |
| 5.00 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete | 164.6 | Sqm | 215 ₹35,389 | 211.9 ₹34,878.74 |
| 6.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 40.48 | Sqm | 325 ₹13,156 | 320 ₹12,953.60 |
| 7.00 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. | 26.4 | Sqm | 165 ₹4,356 | 156.1 ₹4,121.04 |
| 8.00 | Supply and fixing of fancy glass shade and 15 W LED Bulb | 4 | No | 485 ₹1,940 | 478 ₹1,912 |
| 9.00 | Supplyandfixingof1200mm(48")ACceilingfancompletewithsteppedelectronic300Wregulatorwith300mmdownrod on the existing clamp | 3 | No | 2,315 ₹6,945 | 2,307 ₹6,921 |
Tender Value
₹1.5 L
EMD Value
₹1,530
Closing Date
10 Mar 2026, 3:00 pmClosed
Commissioner, Panchayat Union, Palayamkottai.
Commissioner, Panchayat Union, Palayamkottai.
Repair and Renovation of Anganwadi Building (south) in Muneerpallam village at Muneerpallam panchayat of Palayamkottai Panchayat Union
2026_RDTN_670511_20
A3/422/2026
Open Tender
Construction Works
150 days
Commissioner, Panchayat Union, Palayamkottai.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,530
12 Mar 2026
5 Mar 2026
10 Mar 2026
5 Mar 2026
10 Mar 2026
5 Mar 2026
Repair and Renovation of Anganwadi building (South) in Munnerpallam village at Munnerpallam panchayat of Palayamkottai Panchayat Union
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete.
Supply and fixing of fancy glass shade and 15 W LED Bulb
Supplyandfixingof1200mm(48")ACceilingfancompletewithsteppedelectronic300Wregulatorwith300mmdownrod on the existing clamp
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_805880.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid