Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-Finance | ₹8.1 L | 1 | Accepted-Finance Admitted |
| 2 | 2₹8.6 L+₹51,922.03 (6.44%)Accepted-Finance | ₹8.6 L+₹51,922.03 (6.44%) | 2 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | Krishnakumar L1 | KKS CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Construction of Kitchen shed in High School at Pappankulam H/o Pappankulam | 1 | No | 1 ₹1 Lowest | 1 ₹1 Lowest |
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification | 18.36 | Cum | 255 ₹4,681.8 Lowest | 300 ₹5,508 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 4.56 | Cum | 5,450 ₹24,852 Lowest | 5,700 ₹25,992 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 7.7 | Cum | 373 ₹2,872.1 Lowest | 395 ₹3,041.5 |
| 5.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 1.15 | MT | 88,714 ₹1,02,021.1 Lowest | 92,000 ₹1,05,800 |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps,bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre tocentre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.a) Below sill | 28.06 | Sq.m | 528 ₹14,815.68 Lowest | 560 ₹15,713.6 |
| 7.00 | b) Column | 7.45 | Sq.m | 1,162 ₹8,656.9 Lowest | 1,250 ₹9,312.5 |
| 8.00 | c) Lintel & Roof beam | 36.15 | Sqm | 1,057 ₹38,210.55 Lowest | 1,100 ₹39,765 |
| 9.00 | Sunshade | 8.18 | Sqm | 1,162 ₹9,505.16 Lowest | 1,220 ₹9,979.6 |
| 10.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (Using MSand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (above Basement) a) Below sill | 7.1 | Cum | 9,109 ₹64,673.9 Lowest | 9,500 ₹67,450 |
Tender Value
₹8.4 L
EMD Value
₹8,440
Closing Date
27 Aug 2026, 3:00 pmClosed
Block Developement Officer (BP) Madathukulam
Block Developement Officer (BP) Madathukulam
Construction of Kitchen shed in High School at Pappankulam H/o Pappankulam
2026_RDTN_694238_1
PTMGRST 2025-2026 ROC No 780/2024/A2
Open Tender
Civil Works
Item Wise
Madathukulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,440
Yes
8 Sept 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of Kitchen shed in High School at Pappankulam H/o Pappankulam | - | No | - | - |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification | 1 | Cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1 | Cum | - | - |
| 4 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | - | Cum | - | - |
| 5 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 1 | MT | - | - |
| 6 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps,bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre tocentre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.a) Below sill | 1 | Sq.m | - | - |
| 7 | b) Column | - | Sq.m | - | - |
| 8 | c) Lintel & Roof beam | 1 | Sqm | - | - |
| 9 | Sunshade | 1 | Sqm | - | - |
| 10 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (Using MSand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete (above Basement) a) Below sill | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_834631.xls
BOQ • 0.25 MB
ppan.pdf
PDF • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .