Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.8 LAccepted-AOC | ₹42.8 L Quoted ₹46.4 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹48.8 L+₹2.4 L (5.19%)Rejected-Finance | ₹48.8 L+₹2.4 L (5.19%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹48.9 L+₹2.5 L (5.29%)Rejected-Finance | ₹48.9 L+₹2.5 L (5.29%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹49.1 L+₹2.7 L (5.84%)Rejected-Finance | ₹49.1 L+₹2.7 L (5.84%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹49.8 L+₹3.4 L (7.29%)Rejected-Finance | ₹49.8 L+₹3.4 L (7.29%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/S Deep Construction L4 | M/S PAUL CONSTRUCTION L2 | M/S BARUA REFRIGERATION WORKS L7 | THE SUPPLY AGENCY L6 | SURAJIT GOGOI L5 | M/S BARUAH ELECTRICALS L1 | 4S ASSOCIATES L3 | Chief Builders &Consultants L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for checking of earthing resistance value and identifying any defects in the existing earthings such as broken earth pit, cover, wire mess, funnel, requirement of test point, insulators, etc. and maintaining record and informing the same for necessary rectification and re-checking the earthing resistance value after rectification complete all as specified and as directed.
Note : The qouted rate shall be deemed to be included for necessary T&P, equipments, stationary, etc. | 310 | Each Job | 141 ₹43,710 | 140 ₹43,400 | 120 ₹37,200 | 132 ₹40,920 | 145 ₹44,950 | 120 ₹37,200 | 115 ₹35,650 Lowest | 138 ₹42,780 |
| 2.00 | Excavating in trenches not exc. 1.50m in wide and n. exc. 1.5m in depth for foundation, shafts, wells, cesspits, manholes, pier holes, etc. not exc. 10 sqm on plan and not exc. 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. | 27.32 | Cum | 325 ₹8,879 Lowest | 360 ₹9,835.2 | 360 ₹9,835.2 | 385 ₹10,518.2 | 355 ₹9,698.6 | 350 ₹9,562 | 345 ₹9,425.4 | 345 ₹9,425.4 |
| 3.00 | All as per Serial Item No. 2 here-in-before but excavation in trenches exc. 1.5m in wide and exc. 1.5m in depth but not exc. 3m depth complete all as specified and as directed. | 14.72 | Cum | 415 ₹6,108.8 | 410 ₹6,035.2 | 400 ₹5,888 Lowest | 440 ₹6,476.8 | 416 ₹6,123.52 | 400 ₹5,888 Lowest | 420 ₹6,182.4 | 460 ₹6,771.2 |
| 4.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc. 250mm in soft / loose soil complete all as specified and as directed. | 27.72 | Cum | 145 ₹4,019.4 | 144 ₹3,991.68 | 155 ₹4,296.6 | 154 ₹4,268.88 | 146 ₹4,047.12 | 140 ₹3,880.8 Lowest | 147 ₹4,074.84 | 161 ₹4,462.92 |
| 5.00 | Removing excavated materials not exc. 50m and depositing where directed at a level not exc. 1.50m above the starting point of soft/loose soil complete all as specified and as directed. | 14.32 | Cum | 313 ₹4,482.16 | 311 ₹4,453.52 | 330 ₹4,725.6 | 300 ₹4,296 Lowest | 320 ₹4,582.4 | 300 ₹4,296 Lowest | 315 ₹4,510.8 | 345 ₹4,940.4 |
| 6.00 | S&F 40mm dia galvanised iron pipe, 'medium grade' with all fittings, laid on trenches for mechanical protection of earth strip, etc. including taking down old unserviceable steel tubing of any grade with connections complete all as specified and as directed. | 180 | Rm | 566 ₹1,01,880 | 565 ₹1,01,700 | 595 ₹1,07,100 | 595 ₹1,07,100 | 567 ₹1,02,060 | 550 ₹99,000 Lowest | 565 ₹1,01,700 | 550 ₹99,000 Lowest |
| 7.00 | All as per Serial item No. 6 here-in-before but of size 32mm dia galvanised iron pipe. | 180 | Rm | 486 ₹87,480 | 485 ₹87,300 | 525 ₹94,500 | 528 ₹95,040 | 487 ₹87,660 | 480 ₹86,400 Lowest | 504 ₹90,720 | 530 ₹95,400 |
| 8.00 | S&F 20mm bore galvanised Iron watering pipe "medium grade", with all fittings including taking down old existing unserviceable steel tubing with connections complete all as specified and as directed. | 72 | Rm | 230 ₹16,560 | 220 ₹15,840 | 220 ₹15,840 | 220 ₹15,840 | 235 ₹16,920 | 200 ₹14,400 Lowest | 210 ₹15,120 | 230 ₹16,560 |
| 9.00 | S&F as in repairs of earthing funnel / wire mesh and nut bolt, etc. complete all as specified and as directed | 30 | Each | 118 ₹3,540 | 115 ₹3,450 | 115 ₹3,450 | 100 ₹3,000 Lowest | 119 ₹3,570 | 100 ₹3,000 Lowest | 105 ₹3,150 | 115 ₹3,450 |
| 10.00 | M&L for salt around the earthing plate in layer complete all as specified and as directed. | 1,600 | Kg | 62 ₹99,200 | 60 ₹96,000 | 50 ₹80,000 Lowest | 55 ₹88,000 | 65 ₹1,04,000 | 50 ₹80,000 Lowest | 52 ₹83,200 | 50 ₹80,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
1 Jun 2026, 6:00 pmClosed
GE (AF) JORHAT
JORHAT
REPAIR/ MAINT OF EARTHING PITS, GI WIRE EARTHING, COPPER WIRE EARTHING, GI STRIP EARTHING, LIGHTNING ARRESTOR AND CHEMICAL EARTHING AT AFS UNDER GE (AF) JORHAT
2026_MES_761280_2
8777/E8
Open Tender
Electrical and Maintenance Works
Item Rate
210 days
GE (AF) JORHAT
AS PER NIT
9 documents required · 9 mandatory
₹500
GE (AF) JORHAT
₹90,000
Yes
17 Jul 2026
18 May 2026
3 Jun 2026
18 May 2026
1 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for checking of earthing resistance value and identifying any defects in the existing earthings such as broken earth pit, cover, wire mess, funnel, requirement of test point, insulators, etc. and maintaining record and informing the same for necessary rectification and re-checking the earthing resistance value after rectification complete all as specified and as directed.
Note : The qouted rate shall be deemed to be included for necessary T&P, equipments, stationary, etc. | 310 | Each Job | - | - |
| 2 | Excavating in trenches not exc. 1.50m in wide and n. exc. 1.5m in depth for foundation, shafts, wells, cesspits, manholes, pier holes, etc. not exc. 10 sqm on plan and not exc. 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. | 27.32 | Cum | - | - |
| 3 | All as per Serial Item No. 2 here-in-before but excavation in trenches exc. 1.5m in wide and exc. 1.5m in depth but not exc. 3m depth complete all as specified and as directed. | 14.72 | Cum | - | - |
| 4 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc. 250mm in soft / loose soil complete all as specified and as directed. | 27.72 | Cum | - | - |
| 5 | Removing excavated materials not exc. 50m and depositing where directed at a level not exc. 1.50m above the starting point of soft/loose soil complete all as specified and as directed. | 14.32 | Cum | - | - |
| 6 | S&F 40mm dia galvanised iron pipe, 'medium grade' with all fittings, laid on trenches for mechanical protection of earth strip, etc. including taking down old unserviceable steel tubing of any grade with connections complete all as specified and as directed. | 180 | Rm | - | - |
| 7 | All as per Serial item No. 6 here-in-before but of size 32mm dia galvanised iron pipe. | 180 | Rm | - | - |
| 8 | S&F 20mm bore galvanised Iron watering pipe "medium grade", with all fittings including taking down old existing unserviceable steel tubing with connections complete all as specified and as directed. | 72 | Rm | - | - |
| 9 | S&F as in repairs of earthing funnel / wire mesh and nut bolt, etc. complete all as specified and as directed | 30 | Each | - | - |
| 10 | M&L for salt around the earthing plate in layer complete all as specified and as directed. | 1,600 | Kg | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
8777tender.pdf
Tender Documents • 1.33 MB
BOQ_857890.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .