Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance NO 5 255 G E B COLONY A SALAIPUDUR KOVILPATTI TUTICORIN 628 502 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628502 | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 CrAdmitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹3.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹5.3 CrAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹5.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ULTRAPOWER BUILDERS L2 | AYYAPPAN AND CO L1 | K DHINAKARAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). | 174 | MT | 1,05,000 ₹1.8 Cr | 98,000 ₹1.7 Cr | 1,50,000 ₹2.6 Cr |
| 2.00 | Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site. | 9 | MT | 1,20,000 ₹10.8 L | 1,30,000 ₹11.7 L | 1,50,000 ₹13.5 L |
| 3.00 | Supply of line materials 120 kN Polimer insulators for Zebra conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 39 | set | 5,400 ₹2.1 L | 5,000 ₹1.9 L | 100 ₹3,900 |
| 4.00 | Supply of line materials 90 kN Polimer insulators for Zebra conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 69 | set | 5,000 ₹3.5 L | 4,500 ₹3.1 L | 100 ₹6,900 |
| 5.00 | Supplying and fixing of Single Suspension Fittings for ACSR Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site, including cost of all materials, labour, lead, lift, etc complete | 39 | Set | 2,400 ₹93,600 | 3,000 ₹1.2 L | 100 ₹3,900 |
| 6.00 | Supplying and fixing of Single Tension Fittings for ACSR Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site, including cost of all materials, labour, lead, lift, etc complete | 51 | Set | 2,800 ₹1.4 L | 3,200 ₹1.6 L | 100 ₹5,100 |
| 7.00 | Supplying and fixing of Double Tension Fittings for ACSR Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete | 18 | Set | 4,800 ₹86,400 | 6,500 ₹1.2 L | 100 ₹1,800 |
| 8.00 | Supplying and fixing of Mid span joint for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete | 16 | set | 1,000 ₹16,000 | 700 ₹11,200 | 100 ₹1,600 |
| 9.00 | Supplying and fixing of Repair Sleeve for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete (set of three) | 16 | set | 650 ₹10,400 | 300 ₹4,800 | 100 ₹1,600 |
| 10.00 | Supplying and fixing of Vibration Damaper for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete. | 67 | Nos. | 1,400 ₹93,800 | 1,500 ₹1.0 L | 100 ₹6,700 |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
15 Dec 2025, 2:30 pmClosed
CE/TP-I/CNI
23 KV GIS SS Guindy Chennai32
stub setting concreting tower erection stringing 230kv sc line sc tower KTR spr R2
2025_EB_628489_1
TP1-122/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
180 days
korattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.6 L
12 Feb 2026
3 Dec 2025
16 Dec 2025
3 Dec 2025
15 Dec 2025
3 Dec 2025
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supply of line materials 120 kN Polimer insulators for Zebra conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of line materials 90 kN Polimer insulators for Zebra conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supplying and fixing of Single Suspension Fittings for ACSR Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site, including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Single Tension Fittings for ACSR Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site, including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Double Tension Fittings for ACSR Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Mid span joint for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Repair Sleeve for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete (set of three)
Supplying and fixing of Vibration Damaper for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete.
Supplying and fixing of PA Rod for Zebra as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Aluminmum Earth Bond as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Suspension clamp for Earth wire as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supplying and fixing of Tension clamp for Earth wire as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supply of Number plate as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supply of Phase plate (Set of three) as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supply of Name Board as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supply of Danger Board as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Supply of 16mm dia U bolts as per IS standard and departmental specifications as directed by the engineer incharge at site including cost of all materials, labour, lead, lift, etc complete
Labour charges for clearing of juliflora jungle without uprooting for erection & Stringing including cost of all labour, lead, lift etc., complete.
Labour Charges for check survey, clearing jungles, carrying theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Levelling the site and removing scrub jungles and earth by engaging 'JCB' with lead and lift, hire charges etc., complete.
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Providing working platform on the proposed tower location using good quality locally available filling earth to a specified height as directed by the departmental Engineer at site including cost of all materials, lead, lift, etc. complete.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Sinking well rings in loose soils, black cotton soil, sandy loam and ordinary soil under water including pumping if necessary etc., complete. for stub setting - (0-2 m First depth)
Sinking well rings in loose soils, black cotton soil, sandy loam and ordinary soil under water including pumping if necessary etc., complete. for stub setting - (2-4 m second depth)
Supplying and laying of Pre-cast RCC well rings having inner dia 1.80M, thickness 50mm and 0.30m depth including cost of all materials, curing, placing in correct position, lead, lift, etc., complete.
Supplying and laying of Pre-cast RCC well rings having inner dia 2..4M, thickness 75mm and 0.30m depth including cost of all materials, curing, placing in correct position, lead, lift, etc., complete.
PCC 1 : 2:4 Grade using 12 to 20 mm HBG metal for padding and footing concrete without form work including cost of all materials curing, labour lead and lift. etc., complete.
PCC 1 : 2 : 4 Grade using 20 mm HBG metal for chimney concrete with form work including cost of all materials curing, labour lead and lift. etc., complete.
PCC 1 : 2 : 4 Grade using 20 mm HBG metal for muffing and copping concrete with form work including cost of all materials curing, labour lead and lift. etc., complete.
Labour charges for transport of Template including assembling of template, stub and cleat and shifting of template from location to location and reassembling the same including cost of all labour, transport lead, lifts etc., complete as directed by the department engineer at site. (The template will be make own arrangement by the contractor).
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection. (Under LC condition)
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting, with good quality of zinc paint on the welded portion etc., complete.
Labour Charges for Transporting and hoisting of 120 kN Antifog suspension insulators of 14 units including cost of all labour, lead, lift etc. complete. (Under LC condition)
Labour Charges for Transporting and hoisting of 90 kN Antifog single suspension insulators of 13 units including cost of all labour, lead, lift etc. complete. (Under LC condition)
Transporting and paying out of 3 nos Zebra conductor conductor wirth fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete
Transporting and paying out of 1 no GI earth wire with fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles, paying out, etc complete
Labour charges for Stringing of 3 nos (1 Circuits) ACSR Zebra conductor sagging tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vlibrated dampers as directed by the Engineer - Continuous span (Under LC condition)
Labour charges for Stringing of 3 nos (1 Circuits) ACSR Zebra conductor sagging tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vlibrated dampers as directed by the Engineer - Single Span (Under LC condition)
Stringing of 1 no GI earth wire including paying out, rough sagging, tensioning using tensioner/puller as per specification, clipping, jumpering, fixing of dampers , transport including cost of all T&Ps, labour lead and lifts etc., complete - Continuous span (under LC condition)
Stringing of 1 no GI earth wire including paying out, rough sagging, tensioning using tensioner/puller as per specification, clipping, jumpering, fixing of dampers , transport including cost of all T&Ps, labour lead and lifts etc., complete - Sngle span (Under LC condition)
Plastering in CM 1:5 12 mm thick including cost of all materials, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
Providing Temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Lowering of LT/HT Line during stringing of power conductor and restringing to the orginal position after completion of stringing work including cost of all labour,lead, lift, etc., complete.
Painting with two coats of anti corrosive black paint over stub and leg of tower for depth of 0.45 m including cost of all materials, labours, lead and lift, etc., complete.
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete.
Labour charges for painting yellow base and black colour letters for feeder name and location number including cost of all materials, lead, lift, etc complete.
Providing special trussels for road crossing including cost of all materials lead, lift etc complete
Providing earthing arrangements to tower including cost of 3.0m length , 40mm dia B Class GI pipe and GI earth strips connected to legs with all lead, lift, etc. complete
Labour charges dismantling the existing Kundha conductor from exsisting tension / suspension tower all T & P Devoluting to stores including all materials ,labour, lead, lift, etc., complete.L.C condition (Payment will be done as per actual devolution) -
Labour charges for dismantling of GI Earthwire -1 No under L.C condition -all T & P Devoluting to stores including all materials ,labour, lead, lift, etc., complete.L.C condition (Payment will be done as per actual devolution)
Dismantling the insulator string including cost of labour for releasing ,Tools and Plants transporting charges from site etc complete (under LC condtion) for 14 units of 120 KN Disc Insulators -Devoluting to stores (Payment will be done as per actual devolution)
Dismantling the insulator string including cost of labour for releasing ,Tools and Plants transporting charges from site etc complete (under LC condtion) for 13 units of 90 KN Disc Insulators -Devoluting to stores (Payment will be done as per actual devolution)
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_751484.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid