Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
27 Aug 2026, 3:00 pmDue today
PM,UNIT-10,UPPCL
Project Manager, U.P. Projects Corporation Ltd., Unit-10, Udayog Kunj Road Near Haluwakhada (Rajwaha) Nauraiya Kheda (Nahar Kothi), Dada Nagar, Kanpur
Proposed Site Development of Park of District Library at District Kannauj, U.P.
2026_UPPRC_1178230_1
05/PM-10/UPPCL/2026-27/Dated 18.08.2026
Open Tender
Civil Works
Percentage
90 days
KANNAUJ
Proposed Site Development of Park of District Library at District Kannauj, U.P.
2 documents required · 2 mandatory
₹5,900
₹26,000
Yes
20 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Proposed Site Development of Park of District Library at District Kannauj, U.P. | - | - | - | - |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 2 | Cum. | 1,438.53 | ₹2,877.06 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.29 | Cum. | 2,479.49 | ₹719.05 |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 147.25 | Sqm. | 38.16 | ₹5,619.06 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Column | 0.57 | Cum | 7,578.07 | ₹4,319.5 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Top Band | 2.09 | Cum | 6,316.19 | ₹13,200.84 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3.61 | Qtl. | 7,530.63 | ₹27,185.57 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes in :(1 cement : 6 coarse sand) (230mm wall) | 2.95 | Cum. | 6,358.23 | ₹18,756.78 |
| 9 | 12mm thick plaster in Exterior walls with proportion of 1:6 cement & approved coarse sand | 220.97 | Sqm. | 239.95 | ₹53,021.75 |
| 10 | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surfaceto prepare the surface even and smooth complete. | 235.13 | Sqm. | 108.96 | ₹25,619.76 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.30 MB
BID.pdf
Tender Documents • 15.03 MB
BOQ_2214016.xls
BOQ • 0.41 MB
BOQ_Corrigendum.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].