| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.4 LAdmitted-Finance | -34.10% | ₹20.4 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 L+₹49,583.94 (2.43%)Admitted-Finance NAGAR PANCHAYAT KHERAGARH DISTRICT AGRA U P | AGRA | UTTAR PRADESH | 282001 | -32.50% | ₹20.9 L+₹49,583.94 (2.43%) | L2 | Admitted-Finance |
| 3 | L3₹22.2 L+₹1.7 L (8.47%)Admitted-Finance 00 BEHIND CHARCH NAYAGOWAN LAKHERA BEHIND RAMA MANI DAIRY KATNI MADHYA PRADESH 483501 | KATNI | MADHYA PRADESH | 483501 | -28.52% | ₹22.2 L+₹1.7 L (8.47%) | L3 | Admitted-Finance |
| 4 | L4₹23.2 L+₹2.8 L (13.8%)Admitted-Finance 280 B NIZAMUDDINPURA POWER HOUSE ROAD MAU | MAU | MAU | UTTAR PRADESH | -25.01% | ₹23.2 L+₹2.8 L (13.8%) | L4 | Admitted-Finance |
| 5 | L5₹23.8 L+₹3.4 L (16.5%)Admitted-Finance | -23.22% | ₹23.8 L+₹3.4 L (16.5%) | L5 | Admitted-Finance |
Tender Value
₹31.0 L
EMD Value
₹3.1 L
Closing Date
2 Jul 2026, 12:00 pmClosed
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
tajganj zone kaksh sankhya-19 bindu katra sthit namo park ka saund karan ka karya
2026_DOLBU_1163144_1
03-06-2026/NAGAR NIGAM AGRA/02-07-2026/12
Open Tender
Construction Works
Percentage
60 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
NAGAR NIGAM
₹3.1 L
22 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251) | 55.68 | Cum | 150 | ₹8,352 |
| 2 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) | 15.36 | Cum | 5,325 | ₹81,792 |
| 3 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1) | 94.78 | Cum | 5,650 | ₹5,35,507 |
| 4 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) | 160 | Sqm | 200 | ₹32,000 |
| 5 | Providlng and laying Polished Granite Black stone flooring in req0ired design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admi)ied with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. | 320 | Sqm | 3,860 | ₹12,35,200 |
| 6 | Earth work in Filling in ordinary Soil (Loam, Clay or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251) | 54 | Cum | 319.08 | ₹17,230.32 |
| 7 | R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3) | 3.2 | Cum | 7,650 | ₹24,480 |
| 8 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 2.51 | Qtl | 8,500 | ₹21,335 |
| 9 | Mild Steel or iron in Heavy Size such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 800 | Kg | 90 | ₹72,000 |
| 10 | S/F Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). including 50mm thick base with concrete 1:4rB complete as per E/l | 90 | Sqm | 1,130 | ₹1,01,700 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_2182082.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .