| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC BILASPUR | ₹10.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 LRejected-AOC | ₹11.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹11.2 LRejected-AOC SANTOKHGARH DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹11.2 L | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹10,425
Closing Date
27 Jan 2026, 12:30 pmClosed
Sr.Xen
Er.Rahul Puri Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
HED/336/2025-26
2026_HPSEB_126037_1
NO/HED-336/2025-26
Open Tender
Electrical Works
90 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹10,425
13 Feb 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
Erection Part of 11 KV HT Line & Tapping Str. 90/2024-25
Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of S.T Single Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Fixing jumper complete in all respect.
Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part of 3Ph LT Line 90/2024-25
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading & unloading:- Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 11/0.4 KV, 63 KVA Transformer 90/2024-25
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)
Erection Part of 3Ph LT Line (T.S No:-16/2024-25)
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part Augmenation 1Ph to 3Ph LT Line (T.S No:-16/2024-25)
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of Augmenation 1Ph to 3Ph LT Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no 95/2024-25)
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer)
Erection Part of 11 KV HT Line 95/2024-25
Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of S.T Single Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Fixing jumper complete in all respect.
Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part of 3Ph LT Line (T.S No:-95/2024-25)
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Supply Part of 11 KV HT Line
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate(Supply by HPSEBL 6nos)
Prov. RCC Muff (Supply by HPSEBL 6nos)
Prov. concrete filling in RCC muff
Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor(Supply by HPSEBL 1.148kms)
Prov.G.I.Wire No. 8 SWG in mtr.(Supply by HPSEBL 38.66kg)
Run Through Str. ( ∆) Formation on Singlr Pole Str.
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov. Earth Wire Clamp
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (10 kg. per Stay Set)(Supply by HPSEBL 60kg)
Prov.11kv Earthing set complete in all respect.
Prov.11kv Danger Plate (250x200x1.6 mm) (Supply by HPSEBL 6nos)
Prov. Aluminium Paint.
Prov. Red Oxide
Tapping Str. Supply Material
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate(Supply by HPSEBL 1nos)
Prov. RCC Muffs (Supply by HPSEBL 1nos)
Prov. concrete filling in RCC muff
Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No.
Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no
Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation
Prov.11kv Earthing set complete in all respect.
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
Prov. D.O Fuse Unit
Prov. Stay set complete
Prov. Stay Wire HT (10.0 kg Per Stay Set)(Supply by HPSEBL 20kg)
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Supply Part of 3-Phase LT Line
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Supply by HPSEBL 1.284kms)
Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect.(Supply by HPSEBL 6nos)
Prov. RCC Muff (Supply by HPSEBL 6nos)
Filling of RCC Muffs with concrete complete in all respect.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m(Supply by HPSEBL 32kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer(Supply by HPSEBL 6Nos)
Prov. Aluminium Paint
Prov. Red Oxide
Supply Part of 11/0.4 KV 63 KVA DTR
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA(Supply by HPSEBL 1Nos)
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (Supply by HPSEBL 2Nos)
Prov. RCC Muffs (Supply by HPSEBL 1Nos)
Prov. concrete filling in RCC muff
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Prov. Pipe Earthing Set
Prov. 6 SWG GI wire For Earthing
Prov. Panel (Distribution Box LT for MS Sheet od 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x5mm)inside .painted /powder coated after primar coating etc allied assembly MCCB 100 amp 3P 35kA , ICS =100 % ICU, KIT-KAT 200 Amp 63 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble
Prov. Copper Thimble 200 Amp
Prov. Danger Plate
Prov. Barbed Wire
Prov. LT Cable 3.5 X 70 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box(CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 100 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
Supply Part of 3-Phase LT Line (T.S No:-16/2024-25)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Supply by HPSEBL 2.316kms)
Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect.(Supply by HPSEBL 9nos)
Prov. RCC Muff (Supply by HPSEBL 9nos)
Filling of RCC Muffs with concrete complete in all respect.
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m(Supply by HPSEBL 59kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer(Supply by HPSEBL 18nos)
Prov. Aluminium Paint
Prov. Red Oxide
Supply Part Augmenation 1Ph to 3Ph LT Line (T.S No:-16/2024-25
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Supply by HPSEBL 0.615kms)
Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect.(Supply by HPSEBL 4nos)
Prov. RCC Muff (Supply by HPSEBL 4nos)
Filling of RCC Muffs with concrete complete in all respect.
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.(Supply by HPSEBL 4kg)
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Paint
Prov. Red Oxide
Supply Part of 11/0.4 KV, 100 KVA Transformer 95/2024-25
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA(Supply by HPSEBL 1nos)
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (Supply by HPSEBL 2nos)
Prov. RCC Muffs (Supply by HPSEBL 2nos)
Prov. concrete filling in RCC muff
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) (Supply by HPSEBL 28kg)
Prov. Pipe Earthing Set
Prov. 6 SWG GI wire For Earthing
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble
Prov. Copper Thimble 200 Amp
Prov. Danger Plate
Prov. Barbed Wire
Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 100 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Tapping Str. Supply Material 95/2024-25
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate(Supply by HPSEBL 1nos)
Prov. RCC Muffs (Supply by HPSEBL 1nos)
Prov. concrete filling in RCC muff
Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No.
Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Stay set complete
Prov. Stay Wire HT (10.0 kg Per Stay Set)(Supply by HPSEBL20kg)
Prov.11kv Earthing set complete in all respect.
Prov. Danger Plate
Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
Prov. D.O Fuse Unit
Supply Part of 11 KV HT Line
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate(Supply by HPSEBL3nos
Prov. RCC Muff (Supply by HPSEBL3nos)
Prov. concrete filling in RCC muff
Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor(Supply by HPSEBL(0.570kms.)
Prov.G.I.Wire No. 8 SWG in mtr.
Run Through Str. ( ∆) Formation on Singlr Pole Str.
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov. Earth Wire Clamp
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (Supply by HPSEBL 30Kg)
Prov.11kv Earthing set complete in all respect.
Prov.11kv Danger Plate (250x200x1.6 mm)Supply by HPSEBL 3Nos)
Prov. Aluminium Paint.
Prov. Red Oxide
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_185736.xls
BOQ • 0.60 MB
termandcondition.pdf
Tender Documents • 0.91 MB
additionaltermandcondition.pdf
Additional Documents • 0.57 MB
Download all tender documents and submit your bid