Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | -7.55% | ₹3.9 Cr | L1 | Admitted-Finance |
Tender Value
₹4.2 Cr
EMD Value
₹2.1 L
Closing Date
27 Apr 2026, 5:30 pmClosed
SANJEEV GUPTA
GWALIOR MUNICIPAL CORPORATION
Survey and Design of laying of sewer network including Providing, Laying, Testing and Commissioning of sewer lines in uncovered Area of Ward No. 19 at various location file NO. 24/26x9/1
2026_UAD_494220_1
MPGMC/24/26X9/1/PHE/2025-26
Open Tender
Miscellaneous Works
180 days
PHE DEPARTMENT
Please refer Tender documents.
5 documents required · 5 mandatory
₹15,000
₹2.1 L
27 May 2026
25 Mar 2026
29 Apr 2026
26 Mar 2026
27 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in Excavation for foundation,trenches for pipes/cables, or drains etc by mechanical means/ manual means (exceeding 30cm in depth) including ramming of bottom , dressing of sides, disposal of excavated earth including of all lift and lead upto 50mtr. Disposed earth to be levelled and neatly dressed. Up to 1.5 m depth | ||||||
| 2 | 3.0 m to 4.5 m depth | 0.6 | Cum | 1 | ₹0.6 | BI01010001010000000000000515BI0100001113 |
| 3 | 4.5 to 6.0 m depth | 0.8 | Cum | 0.2 | ₹0.16 | BI01010001010000000000000515BI0100001113 |
| 4 | Up to 1.5 m depth | 1 | Cum | 1 | ₹1 | BI01010001010000000000000515BI0100001113 |
| 5 | 1.5 to 3 m depth | 0.8 | Cum | 1 | ₹0.8 | BI01010001010000000000000515BI0100001113 |
| 6 | Filling
Filling available excavated earth in trenches, plinth sides of foundation of layers not exceeding 20cm, in depth including consolidation of each layer by ramming watering, lead upto 50m and lift upto 1.5m in all kinds of soils. | 0.2 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 7 | Pipe Bedding
Filling with moorum for pipe bedding or over the pipe including supply of moorum/sand. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 8 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable material separately and as per relevant clause of section 200
Bituminous Course | 0.6 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 9 | Granular Course | 0.4 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 10 | Dismantling of cement concrete pavements including breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designed locations and disposal of dismantled material upto a lead of 1000 m, stacking of serviceable & unserviceable material separately and as per relevant clause of section 200
Cement Concrete Course | 0.2 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.22 MB
TenderDocument.pdf
Tender Documents • 2.93 MB
BOQ_587857.xls
BOQ • 0.26 MB
Envelope-A.pdf
Additional Documents • 0.06 MB
Estimate.pdf
Additional Documents • 5.84 MB
Envelope-B.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid