Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹4,919.33 (2.03%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹6,088.28 (2.51%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
4 Jul 2026, 2:00 pmClosed
EE
S/O
Laying of of 250 mm dia 50 Mtr sewer line and construction of 4 nos manhole FROM HOUSE NO. 103/25 to 103/80 in ward 03 Chunniganj, KANPUR
2026_DOLBU_1160394_1
JalKal / 1048 / EE Zone 4 /
Open Tender
Miscellaneous Works
Percentage
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹5,000
13 Oct 2026
13 Jun 2026
4 Jul 2026
13 Jun 2026
4 Jul 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentelling of CC Road & its satcking old Mat, Lab, T&P etc all complete. As vibhagiy rate sanctioned in 2025-26 (A) For sewer Line 250 mm dia (B) For M.H. | 51.52 | Sqm | 404.6 | ₹20,844.99 |
| 2 | Excavation of trenches manually or machenically in soil mixed moorum/shingle/kanker for pipe line with lift upto 1.5 mtr etc all complete As vibhagiy rate sanctioned in 2025-26 (A) For sewer Line 250 mm dia (B) For M.H | 77.28 | Sqm | 291.89 | ₹22,557.26 |
| 3 | Concrete in 20 guage Brick blallst L.sand & cement in foundation under floor in proper of 10:5:1 including supply Lab, Mat, T&P etc all complete As vibhagiy rate sanctioned in 2025-26 | 5.33 | Sqm | 4,747.35 | ₹25,303.38 |
| 4 | Making necessary arranment for barricading with ballies horizontally & vertically with provision of red flag, including all materials, lab, etc all complete,. As vibhagiy rate sanctioned in 2025-26 (A) For sewer Line 250 mm dia (B) For M.H | 70 | cum | 200 | ₹14,000 |
| 5 | 1st class brick work for construction of sluice valve chamber in 1:3 cement, sand mortor including supply of Lab, Mat, T&P etc all complete ( As per UPJN SOR 1 2025-26 (A) for 250mm dia sewer line (B) For M.H. | 7.89 | cum | 7,200 | ₹56,808 |
| 6 | 12 mm thick plaster with 1:3 cement & L. sand mortor with supply of Lab, Mat T&P etc all complete As vibhagiy rate sanctioned in 2025-26 | 28.8 | cum | 237.17 | ₹6,830.5 |
| 7 | Providing bier to retain sewage water etc all complete. As vibhagiy rate sanctioned in 2025-26 | 4 | Nos | 450 | ₹1,800 |
| 8 | RCC work in 1:1.5:3 cement stone cement ballast slab including supply of Lab, Mat, T&P etc all complete As vibhagiy rate sanctioned in 2025-26 | 1.43 | Qtl | 11,278.57 | ₹16,128.36 |
| 9 | Mild steel iron work in slab As vibhagiy rate sanctioned in 2025-26 | 1.12 | cum | 13,900 | ₹15,568 |
| 10 | Bailing out of water etc all complete. | 5 | cum | 470 | ₹2,350 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
17.pdf
Tender Documents • 1.84 MB
BOQ_2174684.xls
BOQ • 0.34 MB
788.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .