Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-Finance NAKDEI ULLUNDA SUBARNAPUR PIN 767062 | SONEPUR | ODISHA | 767062 | ₹25.3 L | L1 | Accepted-Finance Winner in Transparent lottery Programme |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not winner in the Tranparent lottery Programme |
| 3 | Rejected-Technical BARZ PATRA KHORCHA | VALSAD | GUJARAT | 396020 | - | - | Rejected-Technical Not winner in the Tranparent lottery Programme |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not winner in the Tranparent lottery Programme |
| 5 | Rejected-Technical AT MUNDOGHAT PO HIKUDI PS BIRMAHARAJPUR DIST SUBARNAPUR PIN 767062 | SONEPUR | ODISHA | 767062 | - | - | Rejected-Technical Not winner in the Tranparent lottery Programme |
Tender Value
₹25.4 L
EMD Value
₹25,370
Closing Date
18 May 2026, 5:30 pmClosed
Executive Engineer, Tel Irr Division, Sonepur
O/o The EE,Tel Irrigation Division,Sonepur
Trough wall lining from RD 1100 m to RD 1510 m of Gurupanga Minor No. 15L off taking from Hingima Distributary of HIP.
2026_CEBMT_128934_3
EE,TID,SNP-04/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Sonepur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹25,370
Yes
2 Aug 2026
8 May 2026
19 May 2026
8 May 2026
18 May 2026
8 May 2026
8 May 2026 - 13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil with initial lead of 50m and initial lift of 1.50m and laying the excavated materials canal bank in filling reaches/ spoil banks in 22.5cm layers including trimming of slopes and bed to design section as directed by the Engineer –in –charge. | - | Cum | 250.5 | - |
| - | Supplying and spreading coarse sand in canal bed in proper thickness and level for sub base of cement concrete lining in bed including cost, conveyance , royalty and taxes of all materials , all labour complete as directed by the Engineering - in - charge. | - | Cum | 881 | - |
| - | R.C.C /Plain Cement Concrete M20 using 20mm and down graded black hard granite crusher broken chips using cement, coarse and fine aggregates of approved quality, mixed in a concrete mixer of not less than 0.2 cum capacity / appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, spreading the concrete with shovels, rakes, compacted using needle / screed / plate vibrator and finished in continuous operation including provision of construction joints, curing of concrete for 14-days, as per the direction of Engineer in Charge. | 1 | Cum | 6,176.5 | ₹6,170.32 |
| - | Supplying, cutting, bending, binding, and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. | 1 | Qtl | 8,329.9 | ₹8,321.57 |
| - | Shoring and shuttering for C.C. / R.C.C. foundation, Plinth band, Footing base of column, mass concrete, pre - cast slab, Trough wall etc, and removing them after laying of filter materials and concrete. | - | sqm | 250.3 | - |
| 6 | Filiing in foundation and plinth with excavated materials including watering and ramming etc complete in all respect as per the direction of the Engineer-in-charge | 0.4 | Cum | 165.3 | ₹65.95 |
| 7 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1 km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the direction of Engineer-in-charge. (Measurement of the fill to be taken on the finished compacted section under PRR condition). (Item No.1,A/R-2006, Page 11) | - | Cum | 100.7 | - |
stage.html
html • 0.15 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
DTCN04.pdf
Tender Documents • 4.78 MB
BOQ_590147.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .