| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC 503 GIRIRAJ HEIGHT VAITY WADI L B S MARG NEAR HARINIWAS CIRCLE THANE 400 602 | THANE | MAHARASHTRA | 400602 | L1 | Accepted-AOC lowest tenderer | |
| 2 | L2₹4.6 L+₹1.1 L (30.9%)Rejected-Finance GARDEN AVENUE PLOT NO 242 243 244 RH 4 SECTOR 21 NERUL NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance GREATER THAN L1 |
Tender Value
₹5.8 L
EMD Value
₹11,600
Closing Date
22 Apr 2023, 6:00 pmClosed
P Bangar Raju,IDSE
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
PAINTING TO VARIOUS WATCH TOWERS AT INS SHIVAJI LONAVLA
2023_MES_587455_1
GE/LONAVLA/8042/E8
Open Tender
Civil Works
Item Rate
90 days
GE (I) (NAVY) LONAVLA
As per NIT /Tender documents
6 documents required · 6 mandatory
₹500
Yes
GEINDEPNAVYLONAVLA
₹11,600
Yes
12 Oct 2023
29 Mar 2023
24 Apr 2023
29 Mar 2023
22 Apr 2023
3 Apr 2023
29 Mar 2023 - 2 Apr 2023
Amount
Complete removal of existing treatment of external surface of stone/brick concrete wall/soffits/roof (new and old) including removing fungus /algae dirt, oil, grease and loose particles by wire brush,cleaning, washing and removing dust, . Cracks less than 2 mm, should be cleaned free of dust with a vaccum cleaner and apply Dr. Fixit Primeseal (Efflorescence resistant penetrating primer.) let it dry. Then pour Dr. Fixit Raincoat into these cracks and wait for it to dry Apply the first coat of Dr. Fixit Raincoat with camouflage pattern (3 Coats)without any dilution at the rate of 2 sqm per litre and allow it to dry before taking up the second and third coats, the rate of application being the same, Drying time between coats will be 6 to 8 hrs, A total thickness of 1 to 1.2 mm must be achieved when Dr. Fixit Raincoat is dry and including necessary scaffoldings etc , complete all as specified and directed Note:- (i)Application of primer and paint shall be done by the authorised applicator of the manufacturer of the paint and a certificate to this effect shall be produced by the contractor.Note-:(ii)The tint and pattern of camoflage paint is to be carried out by direction of Engr-in-Charge. Note-: (iII) Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for complete removal of existing treatment of old painted wall surfaces and applying 3.00 mm thick white cement based wall care putty smooth finish.etc of approved make & shade on walls and other places complete all as specified and as directed.Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for applying one coats of priming with alkali resistant priming paint over the putty surface and approved make & shade on walls etc, complete all as specified and as directed.Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for applying two coats of oil bound distemper over the primer surface of approved make & shade on walls etc, complete all as specified and as directed Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for preparation of old painted wood surfaces of any description having width/girth execeeding 10cm and apply two coats of synthetic enamel paint (camoflage pattern) complete all as specified and as directed. Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for preparation of old painted steel surfaces of any description having width or girth exceeding 10 cm and applying two coats of synthetic enamel paint (camoflage pattern)complete all as specified and as directed. Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc.
M&L for rendering in 15 mm thick in cement mortar 1:6 on brick/concrete walls and finished even and smooth without using extra cement complete all as specified and as directed. Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for rendering in 5 mm thick in cement mortar 1:3 as in ceiling and finished even and smooth without using extra cement complete all as specified and as directed. Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for preparation of new plastered surfaces on ceiling and applying three coat of white wash including crack filling with putty etc complete all as specified and directed Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M&L for preparing newly plastered surfaces of walls and applying two coats of oil bound distemper over a coat of alkali resistant primer over and including 3.00 mm thick white cement based wall care putty complete all as specified and as directed. Note:- Application of primer and paint shall be done by the authorised applicator of the manufacturer of the paint and a certificate to this effect shall be produced by the contractor. Note-: Pricing are inclusive all scafoldings used for up to the height of 4 storeys.
M/s S.D Construction Co
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .