| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.7 Cr+₹1.5 L (0.89%)Accepted-Finance | ₹1.7 Cr+₹1.5 L (0.89%) | L2 | Accepted-Finance L2 |
| 3 | L3₹1.7 Cr+₹3.9 L (2.36%)Accepted-Finance | ₹1.7 Cr+₹3.9 L (2.36%) | L3 | Accepted-Finance L3 |
| 4 | L4₹1.7 Cr+₹8.7 L (5.28%)Accepted-Finance | ₹1.7 Cr+₹8.7 L (5.28%) | L4 | Accepted-Finance L4 |
| 5 | L5₹1.8 Cr+₹14.5 L (8.80%)Accepted-Finance | ₹1.8 Cr+₹14.5 L (8.80%) | L5 | Accepted-Finance L5 |
Tender Value
Refer Docs
Closing Date
23 Jun 2021, 4:00 pmClosed
Executive Engineer Civil Division-II Leh
Executive Engineer Civil Division-II Chamber Leh
Construction of Boundary Wall around Power Department Complex Choglamsar Leh
2021_PDNRE_3417_1
NIT-08 OF CD-II/PDC/L 2021-22
Open Tender
Civil Works - Others
Item Rate
80 days
Choglamsar Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Payable To Executive Engineer CD-II Leh
Exempted
25 Jun 2021
17 Jun 2021
24 Jun 2021
17 Jun 2021
23 Jun 2021
17 Jun 2021
Amount
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In Mud Mortar
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In lime/mud mortar
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In Cement Mortar
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar
Demolishing of chainlink fencing manually/by means including stacking of servicable material and disposal of unservicable material within 50metres lead as per direction of Engineer-in-charge
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil
Dumping of Stone including cost
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundation,Plinth Beam, footing bases of column
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. upy floor five level excluding cost of centering, shuttering, finishing and reinforcement: (1:1.5:3) 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (Thermo- Mechanically treated bars.)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and laying cement blocks masonry in superstructure above plinth level upto floor V level in cement mortar 1:4 (1 Cement : 4 coarse sand ) and curing complete.
Providing & fixing upto floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases etc. including hoisting and setting in position with cement mortar 1:3 (1 cement:3 coarse sand) cost of required centring, shuttering and curing complete
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.
CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand)
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content : With water thinnable cement primer on wall surface having VOC content less than 50 grams/liter
EXTERIOR FINISHING Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Cement + steel 5 km by MT
Sand and coarse aggregate 10 km by MT
Dixon Engineering
M/S SIACHEN CONSTRUCTION
M/S TAMCHOS GURMET GOVT CONTRACTOR
M/s Showkat Ahmad Khan
M/S TSEWANG DORJEY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .