Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
16 Jul 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ADA Ajmer
ADA Ajmer
Survey Work for ADA Scheme and Non Scheme Area, Ajmer
2021_ADA_231218_1
NIT-08/2021-22
Open Tender
Survey
Percentage
365 days
ADA Ajmer
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
ADA Ajmer
₹30,000
Yes
17 Jul 2021
7 Jul 2021
17 Jul 2021
7 Jul 2021
16 Jul 2021
7 Jul 2021
120 days
Amount
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices. Open Area : (a) Up to 2 hect.
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices. Open Area : (b) 2 to 5 hect. (For area in excess of 2.0 hect.)
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices. Open Area : (c) Above 5 hect. (For area in excess of 5.0 hect.)
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Built-up Area : Up to 2 hect.
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Built-up Area : 2 to 5 hect. (For area in excess of 2.0 hect.)
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Built-up Area : Above 5 hect. (For area in excess of 5.0 hect.)
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Katchi Basti Area : (Dense Populated) Up to 2 hect.
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Katchi Basti Area : (Dense Populated) 2 to 5 hect. (For area in excess of 2.0 hect.)
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Katchi Basti Area : (Dense Populated) Above 5 hect. (For area in excess of 5.0 hect.)
Topographical survey by using Total station Equipment with a view of preparing Site plan by closing Travers specially Road Survey (contour not required) of Following Different areas Including outlines of civil structures & main physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. Drain, Water Supply Pipe Line, H.P. Electric Poles Telephone Pole, Boundary walls, true north as required and all complete. Taking plinth levels at all important structure by using / auto level with reference to BM. Including all modifications as per Direction of Engg. in Charge submission of four sets of print along with C.D. All above detail including level on a 1:500 scale on A-4 or A-2 Sheet. All the Drawings shall is prepared in digitized format through executable Auto-cad software on Compact Dices.Katchi Basti Area : (Dense Populated) Chauraha / Tiraha :
Topographical Survey along with preparation of Contour Plan with Total Station equipment by taking levels at a spacing of 5Mx5M or less in two mutually orthogonal directions. Keeping variation in levels within 0.25m of the sites and plotting contour at 0.25m intervals. Including outlines of civil structures & main physical structures such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line, Drain, Water Supply Pipe Line, H.P. Electric Poles, Telephone Pole, Boundary Walls and True North as required and all complete. Also works including taking plinth levels at all important structures by using auto level with reference to B.M. Submission of all survey work data's executed at computer in Auto-cad and Auto Plotter Software. Along with C.D. all details including level on a 1:500 scale on A-1 or A-2 sheet. All the Drawing shall be prepared in digitized format through executable. Auto-cad Software on Compact Discs Up to 2 hect.
Topographical Survey along with preparation of Contour Plan with Total Station equipment by taking levels at a spacing of 5Mx5M or less in two mutually orthogonal directions. Keeping variation in levels within 0.25m of the sites and plotting contour at 0.25m intervals. Including outlines of civil structures & main physical structures such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line, Drain, Water Supply Pipe Line, H.P. Electric Poles, Telephone Pole, Boundary Walls and True North as required and all complete. Also works including taking plinth levels at all important structures by using auto level with reference to B.M. Submission of all survey work data's executed at computer in Auto-cad and Auto Plotter Software. Along with C.D. all details including level on a 1:500 scale on A-1 or A-2 sheet. All the Drawing shall be prepared in digitized format through executable. Auto-cad Software on Compact Discs 2 to 5 hect. (For area in excess of 2.0 hect.)
Topographical Survey along with preparation of Contour Plan with Total Station equipment by taking levels at a spacing of 5Mx5M or less in two mutually orthogonal directions. Keeping variation in levels within 0.25m of the sites and plotting contour at 0.25m intervals. Including outlines of civil structures & main physical structures such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line, Drain, Water Supply Pipe Line, H.P. Electric Poles, Telephone Pole, Boundary Walls and True North as required and all complete. Also works including taking plinth levels at all important structures by using auto level with reference to B.M. Submission of all survey work data's executed at computer in Auto-cad and Auto Plotter Software. Along with C.D. all details including level on a 1:500 scale on A-1 or A-2 sheet. All the Drawing shall be prepared in digitized format through executable. Auto-cad Software on Compact Discs Above 5 hect. (For area in excess of 5.0 hect.)
Topography survey by using total station equipment of proposed of exist ion roads to draw L-section taking levels at 30mt. spacing and draw cross-section at every 30mt by taking levels at a spacing of 1.0 mtr. On both side of road in a width of 100 mtr. or as required giving offsets distances from center line of road at every 100mt along the route and at every point of change in directions from some permanent objects with bearing. Including taking outlines of civil structure and main physical structures such as Park, Tree, Road, Canal, Govt. Building, Power line, drain, water supply pipe line, elect. poles, tele pole, boundary walls, and true north as required and all complete. As per the direction of the engineer in charges taking plinth levels at all important structure by using auto level with reference to BM as per the direction of the Engineer-inCharge including providing one draft copy and incorporation of the ggestions/observation given on draft copy. L-section of road on a vertical scale of 1 cm = 1 mt. and horizontal is 1 cm = 30 mt. on A-2 size sheet with a space of minimum 3 rows below L-section and standard title blocks. Plan of road survey in scale of 1 cm = 5 mt. on A-2 size sheet. (A) Road
Topography survey by using total station equipment of proposed of exist ion roads to draw L-section taking levels at 30mt. spacing and draw cross-section at every 30mt by taking levels at a spacing of 1.0 mtr. On both side of road in a width of 100 mtr. or as required giving offsets distances from center line of road at every 100mt along the route and at every point of change in directions from some permanent objects with bearing. Including taking outlines of civil structure and main physical structures such as Park, Tree, Road, Canal, Govt. Building, Power line, drain, water supply pipe line, elect. poles, tele pole, boundary walls, and true north as required and all complete. As per the direction of the engineer in charges taking plinth levels at all important structure by using auto level with reference to BM as per the direction of the Engineer-inCharge including providing one draft copy and incorporation of the ggestions/observation given on draft copy. L-section of road on a vertical scale of 1 cm = 1 mt. and horizontal is 1 cm = 30 mt. on A-2 size sheet with a space of minimum 3 rows below L-section and standard title blocks. Plan of road survey in scale of 1 cm = 5 mt. on A-2 size sheet. (B) Nallah
Topography survey by using total station equipment with a view to Superimpose Revenue Khasra Maps. Including survey of all revenue civil structures and physical features such as village, gadar, culvert, wall, pond, bowari, nallah, road & other state time structures etc.
Topography survey by using total station equipment with a view to Superimpose Revenue Khasra Maps. It includes Marking of different types of revenue land in diff. colures according LRO such as Govt. land, Sawai Chak, Private Land, Forest etc. submission of four sets of print on a 1:40 scale on A-1 sheet along with C.D. All the drawing shall be prepared in digitized drawing with Auto-Cad software.
Leveling of proposed road taking initial levels and final levels before and after earth work including earth work quantity calculation by Auto Plotter Software and draw L-section & X-section of proposed road. All the drawings shall be prepaid in digitized format executable Auto-CAD software. Submission of four sets along with C.D. (A) Road
Leveling of proposed road taking initial levels and final levels before and after earth work including earth work quantity calculation by Auto Plotter Software and draw L-section & X-section of proposed road. All the drawings shall be prepaid in digitized format executable Auto-CAD software. Submission of four sets along with C.D. Open Area / Park : (a) Up to 1 hect.
Leveling of proposed road taking initial levels and final levels before and after earth work including earth work quantity calculation by Auto Plotter Software and draw L-section & X-section of proposed road. All the drawings shall be prepaid in digitized format executable Auto-CAD software. Submission of four sets along with C.D. Open Area / Park : (b) Above 1 hect. (For area in excess of 1.0 hect.)
Demarcation (Lay-out) by using total station equipment stack out method with X.Y.Z. Coordinates of developing concepts such as proposed road/boundary wall/proposed colony Layout road center line and both side (according department engg./grid pillars/plot pillars etc. on the ground using wooden pegs rate to include erection of wooden pegs, all materials such as lime, string. Labors etc. helping civil supervisor appointed in marking center point. Coordinates and levels on grid pillars reference to pre-established permanent B.M. indicating the pillars are representing survey. (A) Open Area : Up to 2 hect.
Demarcation (Lay-out) by using total station equipment stack out method with X.Y.Z. Coordinates of developing concepts such as proposed road/boundary wall/proposed colony Layout road center line and both side (according department engg./grid pillars/plot pillars etc. on the ground using wooden pegs rate to include erection of wooden pegs, all materials such as lime, string. Labors etc. helping civil supervisor appointed in marking center point. Coordinates and levels on grid pillars reference to pre-established permanent B.M. indicating the pillars are representing survey. (A) Open Area : 2 to 5 hect. (For area in excess of 2.0 hect.)
Demarcation (Lay-out) by using total station equipment stack out method with X.Y.Z. Coordinates of developing concepts such as proposed road/boundary wall/proposed colony Layout road center line and both side (according department engg./grid pillars/plot pillars etc. on the ground using wooden pegs rate to include erection of wooden pegs, all materials such as lime, string. Labors etc. helping civil supervisor appointed in marking center point. Coordinates and levels on grid pillars reference to pre-established permanent B.M. indicating the pillars are representing survey. (A) Open Area : Above 5 hect. (For area in excess of 5.0 hect.)
Demarcation (Lay-out) by using total station equipment stack out method with X.Y.Z. Coordinates of developing concepts such as proposed road/boundary wall/proposed colony Layout road center line and both side (according department engg./grid pillars/plot pillars etc. on the ground using wooden pegs rate to include erection of wooden pegs, all materials such as lime, string. Labors etc. helping civil supervisor appointed in marking center point. Coordinates and levels on grid pillars reference to pre-established permanent B.M. indicating the pillars are representing survey. (B) Roads / Boundary wall Up to 1 Km.
Demarcation (Lay-out) by using total station equipment stack out method with X.Y.Z. Coordinates of developing concepts such as proposed road/boundary wall/proposed colony Layout road center line and both side (according department engg./grid pillars/plot pillars etc. on the ground using wooden pegs rate to include erection of wooden pegs, all materials such as lime, string. Labors etc. helping civil supervisor appointed in marking center point. Coordinates and levels on grid pillars reference to pre-established permanent B.M. indicating the pillars are representing survey. (B)Roads / Boundary wall Above 1 km (for length in excess of 1.0 km.)
Preparation of Scheme plans showing all details, Area Analysis, plots details etc. as required as per Direction of Planning Section including Survey Work Etc.
Bidder Name
Amount
P S Consultancy Services(GSTN-22AANFP7404L1Z1)
M/S SURESH CHNDRA KHATIK(GSTN-NA)
green city surveyors private limited(GSTN-NA)
ADITYA CONSTRUCTION(GSTN-NA)
ADITYA CONSTRUCTION
M/S SURESH CHNDRA KHATIK
green city surveyors private limited
ADITYA CONSTRUCTION
green city surveyors private limited
P S Consultancy Services
stage.html
html • 0.02 MB
finance_412415.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .