The Executive Engineer (O&M) Dn., Sarangarh
Estimate for Rep. of 01+01 +1no Feeder control VcB at 33/11kv s/s Kedar & Khelbhatha under chhind dc & 06no 33kv AB switch in 33/11kv s/s New Sarangarh feeder of o&m Dn sarangarh
109004
EE/O&M/ SGH/T-1242
Chhattisgarh
16 Oct 2026
16 Oct 2026
5 Nov 2026
Name of Work :- Estimate for Rep. of 01+01 +1no Feeder control VcB at 33/11kv s/s Kedar & Khelbhatha under chhind dc & 06no 33kv AB switch in 33/11kv s/s New Sarangarh feeder of o&m Dn sarangarh
Sl. No. Name of Work Group NO/wo Internal Order No. Provision Cost of Estimate Material Cost Excluding (cent.)GST Labour Charges Total Tender Amount Contractor Quoted At par Total Value of awarded work CGST @9% On G SGST @9% On G Total Value of Work Including GST (ORDER AMT.) Company Supplied Amount OVERHEAD CHARGES Total Seving Estimate Cost - Total
11 KV LINE 133kv vcb A b switchIsolater Xmer DP
2 Estimate for Rep. of 11kv Feeder Control VcB on 11kv Gudiyari feeder at 33/11kv s/s Khelbhatha under Chhind dc of o&m Dn sarangarh L76028252256 L76028252256/4417/31.3.2026 0 1 0 244589.00 3731.68 12049.24 15780.92 0.00 15780.92 1420.28 1420.28 18621.48 153245.07 27176.00 199042.55 45546.45
3 Estimate for Rep. of 11kv Feeder Control VcB on 11kv Kutela feeder 33/11kv s/s Khelbhatha under Chhind dc of o&m Dn sarangarh L76028252117 L76028252117/4416/31.3.2026 0 1 0 0 244589.00 3731.68 12049.24 15780.92 0.00 15780.92 1420.28 1420.28 18621.49 153245.07 27176.00 199042.56 45546.44
ASSISTANT ENGINEER (O&M)S/ DN
11 KV LINE FOR MATERIAL SOR 2024-25 Kosir Uchchbhitti
UNIT With Gst GST RATE L76028252117/4416/31.3.2026 L76061230205
SL NO SHORT TEXT QTY AMOUNT QTY AMOUNT
2 11KV 45KN DISC INSULATOR T&C TYPE (POLYM NO 122.72 18.72 104.00 9 936.00
3 11 KV Strain hardware fittings. NO 158.71 24.21 134.50 9 1210.50
4 STAY SET WITHOUT STAY WIRE16mm Paint11KV NO 585.42 89.30135593 496.12 4 1984.47
8 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M M 149.25 22.76694915 126.48 6 758.90
13 ACSR CONDUCTOR 0.03 Sqmm (30 Sqmm AlEq) M3 32.59 4.971355932 27.62 330 9114.15
15 11KV 5KN PIN INSULATOR (POLYMER) L 135 20.59322034 114.41 18 2059.32
16 11KV cut point channel paint KG 3,829.65 584.1838983 3245.47 3 9736.40
18 ALUMINIUM SCRAP KG 102 15.55932203 86.44 0 0.00
Cenrage7.5% 4278.55
Cost of Material 59616.69
11 KV LINE FOR SERVICE #REF!
SL NO SHORT TEXT UNIT RATE AMOUNT #REF!
1 LABOUR SCH NO 22,555.54 1 22555.54 #REF!
2 desmentaling charge NO 1,165.86 6 6995.16 0.00
3 Transportation Charges NO 57047.34 0.02 1140.95 0.00
Service 30691.65 #REF!
TOTAL Service 25167.15
Total M+S Tender Amount 84783.84 #REF!
GST 15261.09 #REF!
SUPERVISION CHARGES FOR ESTIMATE 0.00 #REF!
OVERHEAD CHARGES 12907.70 #REF!
Saving 1507.44 #REF!
Est. Amt. 114460.08 #REF!
ASSISTANT ENGINEER (O&M)S/ DN #REF!
CSPDCL Gureli #REF! ASSISTANT ENGINEER (O&M)S/ DN
0.00 CSPDCL Gureli
LT LINE FOR MATERIAL RATE INCLUDING Incidental Charges @ 7.5% Ghughwa Tarapur
SL. NO SHORT TEXT UNIT RATE QTY. AMOUNT QTY. AMOUNT
2 Suspension clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 403.24 3.00 1209.72 3.00 1209.72
3 Piercing connector suitable for 25/16 Sq.mm-50/35 Sqmm AB Cable-for street light No 81.98 0.00 0.00 0.00 0.00
4 Piercing connector suitable for 50/35 Sqmm AB Cable-Distribution Box (3 Nos. per 3 phase DB & 1 No. per 1 phase DB) No 103.24 3.00 309.72 3.00 309.72
5 Piercing connector suitable for AB Cable to AB Cable Tee connections. No 143.90 0.00 0.00 0.00 0.00
6 Universal distribution connector ea 109.14 1.00 109.14 1.00 109.14
7 Anchor clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 555.56 3.00 1666.68 3.00 1666.68
8 (i) Stay Set 16 mm (Complete) No 414.80 2.00 829.60 2.00 829.60
11 (iii) Stay Insulator No 0.00 0.00 0.00 0.00 0.00
12 Concreting of stay and base pad for RSJ & H-beam No 2705.72
13 M.S. Nuts and Bolts12x100 mm Kg 65.22 0.00 0.00 0.00 0.00
14 M.S. Nuts and Bolts16x40 mm Kg 65.22 1.00 65.22 1.00 65.22
15 M.S. Nuts and Bolts16x65 mm Kg 64.14 1.00 64.14 1.00 64.14
16 Earthing Set (Coil earth as per Drawing No- G/004 No 107.97 5.00 539.85 5.00 539.85
17 Distribution box 1 phase 9 connectors No 931.12 0.00 0.00 0.00 0.00
18 Distribution box 3 phase 5 connectors No 1121.63 1.00 1121.63 1.00 1121.63
19 Stainless steel strap with buckle for installation of Service Distribution Box. Set 55.42 0.00 0.00 0.00 0.00
23 PVC insulated single core 16 sq.mm. cable @ 6 mtr. per 3 phase box m 16.55 0.00 0.00 0.00 0.00
24 End Clamp Cap for 50/70 sqmm No 27.20 2.00 54.40 2.00 54.40
25 Cable Tie for AB Cable No 5.07 0.00 0.00 0.00 0.00
26 Straight through joints No 159.15 0.00 0.00 0.00 0.00
28 G.I. Wires-Barbed wire Kg 71.51 0.00 0.00 0.00 0.00
29 ASCR weasel conductor 0.03 sqmm m 0.00 0.00 0.00 0.00 0.00
Cost of Material 18271.05 18271.05
LT LINE FOR SERVICE
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 SurveyTree cuttingApproach Clearance Km 4558.19 0.25 1139.55 0.25 1139.55 4558.19
2 Pit digging No 303.88 3.00 911.64 #REF! #REF! 303.88
3 Shifting of materials to pole pits No 60.78 3.00 182.34 #REF! #REF! 60.78
5 Transportation of pole from road side to pole pit for a lead of 1 Km. No 303.88 3.00 911.64 #REF! #REF! 303.88
6 Fixing of LT clamps complete per location including Service ring, distribution box, piercing connector No 75.97 3.00 227.91 #REF! #REF! 75.97
7 Pole erection complete with earthing No 759.70 3.00 2279.10 #REF! #REF! 759.7
8 Concreting of stay and base pad for poles m3 850.85 0.55 467.97 #REF! #REF! 850.85
9 Stay erection complete No 212.72 2.00 425.44 2.00 425.44
10 Painting of cross arm and numbering of poles. No 303.88 3.00 911.64 0.00 0.00 212.72
11 Stringing of line 0.00 0.00 60.78
12 Stringing of line 3P 5W ( Cable ) KM 16409.49 0.00 0.00 0.00 0.00 911.64
13 Stringing of line 3P 4W ( Cable ) KM 13066.83 0.21 2770.17 0.21 2770.17 60.78
14 Stringing of line 1P 3W ( Cable ) KM 9724.14 0.00 0.00 0.00 0.00
15 Labour charges for Concreting m3 578.84 0.55 318.36 0.00 0.00
16 Transportation Charges No 12621.46 0.25 3155.37 0.25 3155.37
TOTAL Service 14248.10 #REF!
Total M+S Tender Amount 32519.15 #REF!
Company Supllied Material
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 Conductor ACSR Scrap Kg 150.71 0.00 0.00 0.00 0.00
Total 0.00 0.00
SUPERVISION CHARGES FOR ESTIMATE 0.00 0.00
OVERHEAD CHARGES 6715.57 6715.57
Saving 15834.57 #REF!
LT LINE FOR MATERIAL RATE INCLUDING Incidental Charges @ 7.5% Ghughwa Tarapur
SL. NO SHORT TEXT UNIT RATE QTY. AMOUNT QTY. AMOUNT
4 Suspension clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 403.24 3.00 1209.72 3.00 1209.72 53.88 51972.648
5 Piercing connector suitable for 25/16 Sq.mm-50/35 Sqmm AB Cable-for street light No 81.98 0.00 0.00 0.00 0.00
6 Piercing connector suitable for 50/35 Sqmm AB Cable-Distribution Box (3 Nos. per 3 phase DB & 1 No. per 1 phase DB) No 103.24 3.00 309.72 3.00 309.72
7 Piercing connector suitable for AB Cable to AB Cable Tee connections. No 143.90 0.00 0.00 0.00 0.00
8 Universal distribution connector ea 109.14 1.00 109.14 1.00 109.14
9 Anchor clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 555.56 3.00 1666.68 3.00 1666.68
10 (i) Stay Set 16 mm (Complete) No 414.80 2.00 829.60 2.00 829.60
13 (iii) Stay Insulator No 0.00 0.00 0.00 0.00 0.00
14 Concreting of stay and base pad for RSJ & H-beam No 2705.72
15 M.S. Nuts and Bolts12x100 mm Kg 65.22 0.00 0.00 0.00 0.00
16 M.S. Nuts and Bolts16x40 mm Kg 65.22 1.00 65.22 1.00 65.22
17 M.S. Nuts and Bolts16x65 mm Kg 64.14 1.00 64.14 1.00 64.14
18 Earthing Set (Coil earth as per Drawing No- G/004 No 107.97 5.00 539.85 5.00 539.85
19 Distribution box 1 phase 9 connectors No 931.12 0.00 0.00 0.00 0.00
20 Distribution box 3 phase 5 connectors No 1121.63 1.00 1121.63 1.00 1121.63
21 Stainless steel strap with buckle for installation of Service Distribution Box. Set 55.42 0.00 0.00 0.00 0.00
25 PVC insulated single core 16 sq.mm. cable @ 6 mtr. per 3 phase box m 16.55 0.00 0.00 0.00 0.00
26 End Clamp Cap for 50/70 sqmm No 27.20 2.00 54.40 2.00 54.40
27 Cable Tie for AB Cable No 5.07 0.00 0.00 0.00 0.00
28 Straight through joints No 159.15 0.00 0.00 0.00 0.00
30 G.I. Wires-Barbed wire Kg 71.51 0.00 0.00 0.00 0.00
31 ASCR weasel conductor 0.03 sqmm m 0.00 0.00 0.00 0.00 0.00
Cost of Material 38304.68 18271.05
LT LINE FOR SERVICE
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 SurveyTree cuttingApproach Clearance Km 4558.19 0.25 1139.55 0.25 1139.55 4558.19
2 Pit digging No 303.88 2.00 607.76 #REF! #REF! 303.88
3 Shifting of materials to pole pits No 60.78 2.00 121.56 #REF! #REF! 60.78
5 Transportation of pole from road side to pole pit for a lead of 1 Km. No 303.88 2.00 607.76 #REF! #REF! 303.88
6 Fixing of LT clamps complete per location including Service ring, distribution box, piercing connector No 75.97 2.00 151.94 #REF! #REF! 75.97
7 Pole erection complete with earthing No 759.70 2.00 1519.40 #REF! #REF! 759.7
8 Concreting of stay and base pad for poles m3 850.85 0.50 425.43 #REF! #REF! 850.85
9 Stay erection complete No 212.72 2.00 425.44 2.00 425.44
10 Painting of cross arm and numbering of poles. No 303.88 2.00 607.76 0.00 0.00 212.72
11 Stringing of line 0.00 0.00 60.78
12 Stringing of line 3P 5W ( Cable ) KM 16409.49 0.00 0.00 0.00 0.00 911.64
13 Stringing of line 3P 4W ( Cable ) KM 13066.83 0.21 2770.17 0.21 2770.17 60.78
14 Stringing of line 1P 3W ( Cable ) KM 9724.14 0.00 0.00 0.00 0.00
15 Labour charges for Concreting m3 578.84 0.50 289.42 0.00 0.00
16 Transportation Charges No 12621.46 0.25 3155.37 0.25 3155.37
TOTAL Service 12368.53 #REF!
Total M+S Tender Amount 50673.20 #REF!
Company Supllied Material
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 Conductor ACSR Scrap Kg 150.71 0.00 0.00 0.00 0.00
Total 0.00 0.00
SUPERVISION CHARGES FOR ESTIMATE 0.00 0.00
OVERHEAD CHARGES 6715.57 6715.57
Saving -2319.48 #REF!
33/11 KV SS MATERIAL SOR 2024-25 Salheona Salheona Salheona Bonda
UNIT With Gst GST RATE 1 1 1 6
SL. NO SHORT TEXT QTY. AMOUNT QTY. AMOUNT QTY. AMOUNT QTY. AMOUNT
9 Bimetallic clamps for transformer &kiosk M3 413.24 63.03661017 350.20 6 2101.22 6 2101.22 6 2101.22
10 A.B Switch With complete Fiting 33kv no 23249 3546.457627 19702.54 0.00 0.00 0.00 6.00 118215.25
12 LIGHTNING ARRESTORS11 KV gapless type. NO 316.74 48.31627119 268.42 0.00 0.00 0.00
LT LINE FOR SERVICE
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT AMOUNT
2 LABOUR B-4 B. LABOUR OF STRUCTURE NO 578.84 1 578.84 1 578.84 1 578.84 0.00
3 Digging and concreting of foundation of NO 2,531.33 0 0.00 0 0.00 0 0.00 0.00
Total M+S Tender Amount 15780.92 15780.92 15780.92 140354.99
Company Supplied Material
SL NO SHORT TEXT UNIT RATE AMOUNT AMOUNT AMOUNT AMOUNT
SUPERVISION CHARGES FOR ESTIMATE 0.00 0.00 0.00 0.00
ASSISTANT ENGINEER (O&M)S/ DN
LT LINE FOR MATERIAL SOR 2025-26 Kosirdc Kosirdc
UNIT With Gst GST RATE 1 4
SL. NO SHORT TEXT QTY. AMOUNT QTY. AMOUNT
5 HARDWARE FOR 75X90MM LTSHACKLE INSULATOR NO 53.92 8.225084746 45.69 15 685.42 0 0.00
7 INSULATING PIERCING CONNECTOR FOR AB CAB NO 126.53 19.30118644 107.23 3 321.69 9 965.06
8 ACSR CONDUCTOR 0.03 Sqmm (30 Sqmm AlEq) M 32.59 4.971355932 27.62 240 6628.47 0 0.00
15 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M NO 149.25 22.76694915 126.48 8 1011.86 0.00 0.00
16 STAY SET WITHOUT STAY WIRE16mm Paint11KV NO 585.42 89.30135593 496.12 2 992.24 0.00 0.00
20 INSULATING PIERCING CONNECTOR FOR AB CAB NO 126.53 19.30118644 107.23 0 0.00 9.00 965.06
21 UDC- UNIVERSAL DISTRIBUTION CONNECTOR NO 158.95 24.24661017 134.70 0 0.00 2.00 269.41
22 ANCHOR CLAMP/ DEAD END CLAMP NO 784.09 119.6069492 664.48 0 0.00 2.00 1328.97
24 SCRAPS OF ALL ALUM. CABLE UNSERVICEABLE KG -103.13 -15.73169492 -87.40 0 0.00 0.00 0.00
ALUMINIUM SCRAP KG 103.13 -25 -2578.25 -120 -12375.60
13 LABOUR SCH NO 37278.95 4325.65
13 LABOUR SCH NO 0.00 2211.67
14 desmentaling charge NO 18639.48 0.00 3268.66
15 Transportation Charges No 57662.27 0.02 1153.25 1083.59
TOTAL Service 57071.68 10889.57
TOTAL Service 46798.77 0.00 8929.45
Total M+S Tender Amount 106207.46 0.00 54796.80
Company Supplied Material
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 Conductor ACSR Scrap Kg 102 102.00 -25.00 -2550.00 0.00 0.00
SUPERVISION CHARGES FOR ESTIMATE 0.00 0.00
OVERHEAD CHARGES 16302.98 9820.54
3 M 7130810681 11KV cut point channel paint JGCP 1 NO 3,978.44 3,978.44 E200426 1
5 M 7130870013 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M JGCP 1 NO 145.56 145.56 E200426 1
6 M 7130820008 11KV 5KN PIN INSULATOR (POLYMER) JGCP 5 NO 149.74 748.70 E200426 1
7 M 7130820030 Disc Insulator JGCP 3 NO 287.74 863.22 E200426 1
8 M 7130820241 11 KV Strain hardware fittings. JGCP 3 NO 154.41 463.23 E200426 1
9 M 7130310029 11KV ACSR COVERED CONDUCTOR 70SQMM JGCP 124 M 356.06 44,151.44 E200426 1
10 M 7130860032 STAY SET WITHOUT STAY WIRE16mm Paint11KV JGCP 1 NO 569.59 569.59 E200426 1
12 M 7130810026 Stay clamp LT/Pair JGCP 1 NO 362.87 362.87 E200426 1
15 M 7130210809 Aluminium Paint. JGCP 0.12 L 428.26 51.39 E200426 1
16 M 7130880112 ANTICLIMBING DEVICE JGCP 1 NO 196.00 196.00 E200426 1
19 M 7130620619 M S NUTS AND BOLTS: - 16x90mm JGCP 0.08 KG 83.34 6.67 E200426 1
20 M 7130620627 M S NUTS AND BOLTS: - 16x160mm JGCP 0.48 KG 81.93 39.33 E200426 1
28 N 3018603 Stay Pit digging 1 NO 324.64 324.64 E200424 1
29 N 3018603 Transportation of pole from road side to 1 NO 321.99 321.99 E200424 1
30 N 3018603 Shifting of materials to pole pits 1 NO 68.2 68.20 E200424 1
31 N 3018603 Cross arm fixing complete with top clamp 1 NO 96.6 96.60 E200424 1
32 N 3018603 Pole erection complete (including earthi 1 NO 1,073.30 1,073.30 E200424 1
33 N 3018603 Concreting of stay and poles 0.75 NO 642.68 482.01 E200424 1
34 N 3018603 Stay erection complete 1 NO 223.89 223.89 E200424 1
35 N 3018603 Insulator fixing with GI Pin 5 NO 22.89 114.45 E200424 1
36 N 3018603 Anti climbing devices and danger board f 1 NO 96.60 96.60 E200424 1
37 N 3018603 Painting of cross arm & numbering of pol 1 NO 111.94 111.94 E200424 1
38 N 3018603 Stringing of line (Rabbit) all three con 0.04 NO 11,194.40 447.78 E200424 1
39 N 3018603 Twisting of jointing sleeves 1 NO 644.68 644.68 E200424 1
21 V Transportation Charge 0.02 49,596.07 991.92 E200424 1
22 V Overhead Charges 0.125 58,784.92 7,348.12 E200424 1
23 V INCIDENTAL CHARGES 0.075 NO 49,596.07 3,719.71 E200424 1
25 V GST on Material 1- NO 8,927.29 8,927.29- E200424 1
29 V INCIDENTAL CHARGES 0.075 NO 77,640.05 5,823.00 E200424 1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.00 MB
261677-NIT_TD109004.pdf
pdf • 0.80 MB
261678-BOQ_TD109004.xlsx
xlsx • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .