Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC | ₹32.1 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹32.7 LRejected-Finance | ₹32.7 L | L2 | Rejected-Finance Refer to Financial minutes. |
| 3 | L3₹33.3 LRejected-Finance VILL P O MULAGAON P S BONGAIGAON DIST BONGAIGAON ASSAM PIN 783380 | BONGAIGAON | BONGAIGAON | ASSAM | 783380 | ₹33.3 L | L3 | Rejected-Finance Refer to Financial minutes. |
| 4 | L4₹33.4 LRejected-Finance | ₹33.4 L | L4 | Rejected-Finance Refer to Financial minutes. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Admitted. Refer to Technical minutes. |
| Sl No | Description | Qty | Unit | BIPUL KAKATI L4 | MD SONAR UDDIN L1 | Saiful Islam L2 | POLEN CHOUDHURY L3 |
|---|---|---|---|---|---|---|---|
| 1.00PART-A(Construction of R.C.C Check Dam) | |||||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed | 0.03 | Ha | 46,879.54 ₹1,500.15 | 44,926.23 ₹1,437.64 | 45,763.36 ₹1,464.43 | 45,000 ₹1,440 |
| 1.02 | Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material. (Above GBL) | 298.91 | Cum | 121.95 ₹36,452.56 | 116.87 ₹34,934.08 | 119.05 ₹35,585.71 | 120 ₹35,869.68 |
| 1.03 | Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material. (Below GBL) | 67.81 | Cum | 133.95 ₹9,082.88 | 128.37 ₹8,704.51 | 130.76 ₹8,866.57 | 130 ₹8,815.04 |
| 1.04 | Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 8.21 | Cum | 5,514.79 ₹45,276.43 | 5,285 ₹43,389.85 | 5,383.49 ₹44,198.45 | 5,200 ₹42,692 |
| 1.05 | RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work. | 65.21 | Cum | 7,218.74 ₹4.7 L | 6,918 ₹4.5 L | 7,046.87 ₹4.6 L | 7,200 ₹4.7 L |
| 1.06 | Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications. | 39.13 | Cum | 5,769.2 ₹2.3 L | 5,528.8 ₹2.2 L | 5,631.83 ₹2.2 L | 5,400 ₹2.1 L |
| 1.07 | Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications. | 240.47 | Sqm. | 129.52 ₹31,145.67 | 124.12 ₹29,847.14 | 126.44 ₹30,405.03 | 120 ₹28,856.40 |
| 1.08 | Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600mm with smaller size towards the soil and bigger size toward the Head Wall to the full height compact to a firm condition complete as per drawing and specification. | 26.1 | Cum | 1,812.87 ₹47,315.91 | 1,737.33 ₹45,344.31 | 1,769.71 ₹46,189.43 | 1,800 ₹46,980 |
| 1.09 | Earh Work in filling in front of the guid bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary.(In front & both side of the structure) | 82.41 | Cum | 90.06 ₹7,422.02 | 86.31 ₹7,112.98 | 87.92 ₹7,245.66 | 80 ₹6,592.96 |
Tender Value
₹39.8 L
EMD Value
₹79,640
Closing Date
19 Jan 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Land Development Project at Saonagaon under RIDF-XXXI
2025_SCD_49657_11
Tender/NIT/Pt-I/2025-26/5725
Open Tender
Civil Works
120 days
Barpeta S. C. Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹79,640
Yes
O/o The DSC, Assam
13 May 2026
26 Dec 2025
19 Jan 2026
3 Jan 2026
19 Jan 2026
8 Jan 2026
7 Jan 2026
PART-A(Construction of R.C.C Check Dam)
Clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material. (Above GBL)
Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material. (Below GBL)
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.
Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600mm with smaller size towards the soil and bigger size toward the Head Wall to the full height compact to a firm condition complete as per drawing and specification.
Earh Work in filling in front of the guid bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary.(In front & both side of the structure)
Earh Work in filling in front of the guid bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary.(In Periphery Bund)
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering as per Technical Specification.
Providing & laying boulder apron on gully bed in up stream and down stream of RCC structure for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.
Providing Weep Holes in RCC Head Wall etc. with 100mm dia AC pipe extending through full width of the structure with slope of IV:20H towards drawing face. Complete as per drawing and Technical specification.
R.C.C. works for slab and Post with aggregate in size 13mm to 38 mm of down graded gravel in proportion 1:2:4 including necessary shuttering, curing etc. complete as directed. (Payment of M/S Road will be made Separately ) (E) R.C.C. Grade M 20
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
Cement plastering works to the exposed Posts, slabs in prop 1:3 including curing etc. complete .
Construction of diversion channel to flow the water of the propose site.
Earthwork in filling the diversion channel after completion of work.
Earth work in excavation of foundation of structures as per draw-ing and technical specification.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications .
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Cost of RCC sign board including painting , writing & fitting fixing at project sit, complete.
PART-B( Earthen Channel on LDP)
Clearing and grubbing road land including uprooting rank vegeation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. as directed
Construction of unline surface drain of average cross sectional area 0.40 sqmtr. in soil to specified line, grades, level and dimension. Excavated material to be used in embankment
Earth work in filling for construction of coffer dam
Earth work in excavation of foundation of structures as per draw-ing and technical specification,
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications .
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Cost of RCC sign board including painting , writing & fitting fixing at project sit, complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BIDBarpetaSaonagaon.pdf
Tender Documents • 1.13 MB
BOQ_78874.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid