Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74.8 LAdmitted-Fee/PreQual/Technical/Finance | -4.89% | ₹74.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹79.5 L+₹4.7 L (6.31%)Admitted-Fee/PreQual/Technical/Finance | +1.11% | ₹79.5 L+₹4.7 L (6.31%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹92.8 L
EMD Value
₹1.9 L
Closing Date
16 Sept 2026, 6:00 pmClosed
SE PWD Circle Salumber
salumber
CONSTRUCTION OF VARIOUS NON PATCHABLE ROADS IN DIVISION SALUMBER UNDER PACKAGE NO RJ-48-05/NP/25-26
2026_CEPWD_593835_5
SE PWD Salumber NIT 1
Open Tender
Civil Works - Roads
Percentage
90 days
Salumber
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
17826-Xen PWD
₹1.9 L
Yes
18 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
16 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing and Grubbing Road Land .Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | |||||
| 1.01 | Bassi to Naya Ghar Dhuni Km. 0/0 to 1/500 | 0.34 | P.Hect | 10,374 | ₹3,527.16 |
| 1.02 | Dangiwara to Nayi Basti Km. 0/0 to 1/250 | 0.28 | P.Hect | 10,374 | ₹2,904.72 |
| 1.03 | Dal to Kapurawato Ka Bada Km. 0/0 to 0/500 | 0.11 | P.Hect | 10,374 | ₹1,141.14 |
| 1.04 | Makadseema to Jambuda | 0.5 | P.Hect | 10,374 | ₹5,187 |
| 1.05 | Isarwas Rawan Primary School to State Highway Km. 0/0 to 0/750 | 0.24 | P.Hect | 10,374 | ₹2,489.76 |
| 2Construction of Subgrade and Earthen Shoulders: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | |||||
| 2.01 | Bassi to Naya Ghar Dhuni Km. 0/0 to 1/500 | 337.5 | P.Cum | 45 | ₹15,187.5 |
| 2.02 | Dangiwara to Nayi Basti Km. 0/0 to 1/250 | 281.25 | P.Cum | 45 | ₹12,656.25 |
| 2.03 | Dal to Kapurawato Ka Bada Km. 0/0 to 0/500 | 112.5 | P.Cum | 45 | ₹5,062.5 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.75 MB
Tendernotice_2.pdf
PDF • 0.77 MB
005FBid_compressed.pdf
Tender Documents • 10.65 MB
BOQ_1053989.xls
BOQ • 0.41 MB
1se.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .