Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance GMD ROAD MORADABAD MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | L1 | Admitted-Finance | |
| 2 | L2₹6.1 L+₹51,602 (9.19%)Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | L2 | Admitted-Finance | |
| 3 | L3₹6.4 L+₹78,572 (14.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹13.8 L+₹8.1 L (145.1%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Versha and Brothers L2 | M/S SATKAR TRADERS L1 | Meena Elect & Engg. Works L4 | Perfect Power Transformer Associates L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling & safe stacking of Mulsifire air Pipe line, water pipe line and proper stacking. | 1 | Job | 13,000 ₹13,000 | 300 ₹300 Lowest | 24,800 ₹24,800 | 9,990 ₹9,990 |
| 2.00 | Drain out of the T/F oil from 100 MVA T/F tank into empty oil drums/Oil tanker including opening of valve and filling in empty oil drums and proper stacking. | 1 | Job | 20,000 ₹20,000 | 500 ₹500 Lowest | 45,000 ₹45,000 | 8,500 ₹8,500 |
| 3.00 | Dismantling of 100 MVA T/F HV/ LV/TV/Neutral Bushing and its Turret opening of all pipe line 6'', 4'' & 2'' inlet, Outlet valve, diverter switch inspection cover, Buchholz relay, PRV for replacement of gasket. | 1 | Job | 65,000 ₹65,000 | 55,000 ₹55,000 Lowest | 1,25,000 ₹1,25,000 | 60,000 ₹60,000 |
| 4.00 | Replacement of old and damage gasket of 100 MVA T/F Top Cover Rim Gasket, HV,LV Side and Neutral Bushing with its turrets, OLTC Pipeline with all valves, Surge relay, Bucholze Relay, inspection Cover, Tap Changer, Gear Box, RPV , Radiator Header, Conservator, Oil pump and expansion joints, etc keeping all parts safely make of good quality rubberized cork sheet Kotika/Telbroze/NU Cork make. | 1 | Job | 2,00,000 ₹2,00,000 | 1,59,999 ₹1,59,999 Lowest | 3,70,000 ₹3,70,000 | 1,99,500 ₹1,99,500 |
| 5.00 | Erection of turret HV/LV/TV side and erection of bushing, oil pipe line 6” & 4”3”,Gear box, OLTC pipe line, Pump, Flow meter, Inspection Cover etc. for complete of work. | 1 | Job | 60,000 ₹60,000 Lowest | 99,999 ₹99,999 | 1,25,000 ₹1,25,000 | 80,000 ₹80,000 |
| 6.00 | Complete evacuation of 100 MVA Transformer main tank and filling of Dry air/ Dry Nitrogen of dew point -500 C or better in vacuum up to pressure of 0.25Kg/Cm2 and the again evacuating the Transformer tank after required time interval (approx 12/24 Hrs) using centrifuging machine the work shell including connecting pipe of machine as required measuring Due Point values of N2 after every cycle till the required value is achieved. | 2 | Job | 30,000 ₹60,000 | 2,000 ₹4,000 Lowest | 85,000 ₹1,70,000 | 40,000 ₹80,000 |
| 7.00 | Cleaning and flushing of T/F core winding in main tank with hot T/F oil through centrifuging machine. | 1 | Job | 13,000 ₹13,000 | 1,500 ₹1,500 Lowest | 27,500 ₹27,500 | 9,990 ₹9,990 |
| 8.00 | Overhauling of diverter switch, removal the diverter switch from chamber cleaning by hot Oil, removed the dirty oil and proper cleaning and fixing in original shape. | 3 | Job | 5,000 ₹15,000 | 1,200 ₹3,600 Lowest | 20,000 ₹60,000 | 7,500 ₹22,500 |
| 9.00 | Create the vacuum inside the tank & filling the T/F oil. | 1 | Job | 6,000 ₹6,000 | 1,200 ₹1,200 Lowest | 45,000 ₹45,000 | 9,990 ₹9,990 |
| 10.00 | Re -centrifuging of T/F oil already filled in oil tanker taking the IR/BDV value oil T/F oil at an interval of 6 hrs. as per norms of T/F manufacturer. After achieving the desired value, top up the centrifuged T/F at required level (machine shall be provide by the contractor) (Approx 50 KL). | 45,000 | Ltr | 2.2 ₹99,000 | 4 ₹1,80,000 | 4.1 ₹1,84,500 | 2 ₹90,000 Lowest |
Tender Value
₹1 Cr
EMD Value
₹10,000
Closing Date
9 Aug 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE,ETD-II GZB
132 kv sub-station lalkuan ghaziabad
as per document
2021_UPTCL_605852_1
T-16/ETC/GZB/21-22
Open Tender
Electrical Works
Fixed-rate
30 days
220 KV S/S Madhuban Bapudham
as per document
2 documents required · 2 mandatory
₹1,180
As per NIT
₹10,000
11 Aug 2021
24 Jul 2021
10 Aug 2021
24 Jul 2021
9 Aug 2021
24 Jul 2021
120 days
Amount
Dismantling & safe stacking of Mulsifire air Pipe line, water pipe line and proper stacking.
Drain out of the T/F oil from 100 MVA T/F tank into empty oil drums/Oil tanker including opening of valve and filling in empty oil drums and proper stacking.
Dismantling of 100 MVA T/F HV/ LV/TV/Neutral Bushing and its Turret opening of all pipe line 6'', 4'' & 2'' inlet, Outlet valve, diverter switch inspection cover, Buchholz relay, PRV for replacement of gasket.
Replacement of old and damage gasket of 100 MVA T/F Top Cover Rim Gasket, HV,LV Side and Neutral Bushing with its turrets, OLTC Pipeline with all valves, Surge relay, Bucholze Relay, inspection Cover, Tap Changer, Gear Box, RPV , Radiator Header, Conservator, Oil pump and expansion joints, etc keeping all parts safely make of good quality rubberized cork sheet Kotika/Telbroze/NU Cork make.
Erection of turret HV/LV/TV side and erection of bushing, oil pipe line 6” & 4”3”,Gear box, OLTC pipe line, Pump, Flow meter, Inspection Cover etc. for complete of work.
Complete evacuation of 100 MVA Transformer main tank and filling of Dry air/ Dry Nitrogen of dew point -500 C or better in vacuum up to pressure of 0.25Kg/Cm2 and the again evacuating the Transformer tank after required time interval (approx 12/24 Hrs) using centrifuging machine the work shell including connecting pipe of machine as required measuring Due Point values of N2 after every cycle till the required value is achieved.
Cleaning and flushing of T/F core winding in main tank with hot T/F oil through centrifuging machine.
Overhauling of diverter switch, removal the diverter switch from chamber cleaning by hot Oil, removed the dirty oil and proper cleaning and fixing in original shape.
Create the vacuum inside the tank & filling the T/F oil.
Re -centrifuging of T/F oil already filled in oil tanker taking the IR/BDV value oil T/F oil at an interval of 6 hrs. as per norms of T/F manufacturer. After achieving the desired value, top up the centrifuged T/F at required level (machine shall be provide by the contractor) (Approx 50 KL).
Painting of 100 MVA T/F 1 coat of red oxide and 2 coat of smoke grey/aluminium enamel paint as per site incharge.
Erection of mulsifire system air/water pipe line proper replacement of gasket and Tightening nut and bolts.
Versha and Brothers
Perfect Power Transformer Associates
Meena Elect & Engg. Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .