Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.1 LAccepted-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹21.9 L+₹4.8 L (28.1%)Rejected-Finance 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹23.9 L+₹6.7 L (39.4%)Rejected-Finance | L-3 | Rejected-Finance L-3 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
14 Oct 2021, 5:00 pmClosed
Superintenging Engineer
EDC Ayodhya
Installation of Single and Three Phase Meters on Un-Metered Private Tubewell in Electricity Distribution Division-IInd, Ayodhya Under the supervision of Electricity Test Division, Ayodhya
2021_MVVNL_628993_1
67 H(F)(W)/2021-22
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
as per Tender Specification
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹30,000
18 Oct 2021
8 Oct 2021
15 Oct 2021
8 Oct 2021
14 Oct 2021
8 Oct 2021
Amount
Installation of Single Phase Meters on Un-Metered Private Tubewell in Electricity Distribution Division-IInd, Ayodhya under the supervision of Electricity Test Division, Ayodhya. Meters and list to be provided by department for through Test Division, Ayodhya.
Installation of Three Phase Meters on Un-Metered Private Tubewell in Electricity Distribution Division-IInd, Ayodhya under the supervision of Electricity Test Division, Ayodhya. Meters and list to be provided by department for through Test Division, Ayodhya.
M/S BALAJI ENTERPRISES
M/s Shukla Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .