| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.9 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹8.3 L+₹43,928.52 (5.59%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹9.8 L+₹1.9 L (24.3%)Rejected-Finance | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹9.8 L+₹2.0 L (25.1%)Rejected-Finance | L-4 | Rejected-Finance L-4 |
Tender Value
₹12.8 L
EMD Value
₹13,000
Closing Date
12 Jun 2020, 12:00 pmClosed
SE
132 KV S/S Ghazipur
CONSTRUCTIO OF RETAINING WALL AROUND THE LOC.NO. 57A AT 132 KV AZAMGARH-MOHAMDABAD DC LINE UNDER ETD-MAU
2020_UPTCL_477757_1
Short Term E-Tender No. 28 ETC(GZP)/2020-21
Open Tender
Electrical Works
Turn-key
30 days
MAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,534
EE ETD-II Varanasi
₹13,000
26 Jun 2021
1 Jun 2020
12 Jun 2020
1 Jun 2020
12 Jun 2020
1 Jun 2020
Amount
Cost of four sided rataining wall at location no. 57A of 132 KV Mohamdabad - Azmgarh line under Electrictity Transmission Divison Mau, as per drawing and technical specification. The job includes the following work:-
Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth.
Concreting with 40mm stone ballast coarse sand and cement mortar in 8:4:1 ratio in foundation under floor including the cost of material and T&P required for the completion of the job satisfactorily
First class brick work of the construction of retaining wall in 1:4 ratio in cement and sand including the cost of material labour and T&P requirerd for the completion of the job satisfactorily.
Concreting in plinth with 20 mm stone ballast, coarse sand and cement mortal in ration 4:2:1 including the cost of material, labour and T&P required for the completion of the job satisfactorily.
Earth filling under floor and in the area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth with complete cost of earth royalty taxes, freight etc. and cost of material, labour and T&P required for the completion of the job satisfactorily.
First class brick on edge floor laid including preparation of base to proper slope including supply of all material and T&P etc. required to complete the job satisfactorily.
12 mm thick plaster work in wall with cement and sand in 1:4 ration including the cost of material, labour and T&P required for the completion of the job satisfactorily.
PRIZE ENGINEERING WORKS
M/s. ADITYA TRADING CO., KM-383, RAIDOPUR OFFICERS COLONY, AZAMGARH, U.P.-276001.
M/S SHEKHAR ENGINEERING WORKS
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .